cocog14 35th ave storm sewer.docx 1 of 2 Anderson Consulting Engineers, Inc.

Installation of Box Culvert Under Suspended Water Line

Outlet Structure and Downstream Channel Immediately After Installation and After Landscaping

35th Avenue/22nd Street Storm Sewer Project Greeley, Colorado 

 Client:    Mr. Bert Leautaud       City of Greeley Stormwater Division 

1001 9th Ave. Greeley, Colorado 80631 (970) 336‐4121 

 This project was  identified  as  a major  capital  improvement  in  the City of Greeley Master Drainage Plan (completed  by  ACE  in  2006),  includes  the  capture  and  conveyance  of  stormwater  flows  from  the intersection of 35th Avenue and 22nd Street  in a complex  inlet and  storm  sewer  system  to  the Sanborn Park Channel northeast of this intersection.   The  purpose  of  the  project  is  to  capture stormwater on the west side of 35th Avenue in an inlet gallery and convey the  flows to the Sanborn Park  Channel  via  a  4'H  x  7'W  RCBC  and  a  small drainage  channel.    This  project  consists  of  the following components:  

Hydrologic  investigation  of  the  tributary drainage basin to define design discharges for the infiltration gallery; 

Hydraulic design of the infiltration gallery, 4'H x 7'W RCBC, outlet structure, and downstream channel restoration measures using Haested’s StormCAD™ and HEC‐RAS; 

Final  design  of  the  35th  Avenue/22nd  Street  storm  sewer  system  including  the  design  of  the infiltration  gallery,  storm  sewer  box  culverts  and  pipes, manholes,  utility  conflict  resolution,  street infrastructure replacement, channel grading and erosion protection measures; and 

Preparation of final construction plans, technical specifications, and contract documents. 

Bidding and construction services including shop drawing review and construction observation. 

cocog14 35th ave storm sewer.docx 2 of 2 Anderson Consulting Engineers, Inc.

New Inlet Gallery on West (Upstream) Side of 35th Avenue 