DRAFT 2011-12-11. Barents 2020 Final Report. RN01 “Co-ordination of Deliverables” Moscow 14 December 2011. Presented by Vladimir Vernikovskij, Russian Coordinator of RN01. RN01 Participants. Co-ordinators. 2. RN01 - Mandate for Phase IV. - PowerPoint PPT Presentation

TRANSCRIPT

Barents 2020 Final Report

RN01“Co-ordination of

Deliverables” Moscow 14 December 2011

Presented by Vladimir Vernikovskij,Russian Coordinator of RN01

DRAFT 2011-12-11

2

RN01 Participants

Name Company

Vladimir Vernikovskiy GAZPROM / TK23

Denis Tikhomirov VNIIGAZ

Alexander Ermakov SDAG

Annie Audibert-Hayet TOTAL

Jan Gustaf Eriksson STANDARDS NORWAY

Alf Reidar Johansen OGP

Per Eirik Fosen STATOIL

Morten Bøhlerengen Moss Maritime

Anatoly Baryshnikov ENI E&P (NCOC)

Tore Sildnes DNV

Name Company

Vladimir Vernikovskiy GAZPROM / TK23

Denis Tikhomirov VNIIGAZ

Alexander Ermakov SDAG

Annie Audibert-Hayet TOTAL

Jan Gustaf Eriksson STANDARDS NORWAY

Alf Reidar Johansen OGP

Per Eirik Fosen STATOIL

Morten Bøhlerengen Moss Maritime

Anatoly Baryshnikov ENI E&P (NCOC)

Tore Sildnes DNV

Co-ordinators

RN01 - Mandate for Phase IV

1. Recommend how deliverables should be structured and published

2.Review deliverables for compliance with the recommendations, – prepare roadmaps for implementation of deliverables

3. Create awareness among the potential recipients as to what is coming– (e.g. standards organisations)

4. Provide proposal for an Arctic long term international standards program – (ref. ISO/TC67 MC Ad-hoc group Arctic Operations)

Task 1: Recommendation of deliverables

• Report developed and delivered to Steering Committee 7th Dec. 2010

• Recommendations presented at B2020 Conference 9th Dec. 2010

Task 2

Review of deliverables and

recommendation for implementation

RN02 - Ice LoadsRecipientDeliverable Application

RN02 - Commentary

RN03 – Risk ManagementDeliverable Recipient

RN03 - Commentary

RN04 – Evacuation & RescueRecipientDeliverable Application

RN04 - Commentary

RN05 – Human FactorsRecipientDeliverable Application

RN05 - Commentary

RN06 – Ice ManagementRecipientDeliverable Application

RN06 - Commentary

RN07 – Operational Emissions & Discharges

RecipientDeliverable Application

RN07 - Commentary

18

Task 3: Creating Awareness

InitiativesRN01 participation and presentations:•Plenary meeting of ISO TC67/SC7

– Singapore, Jan. 2011

• ISO/TC67/Management Committee meeting– San Francisco, June 2011 – where the formation of ISO/TC67 MC AHG “Arctic Operations” were discussed

•Norwegian Sector Board for Petroleum Standardisation•OGP Standards committee meetings•OGP Arctic Co-ordination TF meetings

Article in OGP Standards bulletin 2011

18

Task 4 – Proposal for Arctic Long Term Standardisation

1 2 3 4

RN01 Recommendations to ISO:11 New Work Item Proposals

20

Working group Deliverables 2012 2013 2014 2015 2016 2017 2018

RN01: Recommendation

for structuring, editing and

publishing of phase IV

deliverables

PNGI – Arctic operations – Ice loads in structural design

PNGI – Arctic Operations – Topside facilities, add. tech. requirements

PNGI – Arctic operations – Working environment

PNGI – Arctic operations – Escape, evacuation and rescue

PNGI – Arctic operations – Onshore logistics

PNGI – Arctic operations – Offshore logistics

PNGI – Arctic operations – Staff management

PNGI – Arctic operations – Maintenance of structures

PNGI – Arctic operations – Offshore structures corrosion protection

PNGI – Arctic operations – Plant security

PNGI – Arctic operations – Ice management

1

ISO AHG

• The ISO/TC67 MC Ad-hoc group on Arctic Operations used the Barents 2020 RN01 report as a basis for their recommendations

• Recommended to the ISO/TC67 plenary meeting in Moscow, 14-15th September 2011: – to set up a new subcommittee for Arctic Operations – to invite Russia to propose a chairman and secretary.

• Re. ISO/TC67 N 1148 Report ISO TC67 MC AHG Arctic operations, dated: 2011-09-07.

• .

2

3 – IOS plenary meeting

• The plenary meeting of ISO/TC67 took a resolution in its meeting 2011-09-15 to establish SC8 “Arctic Operations”.

• The SC8 work programme will be developed on the basis of the abovementioned work items.

• The formal establishment of SC8 has been approved by ISO Technical Management Board

• Preparations for the first meeting can start. Detailed new work item proposals are being prepared.

3

ISO TC67 SC8• SC 8 work programme to start with about 15 work

items, which should include the following subjects and/or standards:– Working environment in connection with cold-climate conditions (1

standard ready in late 2014);– Escape, evacuation and rescue (1 standard ready in early 2014));– Maintenance of onshore and offshore structures (2 standards ready in

late 2014);– Ice management (6 standards ready in 2015);– Onshore and offshore logistics (2 standards ready in late 2014);– Plant security (1 standard ready in early 2014).

• The detailed new work item proposals are being prepared.

4

Thank you for your attention !

25

Options for final reporting 1. Barents 2020 technical report 2. Proposal for Guideline(s) or Recommended Practice(s)

– GAZPROM (STO)– DNV (RP)– OGP

3. Proposal for identical Russian and Norwegian national supplementary standard to an ISO standard

– GOST R Standard, Recommendation or “set of rules”– NS or NORSOK standard

4. Proposal for national annex to adopted ISO or EN-ISO standard5. Proposal for ISO Technical Specification (TS)6. Proposal for ISO Technical Report (TR)7. Proposal for ISO Publicly Available Specification (PAS)8. Proposal for ISO International Workshop Agreement (IWA)9. Proposal for ISO Amendment to existing standard (Amd)