bcp - borough of wokingham...a230 a217 a216 a219 a222 a234 a235 a236 pumping station hedge3 co sf...

Post on 05-Oct-2020

11 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

C127

C123

C133

C132

C131

C130

C144

C129

C128

C146

C145

C143

C142

C140

C139

C138

C137

C136

C135

C134

C126

C125

C124

C122

C118

C121

C120

C119

C112

C117

C116

C115

C114

C111

C113

C107

C110

C109

C108

C106

C103

C104

C105

C99

C102

C101

C100

C98

C97

C141

B

C

P

A7

A20

A6

A5

A4

A3

A2

A1

A19

A18

A17

A16

A15

A14

A13

A12

A11

A10

A9

A8

A24

A23

A22

A21

A34

A35

A33

A32

A31

A30

A29

A28

A27

A26

A25

B

C

P

B

C

P

A147

A148

A149

A150

A151

A152

A153

A154

A155

A156

A159

A158

A157

A160

A161

A162

A163

A164-175

A176

A177

A178

A179

A180

A181

A188-199

A187

A186

A182

A183

A184

A206

A205

A204

A203

A202

A201

A200

A207

A208

A209

A210

A211

A212

A185

B

C

P

A213

A218

A221

A220

A223

A227

A225

A226

A224

A228

A229

A231

A232

A233

A215

A214

A230

A217

A216

A219

A222

A234

A235

A236

Pumping Station

Hedge3

Co sF

1no Qu ro (HS)

1no Qu ro (HS)

1no Qu ro (HS)

3no Cb FF

1no Al gl

3no Ti co

1no Pr av

1no Pr av

3no Cb FF

1no Pr av

2no Ti co

1no Pr av

1no Qu ro (HS)

Existing hedge retained and

replanted where required

2no Cb FF

3no Ac cS

3no Cb FF

3no Cb FF

3no Ti co

1no Pr av

1no Ac pl

1no Pr av

1no Ac pl

1no Pr av

1no Ac pA

1no Ac pA

Refer to on-plot landscape

proposals for specification

Refer to on-plot landscape

proposals for specification

4no Ac ca

Existing hedge retained and

replanted where required

Hedge1

Attenuation Basin 5

IL = 42.584

Volume = 1700m³

Depth = 1.4m

Attenuation Basin 7

IL = 43.200

Volume = 100m³

Depth = 1.3m

Ditch/Swale conveyance through

open space. Side slopes to vary

between 1 in 2 to 1 in 4, depth

approximately 1m to 1.5m. To

discharge into Attenuation Basin 7.

Average

1 in 4

slope

Average

1 in 4

slope

Average

1 in 4

slope

1no Qu ro (HS)

2no Ac pD

1no Pr av

Hedge1

Hedge3

1no Ac ca

2no Pr av

Hedge3

3no Co av

3no Ac cS

6no Cb FF

3no Ac cS

1no Pr av

Pe vi

Pe vi

Pe vi

Hy LW

Hy LW

Vi da

Vi da

Fo ma

Fo ma

Co MF

Hy LW

Hy LW

Pe vi

Pe vi

Pe vi

Pe vi

Vi da

Vi da

Fo ma

Fo ma

Co MF

Co MF

Lo pi

Co mF

Lo pi

Lo pi

Co sF

Co mF

Pe vi

Co sF

Co mF

LEGEND

Street trees

Trees in open space areas

Species rich grassland:

Informal grassland/Indicative location

for translocated acid grassland

Amenity grass

Self-binding gravel path

Blacktop

Application boundary

HARD LANDSCAPE

SOFT LANDSCAPE

Woodland planting

Shrub planting

Hedge planting

Existing hedge retained

Existing tree retained

Blacktop surface to pavements

Timber post and rail fence,

1.2m high

Species rich grassland:

SuDS basins

Species rich grassland:

Hedgerows

Marginal planting

Swale/SuDS basin:

Basic engineered profile to be regraded on site

to created subtle sculpturing to banks (localised

areas of slope gradient increase/decrease to

create shelves) and base (depressions) to

encourage changes in microhabitat

750mm high, 100mm∅ timber post to identify

change in land ownership, posts at changes of

direction and maximum 15m spacing

Wet pour safety surfacing, green

Compacted MOT base with grass seeded

surface (allotments haulage road)

Paladin fence (green) to allotments,

1.8m high, with matching lockable gates

750mm high, 75mm∅ timber post to allotment

access road

Retaining wall to engineers detail

Play equipment on grass mat safety surface

(installed to manufacturers recommendations)

Cycle stand (West Cross by Broxap)

Picnic table (standard and DDA versions)

Cheshunt range, 2m long

Chunky timber posts, 500mm high,

250x250mm

Play boulders - Caledonian or Celtic

boulders (600-1000mm average size)

Sculptured mounds

H

o

l

l

o

w

L

a

n

e

Reproduced from the Ordnance Survey Map with the permission of the Controller of HMSO. Crown Copyright Reserved. Licence No. 100019279.

N

PLANNING

0 10 20

5 1525m

The scaling of this drawing cannot be assured

Revision

Date Drn Ckd

-

ScaleDate

RevisionProject No Drawing No

Drawing Title

Project

Planning ● Master Planning & Urban Design

Architecture ● Landscape Planning & Design ● Project Services

Environmental & Sustainability Assessment ● Graphic Design

Offices at Reading London Bristol Cambridge Cardiff Ebbsfleet Edinburgh Leeds Manchester Solihull

J:\25000 - 25999\25400 - 25499\25450 - Shinfield West Reserved Matters\A4 - Dwgs & Registers\Environ\25450-RG-L10 Phase 1 RMA Landscape.dwg - L10(4)

Check byDrawn by

bartonwillmore.co.uk

Certificate FS 29637

25450

Shinfield West

Phase 1 RMA

RG/L10-4

Phase 1 Strategic Landscape

Proposals Sheet 4 of 5

27.04.161:500@A1

-

AS/CH CH/JH

LOCATION PLAN NOT TO SCALE

2

1 3

4

5

NOTES:

1) To be read in conjunction with Thrive Architects, Abley Letchford Partnership

and Forbes-Laird Arboricultural Consultancy drawings

2) Refer to ACD and Bloor Homes drawings for on-plot landscape proposals

3) Refer to drawing 25450/RG/L11 for plant schedule and planting notes

4) Refer to drawing 25450/RG/L12 for details of play area

top related