bio-energy 7th shrestha 1st revised
Post on 10-Apr-2018
219 Views
Preview:
TRANSCRIPT
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
1/45
JFITASIAN INSTITUTE OF TECHNOLOGY
1
e-learn
ing
co
urs
e
e-learning course onBio-energy for achieving MDGs
Prof. Ram M. ShresthaSchool of Environment, Resources and Development
Asian Institute of TechnologyThailand
E-mail: ram@ait.ac.th
21 June 2007
Lecture 7:Financial Analysis of Renewable Energy Projects
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
2/45
JFITASIAN INSTITUTE OF TECHNOLOGY
2
e-learn
ing
co
urs
e
Contents Characteristics of RE Projects
Financial analysis vs. Economic Analysis
Components of project costs and benefits
Time Value of Money
Criteria for Financial Viability of Project
Financial Analysis under Uncertainty
- Sensitivity Analysis
- Break-even analysis
- Scenario Analysis
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
3/45
JFITASIAN INSTITUTE OF TECHNOLOGY
3
e-learn
ing
co
urs
e
Characteristics of RE Projects
Most RE projects normally involve:
- High initial costs (capital intensive)- Low operating cost
- Environmental/climate benefits, cleaner than fossil
fuel technologies, e.g. biomass energy- Local level employment generation (especially, from biomass
projects)
- Resource availability site specific and subject to fluctuations(especially in the case of solar, wind and hydro)
- Sustainable resource use
RE projects also help to reduce national energy import dependency.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
4/45
JFITASIAN INSTITUTE OF TECHNOLOGY
4
e-learn
ing
co
urs
e
Current Status of Renewable EnergyTechnologiesTechnology Capacity factor (%) Turnkey investment
costs (U.S.$/Kw)Current energy costof new systems
Potential futureenergy cost
Biomass Energy
Electricity
Heat
Ethanol
25 - 80
25 - 80
900 - 3,000
250 - 750
5 15 /kWh
1 5 /kWh
8 25 $/GJ
4 10 /kWh
1 5 /kWh
6 10 $/GJ
Wind Electricity 20 - 30 1,100 1,700 5 13 /kWh 3 10 /kWh
Solar PhotovoltaicElectricity
8 - 20 5,000 10,000 25 125 /kWh 5 or 6 25 /kWh
Solar ThermalElectricity
20 - 35 3,000 4,000 12 18 /kWh 4 10 /kWh
Low-temperature
Solar Heat
8 - 20 500 1,700 3 20 /kWh 2 or 3 10 /kWh
Hydroelectricity
Large
Small
35 - 60
20 - 70
1,000 3,500
1,200 3,000
2 8 /kWh
4 10 /kWh
2 8 /kWh
3 10 /kWh
Geothermal Energy
Electricity
Heat
45 - 90
20 - 70
800 3,000
200 2,000
2 10 /kWh
0.5 5 /kWh
1 or 2 8 /kWh
0.5 5 /kWh
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
5/45
JFITASIAN INSTITUTE OF TECHNOLOGY
5
e-learn
ing
co
urs
e
What is Financial Analysis?
Financial evaluation mainly focuses into
- Money aspects of the project, and
- Rewards and financial profitability to the investors.
The main objective of the financial analysis is to look intothe financial benefits, costs and profitability of the projectfrom the investors perspective.
Financial analysis (FA) includes direct transfer paymentssuch as taxes, duties, subsidies in the evaluation.
FA does not account for the externalities such asenvironmental impacts and their costs.
FA normally uses market prices of inputs and outputs
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
6/45
JFITASIAN INSTITUTE OF TECHNOLOGY
6
e-learn
ing
co
urs
e
Financial Vs. Economical AnalysisOn the other hand, economic evaluation
- estimates project benefits and returns from theperspective of national economy and assesses theeffects that the project will have on the overall
economy of the country.
- takes into account the social and environmental
costs and benefits of the project.- excludes transfer payments and
- uses border prices for traded goodsand shadow
prices for non-traded goods and services.
As the main focus of our discussion is on financial analysis, we willtry to put more concentration in this area rather than the economicalanalysis in the later part of our presentation.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
7/45
JFITASIAN INSTITUTE OF TECHNOLOGY
7
e-learn
ing
co
urs
e
Financial Analysis in the Project Cycle
The Project Cycle is the framework to design, prepare,
implement and supervise projects. The project cycle includes six stages such as,
Identification
Preparation
AppraisalNegotiation/Approval
Implementation, and
Evaluation.
