b:11i54designimport ev01 2012-04-06 11154 corelaba-601 - reflected ceiling...

Post on 13-Jun-2020

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

ES

PS

CJ

P

CEILING DETAIL TAG

CEILING TYPE

FLUORESCENT PENDANT

1.

3.

2.

5.4.

6.

7.

8.THE CONTRACTOR SHALL COMPARE THIS REFLECTED CEILING PLAN WITHELECTRICAL LIGHTING PLANS, MECHANICAL SUPPLY, RETURN, AND EXHAUST PLANS.THE CONTRACTOR SHALL REPORT ANY OMISSIONS OR INCONSISTENCIES TO THE ARCHITECT.SEE ELECTRICAL DRAWINGS FOR THE LOCATIONS OF CEILING MOUNTED SMOKEDETECTORS, SPEAKERS, EXIT SIGNAGE, AND FIRE ALARM DEVICES, ETC.ALSO SEE ELECTRICAL FOR LOCATIONS OF WALL MOUNTED EXIT LIGHTS.

FOR FURTHER DIMENSIONS SEE LARGE SCALE PLANS, SECTIONS, ELEVATIONS, AND DETAILS.

THE CONTRACTOR SHALL VERIFY THAT ACCESS PANELS OF TYPE SPECIFIED AREINSTALLED IN NON-ACCESSIBLE TYPE CEILINGS WHERE SERVICE OR ADJUSTMENTTO MECHANICAL, PLUMBING, OR ELECTRICAL ITEMS MAY BE REQUIRED. ACCESSPANELS SHALL BE EQUAL TO THE RATING OF THE WALL OR CEILING IN WHICH THEYOCCUR.

18" MINIMUM VERTICAL CLEARANCE SHALL BE MAINTAINED BETWEEN THE BOTTOMOF THE EXTENDED SPRINKLER HEADS AND THE TOP OF ANY FILES, SHELVING,LOCKERS, ETC.

ALL CEILING ELEMENTS TO BE PLACED IN THE CENTER OF CEILING TILE OR CENTEROF GYP. BOARD CEILING AREA U.N.O.

ALL CEILING GRIDS TO BE CENTERED BETWEEN WALLS U.N.O.

RCP LEGENDSUSPENDED 2' X 2' ACOUSTICALCEILING SYSTEM (APC)

RCP PLAN GENERAL NOTES

NEW RECESSEDFLUORESCENT LIGHT FIXTURE

FOR ADDITIONAL INFORMATIONREFER TO MECHANICAL DRAWINGS

REFER TO MECHANICAL DRAWINGSFOR ADDITIONAL INFORMATIONRETURN AIR GRILLE

SUPPLY AIR GRILLE

UNDER COUNTER TASK LIGHTING

GYP. BOARD CEILING

EXPOSED STRUCTURE, PAINT ALL ITEMSABOVE CEILING IN OCCUPIED SPACES

SHOWER DOME LIGHT (BY SHOWERMANUFACTURER).WALL MOUNTED LIGHT FIXTURE

RECESSED CAN LIGHT FIXTUREWHERE NO HEIGHT IS DESIGNATED, 9'-0".

EXPANSION JOINT(RE: SPECS FOR JOINT COVER)

CEILING HEIGHT DESIGNATION PER AREA.SOFFIT/GYPBD/PLASTER CONTROLJOINT

SUPPLY STRIP DIFFUSER RE: MECHANICALTRACK LIGHT

SUSPENDED CEMENT PLASTER SOFFIT

1A-###

FLUORESCENT STRIP COVE LIGHTING

9'-0" AFF

SPRINKLER HEADS ARE NOT SHOWN ON ARCHITECTURAL REFLECTED CEILINGPLANS. CONTRACTOR TO INSTALL SUFFICIENT HEADS IN ALL SPACES TO PROVIDE100% COVERAGE AS REQUIRED UNDER NFPA 13 AND OWNERS' INSURANCECOMPANIES' REQUIREMENTS. CENTER ALL SPRINKLER HEADS IN CEILING TILESAND GYPSUM BOARD CEILINGS. REFER TO A-620 FOR MOUNTING DETAILS ATMONUMENTAL STAIR. REFER TO REFLECTED CEILING PLANS FOR MOUNTINGLOCATIONS AT ATRIUM BALCONIES AND MONUMENTAL STAIR LANDINGS.

PAINT ALL ELEMENTS AND STRUCTURE EXPOSED ABOVE CEILING9.IN OCCUPIED SPACES, INCLUDING STORAGE ROOMS, WORKSHOPAND NEW SERVER ROOM. DO NOT PAINT EXISTING TELE DATA ROOM.CONTRACTOR SHALL PAINT ALL ITEMS ABOVE THE CELING AT ANY PARTICULARLOCATION WHERE ANY ITEMS ABOVE CEILING ARE EXPOSED, SUCH AS PERIMETERCEILING CONDITIONS.

10.

EXISTING CEILING TO REMAINV.I.F

ALL CEILING HEIGHTS ARE 9'-0" U.N.O.11.

