REFERENCE LIST SOME TYPICAL WASTEWATER TREATMENT PROJECTS
CHTE
AMIX Co.,Ltd – THE EFFICIENCY PARTNER ead office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam el : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 mail : camixco@gmail.com - camixvietnam@gmail.com
Page: 1
Wastewater treatment system
METRO supermarket Hoang Mai, Ha Noi
Project Wastewater treatment system for METRO supermaket Design capacity 50 m3/day. Location Yen So Ward, Hoang Mai Dist., Ha Noi City. Client Metro Cash & Carry Vietnam. Installation duration 07/2007 - 09/2007 Main contractor CAMIX Co.,Ltd Scope of work Whole package for Wastewater treatment:
- Consultancy, Process design, Supply drawings: civil guideline, M & E installation.
- Equipment supply & installation. - Operation, Test run & Commissioning. - System warranty in 24 months.
CAHead Tel Email
P
DL
C
InMS
MIX Co.,Ltd – THE EFFICIENCY PARTNER office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 : camixco@gmail.com - camixvietnam@gmail.com
Page: 2
Saigon-Dalat Hotel under construction Wastewater treatment
roject Wastewater treatment system for Saigon-Dalat Hotel esign capacity 100 m3/day. ocation Da Lat City, Lam Dong Province. lient Saigon tourist. stallation duration 07/2007 - 10/2007 ain contractor CAMIX Co.,Ltd cope of work Whole package for Wastewater treatment:
- Consultancy, Process design, Supply drawings: civil guideline, M & E installation.
- Equipment supply & installation. - Operation, Test run & Commissioning. - System warranty in 12 months.
CAMIX Co.,Ltd – THE EFFICIENCY PARTNHead office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh CitTel : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 31Email : camixco@gmail.com - camixvietnam@gmail.com
Aeration tank
CAMIX - Solving the diprocess, equip
- Supply, selectbiological micr
- Re-traning for- Annual mainte
Sedimentation tank
Project Wastewater treatment system for BAT-Vinataba factory Design capacity 100 m3/day. Location Long Binh Ward, Dong Nai Province. Client BAT-Vinataba Joint-venture Company. Improving duration 12/2006 - 1/2007 Main contractor Glowtec (Singapore) Scope of work of Including:
ER y, Vietnam 8 237 Mobile: +84.903 318 778
Page: 3
sadvantage of the system concerning to: ment & automation. ion & developement of purebred oorganism. operators. nance.
CAMIXHead office: Tel : Email :
Proje
DesigLocatClientInstalMain Scope
Co.,Ltd – THE EFFICIENCY PARTNER 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 camixco@gmail.com - camixvietnam@gmail.com
Page: 4
Wastewater before & after treatment
Wastewater treatment system
ct Wastewater treatment system for METRO Hiep Phu supermaket
n capacity 50 m3/day. ion Hiep Phu Ward, Dist.12, Ho Chi Minh City. Metro Cash & Carry Vietnam. lation duration 10/2006 - 12/2006 contractor CAMIX Co.,Ltd of work Whole package for Wastewater treatment:
- Consultancy, Process design, Supply drawings: civil guideline, M & E installation.
- Equipment supply & installation. - Operation, Test run & Commissioning. - System warranty in 24 months.
CAMIX Co.,Ltd – THE EFFICIENCY PARTNER Head office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam Tel : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 Email : camixco@gmail.com - camixvietnam@gmail.com
Page: 5
Project Wastewater treatment system for METRO Da Nang supermaket
Design capacity 50 m3/day. Location Khue Trung Ward, Hai Chau Dist., Da Nang City. Client Metro Cash & Carry Vietnam. Installation duration 10/2005 - 12/2005 Main contractor CAMIX Co.,Ltd Scope of work Whole package for Wastewater treatment:
- Consultancy, Process design, Supply drawings: civil guideline, M & E installation.
- Equipment supply & installation. - Operation, Test run & Commissioning. - System warranty in 24 months.