The Appraisal phase includes evaluation of financial,economic, technical, institutional, environmental andsocial aspects of the project.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
8/45
JFITASIAN INSTITUTE OF TECHNOLOGY
8
e-learn
ing
co
urs
e
Components of Project Costs Project Costs:
Investment costs Operating costs
Investment Costs: Include initial costs and replacement costs
Initial Costs, referred to as the first cost, which is usually made up of anumber of cost elements that do not recur after an activity is initiated. For
example, construction and commissioning, including land, civil works,transportation, equipment & installations and other related initial expenditures
Initial cost is the major component of an RE project. Such cost is normallyhigher in RE projects than in non-RE projects. As such, high initial cost
presents the major barrier to the adoption of RETs.
Replacement Costs, refers to the cost of equipment and installationsprocured during the operating phase of the project, to maintain its originalproductive capacity.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
9/45
JFITASIAN INSTITUTE OF TECHNOLOGY
9
e-learn
ing
co
urs
e
Project Costs (Contd.)
Operating Costs: Costs experienced continually over theuseful life of the project activity. They are of two broadcategories:
- Fixed Costs (FC)- variable costs (VC)
Fixed Cost (FC): Group of costs whose value will remain relatively
constant throughout the range of operational activity or output levelof the project. FC includes the following cost items:
- maintenance- insurance- lease rentals
- interest payment on invested capital- certain administrative expense, and- research.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
10/45
JFITASIAN INSTITUTE OF TECHNOLOGY
10
e-learn
ing
co
urs
e
Project costs (contd.)
Variable Costs (VC): Group of costs that vary withthe level of operational activity or output. In general,VC includes costs of:
- labor,
- materials,- fuel cost*
- tax
*Biomass cost in the case of biomass energy
projects; none in solar, wind and hydro.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
11/45
JFITASIAN INSTITUTE OF TECHNOLOGY
11
e-learn
ing
co
urs
e
Project Benefits
RE Project Financial Benefits include:
- Revenue earned from the output of the project
- Tax credits (if applicable)
- Subsidy (if applicable)
- Carbon credits
(if the project is eligible for such benefits, e.g., under the cleandevelopment mechanism (CDM); in the case of a biomass project, suchcredits can be available only if biomass is produced on a sustainable basis)
A RE investment tax credit is an immediate reduction in income tax equalto a percentage of the installed cost of a new RE investment. Tax creditsfor renewable energy technologies (RETs) can enhance after-tax cash flowand promote RE investment.
Often, governments may also provide subsidy on the cost of RETsequipments to promote RE.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
12/45
JFITASIAN INSTITUTE OF TECHNOLOGY
12
e-learn
ing
co
urs
e
Flow Chart of Financial Analysis Under CertaintyDefine the parameters of the project
e.g. Service life, Discount Rate, Size of the Project,
Dem and, etc.
For a given size of the RE project,
determine the cash inflows and cashoutflows for each Year
Calculate the total NPW oralternative financial indicator of
the project
Use of decision rule forproject investment
Investment
Decision
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
13/45
JFITASIAN INSTITUTE OF TECHNOLOGY
13
e-learn
ing
co
urs
e
Time Value of Money
Interest rate, or the rate of capital growth, is the rate of gain
received from an investment. For example, a 11% interestrate indicates that for every dollar of money used, anadditional $0.11 must be returned as payment for the use ofthat money.
The relationship between interest and time leads to theconcept of the time value of money.
Money has an earning power. A dollar in hand now is worthmore than a dollar received n years from now. This isbecause having the dollar now provides the opportunity forinvesting that dollar for n years more than the dollar to bereceived n years hence, i.e. this investment will earn a return.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
14/45
JFITASIAN INSTITUTE OF TECHNOLOGY
14
e-learn
ing
co
urs
e
Time Value of Money (Contd.)
This can be illustrated as:
The purchasing power of a dollar changes through time. This is because
the future values are eroded by inflation.
An entrepreneur expects to gain a premium on his investment, to allow forthe following three factors: inflation, risk taking and the expectation of a realreturn.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
15/45
JFITASIAN INSTITUTE OF TECHNOLOGY
15
e-learn
ing
co
urs
e
Present Worth Calculation Present valuing (discounting) is central to the financial and
economical evaluation process. Since most of the project costs, aswell as benefits, occur in the future, it is essential that these shouldbe discounted to their present value (worth) to enable properevaluation.
