P A C I F I C O R P
P O W E R D E L I V E R Y
Page 1
May 10, 2004
An Electric Utility Perspective on Applications of Electricity Storage for
Distributed Generation
Workshop on Advances in Electricity Storage in Support of Distributed Renewable Energy Based
Systems Monday, May 10, 2004 Hyatt Regency Waikiki
Bradley R. Williams, PEDirector, Power Delivery Business TechnologyPacifiCorp, Portland, ORbradley.williams@pacificorp.com
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 2
May 10, 2004
PacifiCorp Quick Facts
• 1.5 million electric customers in six Western states
• Doing business as Pacific Power and Utah Power
• Low-cost, reliable energy producer
• 8300 megawatts of generation capacity from coal, hydro, gas-fired combustion turbines, geothermal, co-generation and renewable wind power
• 6,400 employees in the United States, headquartered in Portland, Oregon
• President and CEO: Judi Johansen
• Part of the ScottishPower Group, which additionally provides energy and other utility services to 5.5 million customers in the United Kingdom.
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 3
May 10, 2004
Utility Distribution Applications best Suited to Distributed Electricity
Storage• High loading - existing infrastructure at full capacity• High Costs to increase capacity and/or build
transmission• Slow to moderate load growth to leverage best asset
deferral benefit • Feeder voltage/reactive power (var) support needed• Difficult access to stable fuel source• Difficult permitting process for DG combustion
engines emissions
DG
SubstationCB
Feeder capacitylimit
Load Concentration
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 4
May 10, 2004
Rattlesnake#2225kV Feeder
•Environmentally Pristine Southeast Utah– East of Moab– East of Arches National Park– Along Colorado River valley
•209-mile long 25kV feeder, with 3-line regulators & 7-reclosers
•Possible denial of new connects because feeder cannot supply any significant amount of new load without causing low voltage to existing customers.
•Because feeder is so long, reliability and power quality is low leading to Public Service Commission Complaints. PacifiCorp agreed to fix.
•Traditional alternatives to add capacity and improve service are very costly and environmentally difficult.
•Demonstrated distribution benefits of VRB energy storage as part of PacifiCorp's DG Strategy – 2 MWh, 250kW VRB-ESS (expandable to 1MW) in Castle Valley, Utah
CASTLE VALLEY
MOAB
Castle Valley
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 5
May 10, 2004
Castle Valley, Utah - VRB Site
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 6
May 10, 2004
Utility Electricity Storage Applications
0
Pow
er
rati
ng
0 10s 1 h 2 h 8 h
10 kW
100 kW
1 MW
10 MW
100 MW
Storage inventory
1s 1 min 4 h30 min
Power quality
Un-interruptiblepower supplies
Frequencycontrol
Voltagesupport
VAR support
Peak shaving
Transmission stability
Spinning and standby reserve
Black startLoad levelling/following
Tariff trading
Load factor increase Capacity deferral Integration of renewables
Power quality and reliability
applications
Energy management applications
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 7
May 10, 2004
Electricity Storage Technology Alternatives
100-MW and above
Pumped storage
Compressed AirEnergy Storage(CAES)
10-MW1-MW
Large-scale batteriesLead-acidNASVRBZBB
FlywheelsBatteries
• Li Ion
• NiMHCapacitors
UPSMarket
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 8
May 10, 2004
PacifiCorp’s View of Electricity Storage
•Excellent progress in electricity storage technology & power electronics
– Redox Flow Cell stores charged electrolytes separate from cell for greater kWh storage capability. Best distributed resource applications.
•Efficiency: 60-85%
•Best Applications:– Deferred Power Delivery assets: Peak Shaving, load following,
dynamic frequency control, volt-var support– Large renewable wind and solar projects. Leveling applications.– Premium Power: Industrial/Commercial High 9’s Availability
(99.999% available)
•Opportunity for early adopters– Looked at a number of storage technologies: Regenesys, ZBB,
VRB, others– Selected VRB Power Systems due to efficiency, availability, and
scalability (smaller size initially to prove the technology).
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 9
May 10, 2004
What is a Vanadium Redox Battery?
The VRB-ESS is a “green” technology. It has no emissions, and does not contain heavy metals. Most other
energy storage systems rely on toxic substances such as lead, zinc or
cadmium. The electrolyte used in the VRB-ESS has an indefinite life and is
completely reusable.
Vanadium Redox Batteries are a type of energy storage system (“VRB-ESS”) - flow batteries capable of storing electrical energy and deploying it back to the grid when required.
The VRB-ESS is charged like any other battery, but the energy is stored by chemical changes to the electrolyte. The electrolyte is a solution of ionic forms of vanadium in a dilute sulfuric acid that are electrochemically oxidized or reduced to store the energy. The acidity level of the electrolyte is no greater than a conventional car battery.
The electrolyte is pumped from separate plastic storage tanks across proton exchange membranes in the cell stacks, creating a current. The reaction is reversible, allowing the battery to be charged, discharged, and recharged with high efficiency.
