burlington county

Post on 23-Feb-2016

52 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Burlington County. Initial Networks. 79 Stations, 47 Interchanges, Total guideway length is 101.38 km. (63 miles). Total Stations:27 Total Interchanges:17, Total guideway length is 39.56 km. (24.58 miles). - PowerPoint PPT Presentation

TRANSCRIPT

Burlington County

Initial Networks

79 Stations, 47 Interchanges, Total guideway length is 101.38 km. (63 miles)

Total Stations:27 Total Interchanges:17, Total guideway length is 39.56 km. (24.58 miles)

Click icon to add picture

Total Stations:30 Total Interchanges:16, Total guideway length is 40.42 km. (25.12 miles)

Click icon to add picture

Total Stations:22 Total Interchanges:14, Total guideway length is 25.42 km. (15.79 miles)

Networks Statistics; Burlington County

Stations Interchanges

Miles of Guideway

LengthTotal Trip

ends served Toal TripsPeak hour

Trips Fleet sizeAverage trip

Length

Average Vehicle

Occupancy Fare

Vehicle Operating Costs

(#) (#) (miles) (per day) (per day) (per day) (#) (Miles)(Trips/vehicle)

71 41 63 798,808 45,077 6,762 744 5 2 $ 3.00 $ 0.20

Basic Costs, Revenue; Burlington County

Capital Costs Annual Recurring Costs Annual Revenue P&L

Stations Guideway Vehicles TotalCost of Capital

Maintenance Operating Total Fare

Station lease and naming

rights Total

(M$) (M$) (M$) (M$) (M$) (M$) (M$) (M$) (M$) (M$)

$ 142 $ 315 $ 74 $ 531 $ 43 $ 11 $ 7 $ 60 $ 41 $ 3 $ 43 $ (17)

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5

$(200.00)

$(100.00)

$-

$100.00

$200.00

$300.00

$400.00

$500.00

$600.00

$700.00

$800.00

Profit vs. Fare

Fare ($)

Profi

t ($

M)

Break Even point: $4.25

Expansion and Connection

Stage Stations Interchanges Guideways (mi)1 71 41 632 190 174 131.443 298 286 299.634 392 388 409.165 574 513 601.49

Full Network

Click icon to add picture

Total Stations:574 Total Interchanges:513, Total guideway length is 968 km. (601.49 miles)

1 23 45 67 89 1111331551771992212432652873093313533753974194414634855075295515730

10000

20000

30000

40000

50000

60000

70000

Trip ends served per stationBurlington County

Highest to lowest

Trip

Edn

s se

rved

per

day

Profit

Number

Trip ends served

home school work shopping

transportatio

n

entertainment/et

c dinning Total

1

6,424

942

1,254

8,360 16,980

2

27,908

1,953

9,420 39,281

3

4,248

8,172

48,840 61,260

4

2,040

936

3,270 6,246

5

1,812

9,470 11,282

6

4,336

423

2,820 7,579

7

3,484 3,484

Total

999,124 63,392

612,018

-

-

2,654,486

-

4,329,020

County Total Trip Ends

1,770,364

101,918

1,005,180

-

-

4,304,098

-

7,181,560

Trips served (per day)

1,315,015

Networks Statistics; Burlington County

Stations Interchanges

Miles of Guideway

LengthTotal Trip

ends served Total TripsPeak hour

Trips Fleet sizeAverage trip

Length

Average Vehicle

Occupancy Fare

Vehicle Operating Costs

(#) (#) (miles) (per day) (per day) (per day) (#) (Miles)

574 513 601.49

4,346,000

1,315,015

197,252 21,698 5 2 $3.00 $0.20

Basic Costs, Revenue; Burlington CountyCapital Costs Annual Recurring Costs Annual Revenue P&L

Stations Guideway Vehicles Total Cost of Capital Maintenance Operating Total Fare

Station lease and naming

rights Total

(M$) (M$) (M$) (M$) (M$) (M$) (M$) (M$) (M$) (M$)

$1,148 $3,007 $2,170 $6,325 $506 $ 127 $197 $ 830 $1,184 $21 $1,204 $374

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5

$(200.00) $(100.00)

$- $100.00 $200.00 $300.00 $400.00 $500.00 $600.00 $700.00 $800.00

Profit vs. Fare

Fare ($)

Profi

t ($

M)

Break even point: $2.05

Conclusion• Great location for

connectivity to other counties

• Rough start, but better with more stations over time

• Gradual reduction in fares

• Size of demand greatly varies across the county

top related