Hence, the present worth (P) of a future amount (say, Fn) in year n
will be calculated as:
P = Fnx [1/(1+i)n]
That is,
Present Value (P) = Fnx Discount Factor
where, discount factor = 1/(1+i)n
For example, if Fn= $1,000, i = 12% per year and n = 5 Years, then,
P = $1,000 x [1/(1 + 0.12)5] = $567.40
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
16/45
JFITASIAN INSTITUTE OF TECHNOLOGY
16
e-learn
ing
co
urs
e
Future Worth Calculation
Future worth analysis calculates the future worth of an
investment undertaken. Future value is simply the sumto which a dollar amount invested today will grow givensome appreciation rate.
The future amount (Fn) in year n of a present principalamount, P, is given by:
Fn= P(1 + i)n ..(1)
For example, if P= $567.40, i = 12% per year and n = 5 Years,
then, Fn= $567.40 x (1 + 0.12)5= $1,000
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
17/45
JFITASIAN INSTITUTE OF TECHNOLOGY
17
e-learn
ing
co
urs
e
Equivalence relationship between F and P
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
18/45
JFITASIAN INSTITUTE OF TECHNOLOGY
18
e-learn
ing
co
urs
e
Capital Recovery Factor (CRF)
A Capital Recovery Factor (CRF) converts a present
value into a stream of equal annual payments over aspecified time, at a specified discount rate (interest).
The value of an equal payment (A) to be made in each ofn periods here is given by:
A = P [i(1+i)n
]/[(1+i)n-1
]That is, A = P x CRF
Where, CRF= capital recovery factor = [i(1+i)n]/[(1+i)n-1]
The capital recovery factor can be interpreted as theamount of equal (or uniform) payments to be received forn years such that the total present value of all theseequal payments is equivalent to a payment of one dollarat present, if interest rate is i.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
19/45
JFITASIAN INSTITUTE OF TECHNOLOGY
19
e-le
arn
ing
co
urs
e
Annuity factor
Given uniform cash flow series (A), Find P.
Present value of the series in this case is givenby:
P = A x Annuity factor
where, Annuity factor = 1/CRF
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
20/45
JFITASIAN INSTITUTE OF TECHNOLOGY
20
e-le
arn
ing
co
urs
e
Example
Given, P = $250,000, i = 8% per year, N = 6 years, find A.
$ 250,000
0
1 2 3 4 5 6
A A A A A A
Years
Figure: A loan cash flow diagram
Here, CRF = 0.2163
A = $250,000x CRF = $54,075
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
21/45
JFITASIAN INSTITUTE OF TECHNOLOGY
21
e-le
arn
ing
co
urs
e
Criteria for Financial Viability of a Project
There are several alternative criteria for financialevaluation. They are:
Net Present Worth (NPW) (or Net Presentvalue)
Annual Equivalent Worth (AE) Financial Internal Rate of Return (FIRR)
Benefit-Cost Ratio (B/C ratio) Payback Period (a simple but not sound
basis)
Net Present Worth (NPW): It is the difference
between the present value of cash inflows (revenues) andthe present value of cash outflows (costs) at the minimumattractive rate of return of the project owner.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
22/45
JFITASIAN INSTITUTE OF TECHNOLOGY
22
e-le
arn
ing
co
urs
e
Basic procedure for net present worth calculation
1. Determine the interest rate that the firm wishes to earn on its
investments. This interest rate is often referred to as either arequired rate of return or a minimum attractive rate of return(MARR).
2. Estimate the service life of the project.3. Estimate the cash inflow for each period over the projects
service life.4. Estimate the cash outflow over each service period.5. Determine the net cash flows:
net cash flow = cash inflow cash outflow
6. Find the present worth of each years net cash flow at theMARR.
7. Add up all the present worth figures during the service life of theproject. The sum so obtained is the projects NPW.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
23/45
JFITASIAN INSTITUTE OF TECHNOLOGY
23
e-le
arn
ing
co
urs
e
Net Present Worth Criterion (Contd.)
A positive NPW means that the equivalent worth of the inflows isgreater than the equivalent worth of outflows, so the project makes aprofit.
Therefore, the decision rule will be as follows:
If NPW(i) > 0, accept the project for investment.
If NPW(i) = 0, remain indifferent.
