Worldwide Approaches to Living With Water
-
8/13/2019 BRW I | All Presentations
3/100
-
8/13/2019 BRW I | All Presentations
4/100
-
8/13/2019 BRW I | All Presentations
5/100
JOSERAYNAL
PANEL
ONE
-
8/13/2019 BRW I | All Presentations
6/100
-
8/13/2019 BRW I | All Presentations
7/100
-
8/13/2019 BRW I | All Presentations
8/100
-
8/13/2019 BRW I | All Presentations
9/100
-
8/13/2019 BRW I | All Presentations
10/100
-
8/13/2019 BRW I | All Presentations
11/100
CRAIGCOLTEN
PANEL
ONE
-
8/13/2019 BRW I | All Presentations
12/100
Resilience as a
Process:
Govenor McKeithenpromised he would
establish proceduresthat will . . . make arepeat of this disasterimpossible.
-
8/13/2019 BRW I | All Presentations
13/100
Place Based:
Flooding from
Hurricane Betsy 1965
US Army Corps of Engineers
-
8/13/2019 BRW I | All Presentations
14/100
Place Based: Hurricane Protection LeveesTo reduce future flooding.
New Orleans Times Picayune
1965
-
8/13/2019 BRW I | All Presentations
15/100
Social Memory:Local evacuationto schools.
New Orleans Public Library
-
8/13/2019 BRW I | All Presentations
16/100RESPOND: Improve government coordination
d l
-
8/13/2019 BRW I | All Presentations
17/100
RebuildLower 9th
RedevelopCarrollton Ave.
RenewCanal Street
Recovery:Recovery part ofplanning process.
-
8/13/2019 BRW I | All Presentations
18/100
CHRISPULASKI
PANEL
ONE
-
8/13/2019 BRW I | All Presentations
19/100
Troublein Sportsmans Paradise?www.vanishingparadise.org
-
8/13/2019 BRW I | All Presentations
20/100
MARKDAVIS
PANEL
ONE
-
8/13/2019 BRW I | All Presentations
21/100
-
8/13/2019 BRW I | All Presentations
22/100
RICHARDCAMPANELLA
PANEL
TWO
-
8/13/2019 BRW I | All Presentations
23/100
BASJONKMAN
PANEL
TWO
-
8/13/2019 BRW I | All Presentations
24/100
Building resilience and flood risk
management
Dr. Bas Jonkman
-
8/13/2019 BRW I | All Presentations
25/100
National Water plan on safety
New flood defencepolicy -> new safety
standards, based on:
Individual risk Societal risk Cost Benefit
Analysis
Consider different
layers of protection:
-
8/13/2019 BRW I | All Presentations
26/100
-
8/13/2019 BRW I | All Presentations
27/100
Build 50,000 newhomes in the deep
polder
Increase inconsequences
Consequencereduction considered:
Mounds Super levees
So far: not feasible due
Almere case
-
8/13/2019 BRW I | All Presentations
28/100
Existinglevee
800 newhomes
-
8/13/2019 BRW I | All Presentations
29/100
Scheveningen / The Hague
case
Different options
considered:
- buildingresilience
- Moving the seadefence forward
-
8/13/2019 BRW I | All Presentations
30/100
Scheveningen / The Hague
case
-
8/13/2019 BRW I | All Presentations
31/100
Closing remarks
Need to find a balance between differentlayers of protection
High level of protection: difficult to justifybuilding resilience behind the levees
Trend: investigate combinations of floodprotection and spatial development (on the
levees): delta dikes
-
8/13/2019 BRW I | All Presentations
32/100
Flood threats in the NetherlandsRainfall floods
Failure of local flood defences
Failure of primary flood defences
Flooding of unembanked areas
-
8/13/2019 BRW I | All Presentations
33/100
DONBLANCHER
PANEL
THREE
-
8/13/2019 BRW I | All Presentations
34/100
Don Blancher
Sustainable Ecosystem Restoration,
LLC&
GroundworkNOLA
-
8/13/2019 BRW I | All Presentations
35/100
-
8/13/2019 BRW I | All Presentations
36/100
-
8/13/2019 BRW I | All Presentations
37/100
Krasney & Tidball, 2009
-
8/13/2019 BRW I | All Presentations
38/100
Krasney & Tidball, 2009
-
8/13/2019 BRW I | All Presentations
39/100
-
8/13/2019 BRW I | All Presentations
40/100
AMANDAMOORE
PANELTHREE
-
8/13/2019 BRW I | All Presentations
41/100
!"#$ &'()*)+,-
",)+(./0(1
!"#$ & +
-
8/13/2019 BRW I | All Presentations
42/100
!"#$ &'()*)+,-
",)+(./0(1
-
8/13/2019 BRW I | All Presentations
43/100
ELIZABETHENGLISH
PANELFOUR
-
8/13/2019 BRW I | All Presentations
44/100
For over 30 years, amphibious houses
at Raccourci Old River have been
rising and falling reliably with the levelof flooding of the Mississippi River.
Dry in September . . . The same house . . . Floating in February
-
8/13/2019 BRW I | All Presentations
45/100
Dry in September . . . The same house . . . Floating in February
Average cost of buoyancy
system is around $5,000.
-
8/13/2019 BRW I | All Presentations
46/100
Buoyant foundations are not new!
Dry in September . . . The same house . . . Floating in February
-
8/13/2019 BRW I | All Presentations
47/100
So why fight floodwater
when you can float on it?
