2929 Seconds/Layer 3737 Seconds/Layer3434Seconds/Layer

WithWith SAME SAME FABRIC & EQUALEQUAL LENGTH,

IF 200200 LAYERS of SPREADING IS NEEDED…29 Seconds/Layer X

200 Layers= 5800 Seconds

= 1.61.6 Hours

37 Seconds/Layer X 200 Layers

= 7400 Seconds

= 22 Hours

34 Seconds/Layer X 200 Layers

= 6800 Seconds

= 1.81.8 Hours

Pair 1Pair 1 Pair 2Pair 2 Pair 3Pair 3

TARGET will be ACHIEVED in DIFFERENT time

Variety in total steps

1 more STEP = about = about 33 seconds seconds slower spreading for EACH EACH LAYERLAYER

Variety in how-to-do the steps

Variation caused MORE THAN MORE THAN 44 seconds seconds slower spreading

for EACH LAYEREACH LAYER

STANDARD DETAIL with STANDARD DETAIL with RATE/YARDRATE/YARD

SPREADING PER LAYER IS 33 SECONDS FASTER

SPREADING PER LAYER IS 77 SECONDS FASTER