If NPW(i) < 0, reject the investment.
where, i = MARR.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
24/45
JFITASIAN INSTITUTE OF TECHNOLOGY
24
e-le
arn
ing
co
urs
e
Annual Equivalent Worth
The annual equivalent worth (AE) criterion provides an alternative
basis for measuring the worth of an investment by determining equalpayments on an annual basis.
To compute AE, first of all we have to find the net present worth(NPW) of the original series and then multiply this amount by the
capital recovery factor. The decision rule is as follows:
If AE(i) > 0, accept the project for investment.
If AE(i) = 0, remain indifferent to the investment.
If AE(i) < 0, reject the project for investment. Note that, accepting a project that has a positive AE(i) is equivalent to
accepting a project that has a positive PW(i).
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
25/45
JFITASIAN INSTITUTE OF TECHNOLOGY
25
e-le
arn
ing
co
urs
e
Financial Internal Rate of Return (FIRR) The FIRR is an indicator to measure the financial return on
investment of an income generation project and is used to make theinvestment decision.
The FIRR is obtained by equating the present value of investmentcosts (as cash out-flows) and the present value of net incomes (ascash in-flows) and thus finds out the break-even interest rate, i*.
In general, the decision rule is as follows: If FIRR > MARR, then, accept the project. If FIRR = MARR, then, remain indifferent. If FIRR < MARR, then, reject the project.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
26/45
JFITASIAN INSTITUTE OF TECHNOLOGY
26
e-le
arn
ing
co
urs
e
Benefit-Cost Ratio (B/C ratio)
B/C ratio is the ratio of the total present value ofbenefits during the service life of the project to thetotal present value of the costs at the MARR.
A project is accepted for investment if B/C ratio isgreater than or equal to unity and rejected otherwise.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
27/45
JFITASIAN INSTITUTE OF TECHNOLOGY
27
e-le
arn
ing
co
urs
e
B/C Ratio (Contd.)
A
Initial cost $ 2Annual benefit and
costs:$ 1Power Sales
-
Let us consider an example of a hydropowerproject as follows:
Interest rate=12%, Life=50 yearsAnnual Benefit = 1000000 + 250000
+ 350000 + 100000
= $ 1700000
Present value of benefit
= 1700000 *(annuity factor)
= 1700000*18.2559
= $ 31035030Then,Present value of operating and maintenance cost = 200000 * 18.2559
= $ 3651180Total cost (C) = 25000000+ 3651180B/C ratio = 31035030 / (3651180 + 25000000) = 1.08Since the B/C ratio is greater then unity, the project is accepted!
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
28/45
JFITASIAN INSTITUTE OF TECHNOLOGY
28
e-le
arn
ing
co
urs
e
Payback Period The payback period is the time that a project is expected to take in
order to earn net revenue equal to the capital cost of the project.
It is utilized for small investments, like improvements and energyefficiency measures, since it is easy to understand by business
managers.
Drawbacks
- It tells the analyst nothing about the project earning rate after thepayback period and does not consider the total profitability or size ofthe project.
- If a company makes investment decisions solely on the basis of thepayback period, it considers only those projects with a paybackperiod shorter than the maximum acceptable payback period.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
29/45
JFITASIAN INSTITUTE OF TECHNOLOGY
29
e-le
arn
ing
co
urs
e
Payback Period (Contd.)
The payback period method ignores inflation and discriminatesagainst large capital-intensive infrastructure projects with longgestation times. Therefore, it is a poor criterion in itself and it mustbe used in conjunction with other criteria.
The Pay- Back Period can be calculated as
Pay-back period = Total Investment Cost Subsidy amountAnnual Revenue Annual Expenditure
If the subsidy amount is not given then we can exclude the subsidy
amount in the above example.
Fl Ch f Fi i l A l i d U i
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
30/45
JFITASIAN INSTITUTE OF TECHNOLOGY
30
e-le
arn
ing
co
urs
e
Flow Chart of Financial Analysis under UncertaintyDefine the parameters of the project
e.g. Service life , Discount Rate , Size ofthe Project , Demand , etc .
For a given size of the RE project ,
determine the cash inflows and cash
outflows for each Year
Calculate the total NPW or
alternative financialindicator of the project
Use of decision rule
for project investment
Investment
Decision
Sensitivity Analysis
Break -even Analysis
Scenario Analysis
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
31/45
JFITASIAN INSTITUTE OF TECHNOLOGY
31
e-le
arn
ing
co
urs
e
Financial Analysis under Uncertainty In the foregoing discussion, we assumed that all the parameters of the
project for financial evaluation are known for certainty. However, this isnot usually the case. From a practical point of view the project
parameters may face uncertainty and the actual value could vary.
