Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
1
Correlator
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
2
Outline
• Requirements
• Architecture
• Technology
• Software
• Budget
• Schedule
• Installation
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
3
Requirements
• 16 GHz bandwidth (8 x 2 GHz bands).
• 16,384 spectral channels/baseline (wideband), 0.25 million (narrower w/recirculation).
• 16 independently tunable digital sub-bands/baseband + N.B. radar filter.
• Flexible: tradeoff B.W. for freq. channels.
• 2 banks of 1000 phase bins/baseline.
• High performance, flexible dumping.
• Very long baseline capable (>10k km baselines).
• 1/16th sample digital delay tracking.
• Baseband and sub-band multi-beaming…on the same data.
• Simultaneous 1 GHz B.W. phased output on multiple sub-arrays.
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
4
RequirementsDescription “Dream” Correlator Spec. Planned deliverable
No. of antennas 36 32, expandableBandwidth 4 x 2 x 2 GHz (16 GHz) 4 x 2 x 2 GHz (16 GHz)Freq. Resolution few Hz ... 10’s MHz 1 Hz ... 2 MHzNo. of independently tunable IF pairs at least 4, prefer 8 64, with digital sub-bandsNo. of frequency channels 1000 (full polarization per IF pair),
8000 total1024 W.B. (more w. recirc)
16384 W.B. total (more w. recirc)Frequency channel flexibility split flexibly among IFs,
select subset for writing
split flexibly among IFs and sub-bands,
select subset for writingFlexibility Frequency resolution: factors of 2
Flexible tradeoffs (#baselines, B.W.,#channels, pol’n, time res’n)
Interf. sub-arrays: 4 independentPhased sub-arrays: 4 independent
OkCan’t tradeoff baselines
at full bandwidthInterf. sub-array: unlimited.
Phased sub-arrays: 5Integration times 0.1 sec (less with tradeoffs) 0.011 sec (less with tradeoffs)Total data rates few tens of Mvis/sec several Gvis/secAutocorrelations all stokes parameters W.B. all stokes, SNR loss
S.B. all stokes, no SNR lossRFI as many channels as possible
106 dynamic range
automatic flagging
gating
Ok: 16,384...262,1444-bit sampling standard, up to 8-
bit sampling avail (d.r. depends onnoise+RFI)
post-corr. interference excision +facilitates post-corr. cancellation.
from antenna, external signalPulsar phase binning up to 1000 2 x 1000, min 15 sec eachPhase Cal at least auto-spectra minimum 1 pCal extractor/IFDelay tracking 1/16th sample, 250 km baseline digital 1/32nd sample, 104 km+ bl
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
5
Architecture
• FIR filter banks followed by complex XF correlator:– “Stitch” sub-bands together after correlation to yield wideband cross-corr.
– Use small LO offsets in antenna to keep fringe rotators “wet”: fringe stopping, anti-aliasing, artifact decorrelation, digital sub-sample delay tracking, VLBI.
– Each poly-phase FIR independently programmable for flexibility…scientific req’t.
• Three main modules:
– Station Board (2 x 2 GHz).
– Baseline Board (64 baselines ea).
– Phasing Board (48 stations, 2 sub-bands, 5 sub-arrays).
• Plus some 4 small interconnect modules…expandable, flexible.
