BIOMASS HEATING SYSTEMNORTH SLAVE CORRECTIONAL FACILITY IN YELLOWKNIFE
NWT, CANADA
Total area is roughly 9,500 m2 and house approximately 180 inmates.
- FIRST INSTALLATION IN NWT -Sukhi Cheema, P.Eng.
March 2010
WOOD PELLET BOILER INSTALLATION(North Slave Correctional Facility – Yellowknife, NWT)
Sukhi Cheema, P.Eng.March 2010
Heating Oil Displaced =587,000 litres (Jan-Dec 2008)
Remote Monitoring & Control
Automatic Feed from Pellet Silo
BIOMASS HEATING SYSTEM(North Slave Correctional Facility – Yellowknife, NWT)
Sukhi Cheema, P.Eng.March 2010
• Installed two wood pellet boilers, each with 740 kW output. • The system has been in operation since December 1, 2006.• The system provides the heating requirements of the
facility for 90% of the year in winter and 100% in summer months.
• Savings from Jan 1,2008 to December 31, 2008 were 587,000 litres of fuel and $80,200.
• Greenhouse Gas reductions were 1601 tonnes from Jan –Dec 2008.
WOOD PELLET BOILER INSTALLATION(North Slave Correctional Facility – Yellowknife, NWT)
Shipping Containers
Pellet Silo
Boilers
Sukhi Cheema, P.Eng.March 2010
System Layout
Fully Computerized Operation.
System at NSCF was the first one in Canada
WOOD PELLET BOILER INSTALLATIONSNorthwest Territories, Canada
Systems in Operation or under Construction Sukhi Cheema, P.Eng.March 2010
NWT/NORDIC BIOENERGY
Bioenergy Fact-Finding Mission Scandinavia
(Denmark, Sweden and Finland)
April 25 – May 07, 2009
PWS - GNWT
Mission Goal
Visit countries at the forefront of bioenergy development.
Gain knowledge of new technologies. Make contacts (Bioenergy Associations, Research
Institutes, Consultants, Plant Operators, Manufacturers, Suppliers, etc.).
Bring back concepts and bioenergy models(District Heating, Cogeneration, etc.) for application in the NWT.
PWS - GNWT
Biomass Energy Fact-Finding Mission to Scandinavia
Canadian Team in FinlandCanadian Team in Sweden