Projects that involve new technologies (renewable and clean-coaltechnologies), or projects with lengthy lead times (nuclear and hydro-power) involve a lot of investment and have more than the average levelof risk.
For example, the demand may not turn out to be as estimated, the tariffis lower than expected, project execution may take more time andinvolve more cost than planned.
In RE projects, RE resource availability itself is subject to some
uncertainty and hence the uncertainty in RE output.
Cost overruns, which are caused by project delays, or inaccuracies inestimation do not only significantly change project costs but alsosubstantially reduce net benefits.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
32/45
JFITASIAN INSTITUTE OF TECHNOLOGY
32
e-le
arn
ing
co
urs
e
Financial Analysis under Uncertainty(contd.)
Generally, there are several procedures toanalyze the project under uncertainty,such as:
Sensitivity Analysis
Break-Even Analysis
Scenario Analysis
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
33/45
JFITASIAN INSTITUTE OF TECHNOLOGY
33
e-le
arn
ing
co
urs
e
Sensitivity Analysis A sensitivity analysis reveals how much the NPW will
change in response to a given change in an input variable.
This kind of analysis determines the effect on the NPWwith variations in the input variables such as revenues,operating cost, and salvage value etc.
Sensitivity analysis sometimes also called as what-ifanalysis.
Sensitivity analysis begins with a base case situation,which is developed by using the most likely values foreach input. Then the value of the specific variable ofinterest is changed above or below its most likely value,while holding all other variables constant.
S (C )
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
34/45
JFITASIAN INSTITUTE OF TECHNOLOGY
34
e-le
arn
ing
co
urs
e
Sensitivity Analysis (Contd.)Next, a new NPW for each of the values are obtained.
A convenient and useful way to present the results of asensitivity analysis is to plot sensitivity graphs.
The slopes of the lines show how sensitive the NPW is to
changes in each of the inputs.
The steeper the slope, the more sensitive the NPW is toa change in a particular variable. Sensitivity graphsidentify the crucial variables that affect the final outcomemost.
Let us construct a sensitivity graph for five of the transmissionprojects key input variables such as unit price, product demand,variable cost, fixed cost and salvage value.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
35/45
JFITASIAN INSTITUTE OF TECHNOLOGY
35
e-le
arn
ing
co
urse
Sensitivity Analysis (Contd.)
The base case NPW is $40,169. We plot the base case NPW on the
ordinate of the graph with 0% deviation and then reduce the value ofthe input variables by 5% of its base case value and recompute theNPW with all other variables held at their base case value. Werepeat the process by either decreasing or increasing therelative deviation from the base case.
FromFigure 1, we can see that the projects NPW is
- Very sensitive to the changes in product demand and
unit price,
- Fairly sensitive to changes in variable costs, and
- Relatively insensitive to changes in the fixed cost and the salvage
value.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
36/45
JFITASIAN INSTITUTE OF TECHNOLOGY
36
e-le
arn
ing
co
urse
Sensitivity Analysis (Contd.)
Sensitivity Analysi
0
10000
20000
30000
4000050000
60000
70000
80000
90000
-20% -15% -10% -5% 0% 5% 10% 15% 20%
Deviation
NPW(1
5%) Unit Price
Demand
Variable Cost
Fixed Cost
Salvage Value
Figure 1: Sensitivity Graph
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
37/45
JFITASIAN INSTITUTE OF TECHNOLOGY
37
e-le
arn
ing
co
urse
Break-Even Analysis
When we perform a sensitivity analysis of a project, we are asking
how serious the effect of lower revenues or higher costs will be onthe projects profitability. Sometimes the question may be insteadhow much sales or revenue can decrease below forecasts beforethe project begins to lose money. This type of analysis is known asbreak-even analysis.
Break-even analysis is a technique for studying the effect ofvariations in output on a firms NPW.
Figure 2 shows the plot of the PWs of cash inflows and outflowsunder various assumptions about annual sales. The two lines
crosses when sales are X1 units, the point at which the project hasa zero NPW. It is seen that as long as the sales are greater orequal to X1 units the project has a positive NPW.