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
6
Architecture
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MDR-80
MDR-80
MDR-80
MDR-80
MDR-80
MDR-80
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
MD
R-8
0
4-S tationC om plex Mixer
+ 1st S tage
Adder
48-S
tati
on
Dat
a E
ntr
y C
on
nec
tors
-48 VDC to1.8V, 2.5VPOWERSUPPLY
Po
we
rC
on
ne
cto
r
MC BInterfaceModule
Fibre W DMDem odulators
Sub-band Distributor Backplane
BaselineEntryBackplane
StationDataFanoutBoard
PhasingBoardEntryBackplane
Network Switches
Host/Control
Com puters;Archiving
Antennas:R eceivers,Sam plers,F ibre W D M
FOTS
PC/CPCI
TIMECODEGeneratorBox (TGB)
R eference C lock
R eference Tim e Tick
TIMECODE(s) + CLOCK(s)
Finalsynchronization
and VLBI recorderinterface
VLBIRecorder(s)
Phased outputfeedback
synchronization
To phased-VLAStation Board
input(s)
B aseline B oard
PC/CPCI
PC/CPCI
-48 V D C to1.8V , 2.5VPO W ERSU PPLY
MC BInterfaceModuleE
the
rne
t
Fibre-OpticReceiverM odule
DELAY
DELAY
FIRFilterBank
FIRFilterBank
Sw
itch
Sw
itch
Tim ing
S tation Board
Retim ing/Drivers
8 'X
' Rec
ircu
latio
n C
ontr
olle
rs
8 'Y ' Recirculation Controllers
8 x 8Correlator Chip
and LTA ControllerMatrix
MC BInterfaceModuleE
the
rne
t
-48 V D C to1.8V , 2.5VPO W ERSU PPLY
SERIALI/F(s)
4-S tationC om plex Mixer
+ 1st S tage
Adder
4-S tationC om plex Mixer
+ 1st S tage
Adder
4-S tationC om plex Mixer
+ 1st S tage
Adder
4-S tationC om plex Mixer
+ 1st S tage
Adder
4-S tationC om plex Mixer
+ 1st S tage
Adder
4-S tationC om plex Mixer
+ 1st S tage
Adder
4-S tationC om plex Mixer
+ 1st S tage
Adder
4-S tationC om plex Mixer
+ 1st S tage
Adder
4-S tationC om plex Mixer
+ 1st S tage
Adder
(5)Sub-array2nd-Stage
Adders
FIRFilterBank
Sw
itch
P has ing B oard
M aster S lave 1 S lave 2 S lave 3
W idebandAutocorrelator
200
pin
type
E20
0 pi
n ty
pe E
200
pin
type
E20
0 pi
n ty
pe E
200
pin
type
E20
0 pi
n ty
pe E
4-S tationC om plex Mixer
+ 1st S tage
Adder
4-S tationC om plex Mixer
+ 1st S tage
Adder
PC/CPCI
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
7
Architecture
-48 V DC to1.8V , 2.5VPOW ERSUPPLY
MC BInterfaceModuleE
the
rne
t
Fibre-OpticReceiverModule
DELAY
DELAY
FIRFilterBank
FIRFilterBank
Sw
itch
Sw
itch
Tim ing
S tation Board
W idebandAutocorrelator
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
8
Architecture
B aseline B oard
8 'X
' Rec
ircu
latio
n C
on
tro
llers
8 'Y ' Recirculation Controllers
8 x 8Correlator Chip
and LTA ControllerMatrix
MC BInterfaceModuleE
the
rne
t
-48 V DC to1.8V , 2.5VPOW ERSUPPLY
SERIALI/F(s)
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
9
Architecture
4-StationC omplex Mixer
+ 1st S tage
Adder
48-S
tati
on
Dat
a E
ntr
y C
on
nec
tors
-48 VDC to1.8V, 2.5VPOWERSUPPLY
Po
we
rC
on
nec
tor
MC BInterfaceModule
4-StationC omplex Mixer
+ 1st S tage
Adder
4-StationC omplex Mixer
+ 1st S tage
Adder
4-StationC omplex Mixer
+ 1st S tage
Adder
4-StationC omplex Mixer
+ 1st S tage
Adder
4-StationC omplex Mixer
+ 1st S tage
Adder
4-StationC omplex Mixer
+ 1st S tage
Adder
4-StationC omplex Mixer
+ 1st S tage
Adder
4-StationC omplex Mixer
+ 1st S tage
Adder
4-StationC omplex Mixer
+ 1st S tage
Adder
(5)Sub-array2nd-Stage
Adders
FIRFilterBank
Sw
itch
P has ing B oard
4-StationC omplex Mixer
+ 1st S tage
Adder
4-StationC omplex Mixer
+ 1st S tage
Adder
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
10
Architecture
• Future upgrade possibilities:– “maxed-out” on bandwidth.– replace Baseline Board with “Moore” lags…
(more channels and/or more bandwidth in bandwidth/number of antennas tradeoff.)
– keep existing software and hardware infrastructure…painless upgrade.
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
11
Technology
• 256 MHz system clock rate:– FPGA and gate array tech. supports this.
– Development tools (Mentor/Cadence) well-equipped for this speed/complexity.