Castle Valley VRB System
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 10
May 10, 2004
VRB Energy Storage System Components
• Electrolyte storage tanks
• Cell stacks (with proton exchange membranes & carbon felt electrodes)
• Pumps to move the electrolyte fluid through the cell stack
• ac/dc Inverter and power conditioning
• VRB ESS Control system
The battery provides DC power. Therefore, an inverter is used to convert it to alternating current when it is returned to the electric delivery system.
Also involved: control, monitoring, and temperature regulation systems
DC Power
AC Power
V2+ and V3+ V4+ and V5+
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 11
May 10, 2004
VRB Chemistry
Vanadium sulfates in H2SO4
V2+ V3+ + e- [1]
V5+ + e- V4+ [2]
• Based on reduction and oxidation of different ionic forms of Vanadium. • Chemical energy can be stored indefinitely (very low discharge rate).• Very fast conversion response: less than 1 millisecond to change from charging to
discharging.
V2+ /V3+V4+ /V5+
- dc Power +
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 12
May 10, 2004
Potential VRB-ESS Utility Applications• Load Leveling (Peak Shaving)
– The VRB Energy Storage System can reduce the peak of a customer’s energy load as seen by the distribution system. This enhances utilization of assets on the electrical grid and manages customer energy demand.
• Ancillary Services to Utilities– Reserves - Spinning, Standby, Replacement - In the event of the loss of output from a supply source or an
unexpected change in system demand, the VRB-ESS can immediately provide the required power to make up the shortfall.
• Constraint Relief & Capital Deferment– The VRB Energy Storage System is a means of buffering both the flow and supply of power and thereby
increase the associated delivered capacity in MW on a network path that is otherwise constrained.
• Power Quality & Reliability– demand side management– Uninterruptible Power Supply (UPS) – emergency power backup for loss of AC, voltage sags, dips, etc.– Voltage support & flicker compensation– Power factor management
• Quality of Supply (QOS) – supply side management– Reactive power provision– Capacity extension – improves voltage regulation– Power factor management
• Renewable Energy Capacity Support– The VRB-ESS can serve as a buffer between a variable supply sources and the firm competitive
requirements of a power contract – which could add value to non-firm resources such as wind and photo-voltaic (PV). It could also provide stabilization of wind turbine output and is a source of reactive energy.
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 13
May 10, 2004
High Cost
Low Cost
Example Peak Shaving
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 14
May 10, 2004
Renewable Energy Applications• The VRB can be used to store
solar and wind energy
• Using a VRB can smooth the power supplied, making it more constant
• The VRB can provide reactive energy through the AC/DC converter
• The VRB is an environmentally friendly alternative to diesel generators and larger lead acid batteries
V R B AC/DC
Converter
renewable energy source
Wind output is variable so capacity is discounted by > 75%
VRB can firm supply and increase capacity and efficiency
King Island – Hydro Tasmania800kWh VRB Integration with Remote Wind & Diesel Systems
• Reduced emissions – 47%
• Saved fuel costs – Load factor is 28% or 10,000litres/day average. Reduced by 1.5million/litres/year
• Reduced Operating and Maintenance costs
• Improved power system stability and enhance power quality
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 15
May 10, 2004
Castle Valley VRB Enclosure Footprint (m2) per capacity
2.0MWh – 250kW
• Castle Valley enclosure 7300 sq. ft. designed for expansion, room to work, and visitors (being 1st VRB in North America).
• Minimum VRB foot print design for 1MW-4hrs = 3200 sq ft.
Hours 4 6 8 10kW
50 11 16 21 26100 21 32 42 53200 46 46 46 57500 60 90 120 149
1,000 120 179 239 2722,500 272 408 414 518
10,000 622 933 995 1291
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 16
May 10, 2004
Modular Design
• Sumitomo (Japan) – 50kW VRB Cell Stacks have 5X short duration overload rating for PQ support and major disturbance mitigation.
• Each stack size = 4.2-ft X 3.2-ft X 3.6-ft (1.3m X 1.0m X 1.1m)
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 17
May 10, 2004
VRB Cell Stacks
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 18
May 10, 2004
Electrolyte Storage Tanks
• 58-ft long, 9.5-ft diameter. 70,000 liters capacity• Fiberglass (double wall) construction with leak detection sensors.