Break even Analysis
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
38/45
JFITASIAN INSTITUTE OF TECHNOLOGY
38
e-le
arn
ing
co
urse
Break-even Analysis
0
0
Y1
Y2
Y
NPW(MARR %)
Annual Sales Units (X)
X1 units
Loss
ProfitBreak - even point
Outflow
Inflow
Break Even Analysis basedon net cash flow
Figure 2:
X1
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
39/45
JFITASIAN INSTITUTE OF TECHNOLOGY
39
e-le
arn
ing
co
urse
Scenario Analysis
A more comprehensive approach to deal with uncertainty than
sensitivity and break-even analysis is Scenario Analysis. Both Sensitivity and Break-even analysis are useful but they have
certain limitations. Often it is quite difficult to specify precisely therelationship between a particular variable and the NPW. Therelationship is further complicated by interdependencies among the
variables. It may also complicate the analysis too much to permitmovement in more than one variable at a time.
Scenario Analysis is a technique that considers the sensitivity ofNPW both to changes in key variables and to the range of likely
values of those variables. For example, in its simplest form it involves selecting scenarios such
as, a best-case scenario, a worst-case scenario and the most-likely-case scenario.
S (C )
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
40/45
JFITASIAN INSTITUTE OF TECHNOLOGY
40
e-le
arn
ing
co
urse
Scenario Analysis (Contd.)
The best-case scenario will incorporate future parameters that are morefavorable to the project success than they appear at the time of evaluation.
The worst-case scenario is the analysis with less favorable values such aslow unit sales, low unit price, high variable cost per unit, high fixed cost etc.
The most-likely-case scenario (base case) is the analysis with the mostlikely inputs and outputs from the point of view of the project evaluator.
The NPW under the worst and the best conditions are then calculated andcompared with the expected, or the base case, NPW.
Generally, we find that the worst case produces a negative NPW, the bestcase produces a large positive NPW and the most likely case produces apositive NPW.
But still by only observing all these results, it is not possible and easy tointerpret the scenario analysis or make a decision based on it.
Clearly, we need estimates of the probabilities of occurrence of the worstcase, the best case and the most likely or base case and all the otherpossibilities.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
41/45
JFITASIAN INSTITUTE OF TECHNOLOGY
41
e-le
arn
ing
co
urse
Concept of MARR
The minimum attractive rate of return (MARR) is the
interest rate at which a firm can always earn orborrow money under a normal operatingenvironment. It is generally dictated by managementand is the rate at which NPW analysis should be
conducted.
Usually the selection of the MARR is a policydecision made by top management and it is possible
for the MARR to change over the life of the project.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
42/45
JFITASIAN INSTITUTE OF TECHNOLOGY
42
e-le
arn
ing
co
urse
Basis for Selecting the MARR:
The Cost of Capital of a firm is the required rate of
return that makes an investment project worthwhile.
The cost of capital of a firm investing in the projectcan be expressed as the weighted average cost of
capital if the firm mobilizes its fund through differentsources of financing, e.g., debt and equity.
The cost of capitalis normally considered as the rate
of return that a firm would receive if it invested itsmoney somewhere else with a similar risk.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
43/45
JFITASIAN INSTITUTE OF TECHNOLOGY
43
e-le
arn
ing
co
urse
Basis for Selecting the MARR (contd.)
Any additional risk associated with the project also has tobe considered.
If the project belongs to the normal risk category, thecost of capital may already reflect the risk premium.
However, if we are dealing with a project with higher risk,the additional risk premium may be added onto the costof capital.
In total, the discount rate (or, MARR) to use for financialevaluation would be equivalent to the firms cost ofcapital for a project of normal risk, but could be muchhigher if we are dealing with a risky project.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
44/45
JFITASIAN INSTITUTE OF TECHNOLOGY
44
e-le
arn
ing
co
urse
References
Park, Chan S., Contemporary Engineering Economics, 4th edition,
Prentice-Hall, N.J., 2007.
Hisham Khatib, Economic Evaluation of Projects in the ElectricitySupply Industry, IEE Power and Energy Series 44, London.
United Nations Development Programme, United NationsDepartment of Economic and Social Affairs, World Energy Council,2000, World Energy Assessment, Energy and the Challenge ofSustainability.
Intermediate Technology Development Group, 1997, FinancialGuidelines for Micro Hydro Projects, Nepal.
-
8/8/2019 Bio-Energy 7th Shrestha 1st Revised
45/45
45
e-le
arn
ing
co
urse
Thank you!