– Can de-scope to 128 MHz on PCB (with 256 MHz interconnects) if absolutely necessary.
• FIR filter:– Prototype in FPGA (power, $$). Convert to 0.18 m gate array (AMIS).
Should be able to get 1024 taps. ($200k NRE, $50 ea, 10k qty). Claim that they use 1/5th the number of gates for same function as Xilinx.
• 2048-tap power estimate: 20 nW/MHz/gate * 300k gates * 256 MHz * 1.0 (switching fraction) = 1.5W
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
12
Technology
• Correlator chip:– Original plan: develop full-custom 0.18 m standard cell from
scratch ($900k NRE + $700k production).
– Current plan: prototype with scaled-down (fewer lags) FPGA, convert to gate array or standard cell afterwards. Pushes back technology freeze to latest possible date to take advantage of improvements…
• Power: 20 nW/MHz/gate * 0.5 million (hi-speed switching) gates * 256 MHz * 0.75 transition fraction = 1.9W (2.5W with 1.0 transition fraction)
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
13
Software
• Use hierarchical approach (mirrors AMCS):– 1 SCC and 1 BCC (perhaps one platform).– Use NRAO MIBs on boards.
• Backend software/configs…
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
14
Software
PhB B0
S B 0 S B 1 S B 2 SB 15 S BCa l S Bra d
P hB B1
P hB B2
P hB B3
P hB B4
P hB B5
P hB B6
PhB B7
slo t_ facto rs lo t_num ber
B B str(a ...b )
S B _LOfshiftS RC _coord
B B _wid th
fi lte r_parm s
b inning_parm sint_ tim e
po la riza tiongatingpulsar_parm sphasing_parm s
de lay_parm s
RF I_contro l
da ta_parm s
P C al_parm s
sta ts_parm s
copy_contro l
autocorr_parm s
S RC _coord
array_center
array_center
antenna_IDantenna_coords
B B str[16 ](a ...b )
wb_autocorr_parm swb_sta ts_parm s
B B LO[16]B B sideband[16 ]
S ub-band C ontro lP aram eters
P hysical B aseB andC ontro l P aram eters
A "station input": shares T IM E C O D E , D U M P TR IG etc .
Station Board Station Board Station Board Station Board
Noise-ca lfi lte r
Radarfi lte r
B B b its[16 ]B B cod ing [16 ]
requant_parm s
antenna_coords
recirc_parm s
S ub-bandfilte rs (16)
num _spec_chansnum _po l
Ind ic a tes w ha t w e w an tthe c o rre la to r to do w ithth is s ub-band , bu t no t howit is done .
physica l_S B out
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
15
Software
SBC0
SBC1
SBC2
SBC15
C C C 0 C C C 1 C C C 2 C C C 3
CC
Q#1
C C C 12 C C C 13 C C C 14 C C C 15
CC
Q#4
X -inputY-input
Sub-bandCorrelators
B aseline C orre lator U n it (C orre la tor C h ip )
sta rt_ lagend_ lag
X /Y_dum p_se lect
X -inputY-input
sta rt_ lagend_ lag
X /Y_dum p_se lect
X-input, Y -input: P hB B 0...P hB B 7 , o r "ad jacent"
start_lag, end_lag : full range o f lags this C C C acquires.
X/Y_dum p_select : X o r Y
CCC0128-com p lex lag "C orre la to rC hip C e ll" .
S BC0 S ub-band co rre la to r.
N O TE S :
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
16
Software
LocalResourceManager
LocalS tation
R esourceTable
ConfigurationManager
ErrorMessageManager
ModelGenerator
DataManager
Tim eManager
Low-Lev elStatus and
DebugManager
FilterC oeffic ientG eneratorProgram
ISRModelServ erTask
Mo d e l q ue ue
ConfigurationTask
DataHandler
Task
D ata q ue ue
FPGA BootServ erTask
DataReadout
Task
ErrorMessage
Task
Tim eClientTask
S/WMonitor
Task
Low-Lev el
Status andDebugTask
StationBoard
MonitorTask
Delay& PhaseControl
Task
DUMPTRIGControl
Task
C o nf ig uratio nq ue ue
C onfigurationTable
H /W
H /W
H /W
H /W
H /W
H /W
ConfigurationServ er
H /W
OSKernel
Station Board MIB (128)Station Control Computer (1)VCI-SCC
TGB MIB
1 0 m sINT
S E M(d atare ad y)
d ata
d ata
d atad ata
E rro rm e s s .