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 19
May 10, 2004
Inverter
• TSI/Eskom QuPS 250kW, 300kVAR inverter • 1200A, Vdc=200-300 volts with constant power output• Internal ac bus = 600volts (IEEE 514 harmonic filter capability)• Overload capability = 200% for 10-seconds, 150% for 5-minutes
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 20
May 10, 2004
System Layout Design
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 21
May 10, 2004
Cell Operating Range State of Charge
Cell potential vs. state of chargeT = 298 K
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
State of Charge
Op
en C
ircu
it V
olta
ge /
V
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 22
May 10, 2004
Charge Discharge curves for VRB-ESS
400
500
600
700
800
900
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5Discharge/Charge time (hr)
Ba
tte
ry
po
ten
tia
l (V
dc)
-400
-300
-200
-100
0
100
200
300
400
Bat
tery
cu
rren
t (A
)
Battery potential
Battery currentElelctrolyte Temp: 38-41 C
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 23
May 10, 2004
Operating Parameters
• Temperature range - 5ºC to 40ºC
• Electrolyte concentration – 1.6 to 2.4 Mole/liter
• Sulphuric acid concentration 2 to 4 Mole/l
• Electrolyte Hazardous classification: EEC 8, 6.1
• Speed of response - <1ms
• SG – 1.36 to 1.47 kg/liter
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 24
May 10, 2004
Castle Valley VRB Project Status
•Initial operations in startup and testing in November 2003
•Continuous full power daily cycling operations since March 2004
•On-going monitoring and performance testing
•Minor Capacity enhancements Underway
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 25
May 10, 2004
PacifiCorp VRB Future Plans
•Advanced application development:– Advanced power quality applications– Advanced islanded operations– Adaptive charge/discharge energy arbitrage control algorithms– Advanced dynamic voltage control algorithms– Dynamic stability control algorithms– Wind farm application studies
•DOE Wyoming Wind Farm / Energy Storage Study.
•Increases to capacity through:– Additional cell stacks– Higher capacity inverter– Increased molarity of the electrolyte
•Can relocate to new site once transmission line and sub is built
•Investigating future telecom site and substation battery replacements
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 26
May 10, 2004
Storage Business CaseSoutheastern USA 2004
Generator (1,000kW 6 hours/day 320days/y) –1,920,000kWh/year
• Fuel ($9/MMbtu) and O&M costs ($0.0168/kWh) per year = $214,000
• CAPEX cost per year (20 years @ 7%) = $99,523
• Equivalent cost of energy = $0.1634/kWh
VRB-ESS 1,000 kW 1,000kVAR for 6 hours storage
• Fuel cost (off peak purchases $0.013/kWh @80% efficiency) and O&M per year = $45,000
• CAPEX cost per year (20 years @ 7%) = $267,000
• Equivalent cost of energy = $0.1625/kWh
• Ancillary services are additional value streams that could be derived by a storage system, and a hedge against gas price volatility
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 27
May 10, 2004
Cost Benefit Analysis Arbitrage – East Coast
• Out of City generation = 300MW
• Unable to deliver during peak daytime loads due to line constraints
• Option – Install several distributed Energy Storage systems locally to the loads.
• Cost of Storage installation $320/kWh – 10MW, 10MVAR, 10 hours
Size of connection - kW 10,000energy charge plus O&M - $/kWh 0.024
Demand charge - $/kW.month 0.55Repayment period -years 15Energy price in $/kWh 0.12Capacity price in $/kW.month 2.00Period available in year (hours) 3650Discount rate (WACC) 7.00%Assumed depreciation period - years 12
NPV = $5.6million
ROI AT = 23%
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 28
May 10, 2004
Cost Benefit Analysis Industrial facility - NY
Monthly Max Demand Industrial - NY
0
500
1000
1500
2000
2500
3000
3500
4000
4500
1 2 3 4 5 6 7 8 9 10 11 12Month
kW
Industrial customer Daily load profile in NY with Storage
(1,000)
(500)
-
500
1,000
1,500
2,000
2,500
3,000
hour
kW
Average Demand VRB Charge (+ve) discharge (-ve) Resultant Demand curve
•Maximum Demand – 3,862kW
•Minimum Demand – 680kW
•Load factor 60%
•Storage – 800kW x 6 hours 75% round trip efficiency
•Storage shifts 6,230kWh usage per day from peak pricing to off peak pricing and MD reduced 800kW.
•Annual saving based on current tariffs - $292,000
•Simple payback < 6 years
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 29
May 10, 2004
Industrial Consumer Solution
Grid, Regenesys, Mill energy interaction
0.0
10.0
20.0
30.0
40.0
50.0
60.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time period
Po
we
r in
pe
rio
d
From Reg to Mill
From Grid to Reg
From Grid to Mill
0
10
20
30
40
50
60
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0
10
20
30
40
50
60
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Regenesys Eff iciency Loss
Average
Profile Without Storage
Profile With Storage
Courtesy Regenesys – Mr. Mark Kuntz
P A C I F I C O R P
P O W E R D E L I V E R Y
Page 30
May 10, 2004
1. Focus on best applications – this can make or break the project.
2. Cost – CAPEX and O&M (life cycle) – Maximize efficiency, minimize maintenance requirement
3. Reliability and Availability – Must be there when we need it!
4. Must be large enough to have an impact (MWh).
5. Speed of response to an event - Can it be controlled and dispatched – risk to system
6. Grid stability impacts – voltage and protection dynamic interactions
7. Permitting – ease and time to obtain permits
8. Footprint – How Big? Can it be sited at customer’s premise or substation
9. Must breakthrough utility Technology bias – just build more lines and substations – new technology is too risky and subject to disallowance.
Conclusion - Lessons Learned from Utility Energy Storage