-
8/13/2019 BRW I | All Presentations
48/100
Section drawing of a
shotgun house with abuoyant foundationinstalled, showingbuoyancy blocksunder the house andvertical guidance
poles that telescopeout of the ground
Figure Created by Stuart Broussard
How it works
-
8/13/2019 BRW I | All Presentations
49/100
Figure Created by Stuart Broussard
House ontraditionalmasonry piers
Houseelevatedto 8 feet
House witha BuoyantFoundation
Comparison of 3 Conditions
-
8/13/2019 BRW I | All Presentations
50/100
-
8/13/2019 BRW I | All Presentations
51/100
-
8/13/2019 BRW I | All Presentations
52/100
-
8/13/2019 BRW I | All Presentations
53/100
-
8/13/2019 BRW I | All Presentations
54/100
WHICH WOULD YOU CHOOSE?
Completed buoyant foundation
-
8/13/2019 BRW I | All Presentations
55/100
Completed buoyant foundation
Aerial view
-
8/13/2019 BRW I | All Presentations
56/100
Aerial view
Moving the sandbags to tilt the house
-
8/13/2019 BRW I | All Presentations
57/100
Moving the sandbags to tilt the house
Let's be sure this never happens again
-
8/13/2019 BRW I | All Presentations
58/100
Flooded shotgun house, New Orleans, 8 Sept 2005 photo by E. C.English
Let s be sure this never happens again
-
8/13/2019 BRW I | All Presentations
59/100
-
8/13/2019 BRW I | All Presentations
60/100
www.buoyantfoundation.org
-
8/13/2019 BRW I | All Presentations
61/100
PRITHULAPROSUN
PANELFOUR
-
8/13/2019 BRW I | All Presentations
62/100
-
8/13/2019 BRW I | All Presentations
63/100
-
8/13/2019 BRW I | All Presentations
64/100
-
8/13/2019 BRW I | All Presentations
65/100
YARROWETHEREDGE
PANELFIVE
-
8/13/2019 BRW I | All Presentations
66/100
Yarrow Etheredge
Best National Practices
Implemented Locally
-
8/13/2019 BRW I | All Presentations
67/100
-
8/13/2019 BRW I | All Presentations
68/100
-
8/13/2019 BRW I | All Presentations
69/100
-
8/13/2019 BRW I | All Presentations
70/100
-
8/13/2019 BRW I | All Presentations
71/100
-
8/13/2019 BRW I | All Presentations
72/100
-
8/13/2019 BRW I | All Presentations
73/100
-
8/13/2019 BRW I | All Presentations
74/100
-
8/13/2019 BRW I | All Presentations
75/100
-
8/13/2019 BRW I | All Presentations
76/100
-
8/13/2019 BRW I | All Presentations
77/100
-
8/13/2019 BRW I | All Presentations
78/100
-
8/13/2019 BRW I | All Presentations
79/100
-
8/13/2019 BRW I | All Presentations
80/100
-
8/13/2019 BRW I | All Presentations
81/100
-
8/13/2019 BRW I | All Presentations
82/100
-
8/13/2019 BRW I | All Presentations
83/100
-
8/13/2019 BRW I | All Presentations
84/100
-
8/13/2019 BRW I | All Presentations
85/100
-
8/13/2019 BRW I | All Presentations
86/100
-
8/13/2019 BRW I | All Presentations
87/100
-
8/13/2019 BRW I | All Presentations
88/100
-
8/13/2019 BRW I | All Presentations
89/100
-
8/13/2019 BRW I | All Presentations
90/100
-
8/13/2019 BRW I | All Presentations
91/100
-
8/13/2019 BRW I | All Presentations
92/100
BILLCOULBOURNE
PANELSIX
-
8/13/2019 BRW I | All Presentations
93/100
ATC Past
-
8/13/2019 BRW I | All Presentations
94/100
ATC Past Several are landmark documents that
have changed engineering practice
ATC-3: Basis for seismic design
provisions of UBC
ATC-20: Post-EQ safetyevaluation
FEMA 154 (ATC-21): Rapidvisual screening
ATC Past
-
8/13/2019 BRW I | All Presentations
95/100
ATC Past
ATC-14 Evaluating the SeismicResistance of Existing Buildings (1987)
Superseded three times FEMA 178, FEMA 310, ASCE 31
ATC Present
-
8/13/2019 BRW I | All Presentations
96/100
ATC Present
Extremely active in earthquake fieldAdditional emphasis:
High wind design Flood design issues
Documents, books, training
ATC Present Wind
-
8/13/2019 BRW I | All Presentations
97/100
ATC Present - Wind
0510
ATC Present Flood
-
8/13/2019 BRW I | All Presentations
98/100
ATC Present - FloodA Report on the Real
Risk of Flooding
A Pre-standard for
Determining Flood RiskBased on Vulnerabilityand Consequences
?????
Applied Technology Council
-
8/13/2019 BRW I | All Presentations
99/100
MIKEHUNNICUTT
PANELSIX
Process for Flood Mapping
-
8/13/2019 BRW I | All Presentations
100/100
pp gFlood Mapping Project Phases
DataAcquisition
andEngineering
Analysis
DFIRMProduction
PreliminaryDFIRM
PostPreliminaryProcessing
ProjectScoping
(Three phases)
CommunityCoordination& Mapping
NeedsAssessment
90 D30 D 6 M thV iV i
Appeal &ProtestPeriod
Letter ofFinal
Determination
Effective
DFIRM
CommunityConsultationOfficers (CCO)
Meeting& Public
Open House
Preliminary
DFIRM
Appeals
Resolved
CommunityAdopts
Map