E rro rm e s s .
E rro rm e s s . tim e
c o nf igd ata
c o nf igd ata
c o nf igd atac o nf ig
d ata
c o nf igd ata
c o nf igd ata
c o nf igd ata
tim e
E rro rm e s s . m o d e l
re q .
c o nf igd ata
c o nf igd ata
line arm o d e ls
line arm o d e ls
c o nf igd ata
m o d e l p o lyno m ials
ac k.
E rro rm e s s .
E rro rm e s s .
trig g e rre q .
S E M(trig g e r)
m o d e lre q .
m o d e l+d e laym e as .
re q .m e as .
d e lay m e as .
E rro rm e s s .
vo lt + te m p +s tatus re advo lt+ te m p
m e s s ag e s
E rro rm e s s .
E rro rm e s s .
E rro rm e s s .
E rro rm e s s .
tas ks tatus
tas ks tatus
write
re ad
b o o td ata
ac k.
tim e
c o nf ig re q + d ata
ac k.tim e
tim e s e ttingre q ./ac k.
s tatus /func tio nre q .
ac k, d ata
E rro rm e s s .
F P G A b o o t re q + d ata
ac k.
m o d e l g e nre q ue s t
ac k.
array/o b s e rvatio ntim e
F IT S d ata f rag m e nts
re s o urc ed ata
re s o urc ed ata
E rro rm e s s .
s tatus /func tio n re q ue s t
ac k, d ata
Correlator Station Control Data Flow Diagram
wid e b andauto c o rre latio ns
re s ync
re s o urc e d ata
ac k.
c o nf igre q ue s t
ac k.
H /W
re q uantize rthre s ho ld s
BaselineProcessing
PCs
s tatec nts
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
17
Budget
EVLA Correlator, 32 StationsTotal Cost Breakdown ($12.17 million)
NRE+Miscl Dev.19% ($1.9M)
Contingencies13% ($1.64M)
Labour19% ($2.4M)
System Comps14% ($1.8M)
H/W Modules35% ($4.5M)
Could shave ~$1.3 million off this budget with cheaper cables and AMIS gate array for FIR (& corr chip).
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
18
Schedule
Date MilestoneNov. 2/2001 Conceptual Design Review (CoDR). Design frozen.Q1, 2002 New personnel in place. Design tools in place. Training and design work
begins.Q1, 2004 Critical User Manuals in place. Device driver code can be written.Q2, 2004 Preliminary Design Review (PDR). Designs ready for prototype fabrication.Q1, 2005 Prototype test at the VLA starts.Q2, 2005 Prototype test at the VLA complete.Q3, 2005 Critical design review (CDR). Prototype testing complete. Ready for
procurement of production components and full production.Q2, 2006 Production model test and burn-in, system integration and test in Penticton, and
rack and cable installation begins at the VLA.Q4, 2006 Begin full installation at the VLA. Earliest possible start of installed correlator
testing.Q2, 2007 Earliest possible “beta” science data. (Middle of full installation schedule.)Q1, 2008 Correlator commissioning. Correlator fully on-line for observing. Continuing
debug support available.Q1, 2009 End of project. End of NRC debug support. Full handover to NRAO complete.
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
19
Installation
Station Racks (12)
48 VDC P lant
48-Station Rack Layout: 1 Floor; 2 sub-racks per 7 ft rack (Nov. 20/2001)
3 Racks =2 sub-bandcorrelators
44 ft
44.5 ft
Air
Con
ditio
ner
Baseline Racks (24)
Air
Con
ditio
ner
Air
Con
ditio
ner
Air
Con
ditio
ner
Max cable length=36 ft (11 m)
Brent Carlson EVLA System PDR (Correlator V2)December 4-5, 2001
20
Summary
• Wideband, high-performance, flexible.
• Expandable, re-configurable.
• Painless upgrade path.
• (010k+ km baselines).
• $10 - $12 million (32 stations; another ~$6 million for 48 stations).
• Start installation ~2006.
• First “beta” science ~2007.
• Completion 2008-2009.