bim project execution planning thursday, january 13, 2011 ralph kreider graduate research assistant...

Post on 15-Jan-2016

226 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

BIM PROJECT EXECUTION PLANNING

Thursday, January 13, 2011

Ralph KreiderGraduate Research Assistant

CIC Research Program

Penn State University

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GBIM Project Execution Planning Procedure

BIM PRO

JECT EXECUTIO

N PLAN

NIN

G

“Begin with the end in mind.”

Identifying BIM Goals and Uses

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GBIM Goals

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GIdentifying BIM Goals and Uses

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GIdentifying BIM Goals and Uses

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GFrequency and Benefit of Uses

3D Coordination

Design Revie

ws

Design Auth

oring

Constructi

on Syste

m Desig

n

Existing Conditions M

odeling

3D Control a

nd Planning

Programming

Phase Planning (4

D Modelin

g)

Record

Modelin

g

Site U

tilizati

on Planning

Site Analysis

Structu

ral Analysis

Energy Analy

sis

Cost Esti

mation

Sustainabilit

y LEED

Evaluation

Building Syste

m Analysis

Space M

anagement /

Tracking

Mech

anical A

nalysis

Code Validation

Lighting Analy

sis

Other E

ng. Analysis

Digital F

abricati

on

Asset M

anagement

Building M

aintenance

Schedulin

g

Disaste

r Planning

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

50%

55%

60%

65%

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6FrequencyBenefit

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GBIM Use Selection Worksheet

Proceed?

Value

Responsible Party

Capabilities & Resources

BIM Use

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GDesign BIM Project Execution Process

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GLevel Two Process Maps

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GDevelop Information Exchanges

INFOEXCHANGE

INFO

EXCHANGE

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GInformation Exchange Worksheet

= Output Inadequacy (Revise Information) OR= Input Inadequacy (Revise Responsible Party)

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GSupporting Infrastructure

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GPlan Template

BIM PRO

JECT EXECUTIO

N PLAN

NIN

G

SurveysCase Studies

Project (7)Organizational (3)Academic (2)

Focus GroupsIndustry and User Feedback

Validating the Planning Procedure

BIM PRO

JECT EXECUTIO

N PLAN

NIN

G

OrganizationalUS Army Corps of EngineersPenn State UniversityLos Angeles Community College District (Draft)

University Health Systems - San AntonioMillennium Science BuildingPoff Courthouse2nd Data Center ProjectMoore Building RenovationHenderson Bridge

Projects

Academic

Integrated BIM Design StudioIntegrated BIM ThesisBIM Project Execution Planning

Case Study Implementation

BIM PRO

JECT EXECUTIO

N PLAN

NIN

G

Need BIM Champion(s)Owner Involvement is CriticalNeed team Buy-in and TransparencyThe Planning Procedure should allow for Adaptations

by the Project TeamThe Project Execution Plan must be considered a

Living DocumentPlanning takes Resources and it is Critical that

Resources are Available

Lessons Learned

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GSponsors: The Charles Pankow Foundation The Construction Industry Institute (CII) Penn State Office of Physical Plant The Partnership for Achieving Construction Excellence (PACE) Industry Partners:

LACCD USACE Balfour Beatty

Whiting Turner Clark Construction Group Jacobs

Barton Malow GSA MA DCAM

Dana ‘Deke’ Smith Mark Butler Derek Cunz Mark Falzarano

Ed Gannon Greg Gidez Francois Grobler Steve Hagan

Steve Hutsell Mark Konchar Soad Kousheshi Rob Leicht

Kurt Maldovan Victor Sanvido Alexander Zolotov

Craig Dubler Shane Goodman Colleen Kasprzak

Ralph Kreider Eric Nulton

Chitwan Saluja Nevena Zikic

Chimay Anumba Sam Hunter John Messner

Advisory Board Members

PSU Research Team Students:

Faculty:

ACKNOWLEDGEMENTS

BIM PROJECT EXECUTION PLANNING

Download the Guide at:

www.engr.psu.edu/bim? Ralph Kreider

Graduate Research Assistant

CIC Research Program

Penn State University

BIM PRO

JECT EXECUTIO

N PLAN

NIN

G

Create a PxP TemplateAdd sections on decision makingMap BIM Process

Level 1 and Level 2Map Design Process

Level 1 – Project TeamLevel 2 – Individual Process

Information ExchangesWhat information is required

What to do for this class

BIM PRO

JECT EXECUTIO

N PLAN

NIN

G

http://www.youtube.com/watch?v=24pvMspaSCE

http://www.youtube.com/user/BentleySystems

Projectwise

top related