0'

1'

3'

6'

10'SCALE: 1/8"=1'-0"

TRUE NORTHN

NO CEILINGIN THIS ROOM

NO CEILING INTHIS ROOM

A.F.F.6' - 4" A.F.F.6' - 4"

EXISTING CEILINGTO REMAIN

EXISTING CEILINGTO REMAIN

EXISTING CEILINGTO REMAIN

EXIS

TIN

G C

EILI

NG

TO R

EAM

IN

EXIS

TIN

G C

EILI

NG

TO R

EAM

IN

EXISTING CEILINGTO REMAIN

EXISTING CEILINGTO REMAIN

EXISTING CEILINGTO REMAIN

EXISTING CEILINGTO REMAIN

EXISTING CEILINGTO REMAIN

FROZEN SECTION

ALL EXISTING LIGHTFIXTURES TO REMAIN

EQ

EQ

EQ

EQ

EQ

EQ

6'-0"

4'-2"

EQ

EQ

4'-10"

ES

1

A-620

Sim

3

A-620

Sim3

A-620

Sim

1

A-620

Sim

ALIGN

ALIGN

ALIGNALIGN

A-6204

A-6207

A-6206

A-6205

NO CEILING INTHIS ROOM

A.F.F.6' - 4"

EXISTING CEILINGTO REMAIN

EXISTING CEILINGTO REMAIN

NO CEILINGIN THIS ROOM

NO CEILINGIN THIS ROOM

A.F.F.8' - 6"

ES

ES

ES

1

A-620

Sim

ALIGN

EQEQ

4'-4"

4'-4" 13'-0"

A-6208

A.F.F.8' - 6"

A.F.F.8' - 6"

4'-10"

A.F.F.8' - 6"

AUTOCLAVEROOM2.211

CORRIDOR2.187

CORRIDOR2.188

CORRIDOR2.187

CORRIDOR2.188

CORRIDOR2.187

CORRIDOR2.188

CORRIDOR2.187

CORRIDOR2.188

MICROBIOLOGY2.220

CORRIDOR2.187

CORRIDOR2.188

TANK RM.2.210

ID CULTURES2.217

AUTOCLAVEROOM2.211

CORRIDOR2.187

CORRIDOR2.188

CORRIDOR2.187

CORRIDOR2.187

CORRIDOR2.187

AFB - FUNGUSROOM2.213

CORRIDOR2.187

TANK RM.2.210

CORRIDOR2.178

AUDIO/OFFICE2.216

OFFICE2.218

OFFICE2.219

GAS ROOM2.223

SR TECH OFFICE2.222

OFFICE2.156

ELEV.2.152

ELEV.2.153

ELEV.2.153

ELEV2.152

CORRIDOR2.209

CORRIDOR2.299

DRY SUPPLYSTORAGE

2.292B

ELEVATOR LOBBY2.151

OFFICE2.156

ELEV.2.152

ELEV.2.153

ELEV.2.153

ELEV2.152

CORRIDOR2.209

CORRIDOR2.299

DRY SUPPLYSTORAGE

2.292B

ELEVATOR LOBBY2.151

OFFICE2.156

ELEV.2.152

ELEV.2.153

ELEV.2.153

ELEV2.152

CORRIDOR2.209

CORRIDOR2.299

DRY SUPPLYSTORAGE

2.292B

ELEVATOR LOBBY2.151

ELEV.2.152

ELEV.2.153

ELEV.2.153

ELEV2.152

CORRIDOR2.209

CORRIDOR2.299

DRY SUPPLYSTORAGE

2.292B

ELEVATOR LOBBY2.151

ELEV.2.152

ELEV.2.153

ELEV.2.153

ELEV2.152

CORRIDOR2.171

CORRIDOR2.209

COOLER2.292

ELEC.2.292A

DRY SUPPLYSTORAGE

2.292B

ELEVATOR LOBBY2.151

CLERICAL2.155

CLEAN2.154

SPECIMEN2.157

AMPLIFIED2.158

ELEV.2.153

OFFICE2.166

ELEV.2.153ELEV.2.153ELEV.2.153

TELE DATA2.172

FILE ROOM2.170

BLOCK ROOM2.195

OFFICE2.169B

OFFICE2.169A

LAB CONFERENCERM

2.123

ELEV.2.153

CORRIDOR2.299

TECH WORK2.165

CYTOLOGY2.167

PATHOLOGY2.169

DI WATER2.177

OFFICE2.202

OFFICE2.203

STAIRS2.192

S.T.2.206

S.T.2.207

CORRIDOR2.299

SPECIMENPROCESS

2.199

CORRIDOR2.269

ELEV.2.152

ELEV2.152

CORRIDOR2.269

ELEV.2.152

ELEV2.152

ELEC.2.205

CORRIDOR2.269

ELEV.2.152

ELEV2.152

ELEV.2.152

ELEV2.152

CORRIDOR10

HOODPROCESSING

2.198

CLIENT SERVICES2.197

FLOWCYTROMETRY

2.234

S.T.2.206

S.T.2.207

TELE DATA2.300

ELEV.2.152

ELEV2.152

CORRIDOR2.100

STAIRS2.244

REPAIR AND MATCHEXISTING CEILING

Date

Drawn ByChecked By

Project Number

Issue

PBK - ARCHITECTS11 Greenway Plaza, 22nd FloorHouston, Texas 77046[P] 713.965.0608[F] 713.961.4571

Revisions

In Assocition With:

MEP Consultant:

TELIOS12946 Dairy Ashford, Suite 130Sugar Land, Texas 77478[P] 281.265.1636[F] 281.265.1608

4/5/

2012

4:4

0:59

PM

C:\U

sers

\ pdh

era n

ge\D

ocum

e nts

\A1 .

MH

S W_P

Dhe

ran g

e.rv

t

A-601REFLECTED

CEILING PLAN

CheckerAuthor

02.14.1211154

100% Construction Documents

MemorialHermannSouthwest

Core LabConsolidation

1/8" = 1'-0"1 RCP COORDINATION

2

1

2

NO ISSUE DATE1 COH Comments 03.13.122 Revision 1 04.06.12

top related