Overview Wastewater treatment system
Wastewater before & after treatment
CAMIX Co.,Ltd – THE EFFICIENCY PARTNER Head office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam Tel : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 Email : camixco@gmail.com - camixvietnam@gmail.com
Page: 6
Overview Wastewater treatment system
Project Wastewater treatment system for METRO Hai Phong supermaket
Design capacity 50 m3/day. Location So Dau Ward, Hong Bang Dist., Hai Phong City. Client Metro Cash & Carry Vietnam. Installation duration 8/2005 - 10/2005 Main contractor CAMIX Co.,Ltd Scope of work Whole package for Wastewater treatment:
- Consultancy, Process design, Supply drawings: civil guideline, M & E installation.
- Equipment supply & installation. - Operation, Test run & Commissioning. - System warranty in 24 months.
Wastewater before & after treatment
CHeTeEm
Biological treatment part only
Overview Wastewater treatment system
Project Wastewater treatment system for new construction Tan Son Nhat airport project.
Design capacity 60 m3/day. Location Tan Son Nhat airport, Ho Chi Minh City. Client KTOM Joint-venture (Japan). Installation duration 1/2005 - 4/2005 Operation duration 4/2005 – 4/2007 Main contractor CAMIX Co.,Ltd Scope of work Whole package for Wastewater treatment:
AMIX Co.,Ltd – THE EFFICIENCY PARTNER ad office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam l : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 ail : camixco@gmail.com - camixvietnam@gmail.com
Page: 7
- Consultancy, Process design, Supply drawings: civil guideline, M & E installation.
- Equipment supply & installation. - System operation in 2 years.
CHeTeEm
Biological treatment part only
Project Wastewater treatment system for Nam Phuong food processing facory.
Design capacity 300 m3/day. Location Tan Phu Trung IZ, Cu Chi, Ho Chi Minh City. Client Nam Phuong Co.,Ltd. Installation duration 7/2005 - 11/2005 Main contractor CAMIX Co.,Ltd Scope of work Whole package for Wastewater treatment:
AMIX Co.,Ltd – THE EFFICIENCY PARTNER ad office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam l : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 ail : camixco@gmail.com - camixvietnam@gmail.com
Page: 8
- Consultancy, Process design, Supply drawings: civil guideline, M & E installation.
- Civil construction, Equipment supply & installation. - Operation, Test run & Commissioning. - System warranty in 12 months.
CHeTeEm
Overview of wastewater treatment system
Project Wastewater treatment system for ASIAN pharmaceutical factory.
Design capacity 50 m3/day. Location Tan Binh IZ, Ho Chi Minh City. Client ASIA Pharmaceutical Co.,Ltd. Installation duration 3/2002 - 7/2002 Main contractor Tan Viet Tin construction & trading Co.,Ltd Scope of work of Whole package for Wastewater treatment:
AMIX Co.,Ltd – THE EFFICIENCY PARTNER ad office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam l : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 ail : camixco@gmail.com - camixvietnam@gmail.com
Page: 9
CAMIX - Consultancy, Process design, Supply drawings: civil guideline, M & E installation.
- Equipment supply & installation. - Operation, Test run & Commissioning. - System warranty in 12 months.
CAMIX Co.,Ltd – THE EFFICIENCY PARTNER Head office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam Tel : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 Email : camixco@gmail.com - camixvietnam@gmail.com
Page: 10
Overview of wastewater treatment system Project Wastewater treatment system for Quoc Anh hospital.
Design capacity 50 m3/day. Location Tan Tao Ward, Binh Tan Dist, Ho Chi Minh City. Client Nguyet Anh Pharmaceutical Co.,Ltd. Installation duration 12/2004 - 4/2005 Main contractor CAMIX Co.,Ltd Scope of work Whole package for Wastewater treatment:
- Consultancy, Process design, Supply drawings: civil guideline, M & E installation.
- Equipment supply & installation. - Operation, Test run & Commissioning. - System warranty in 12 months.
CAMIX Co.,Ltd – THE EFFICIENCY PARTNER Head office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam Tel : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 Email : camixco@gmail.com - camixvietnam@gmail.com
Page: 11
OVERVIEW Biological treatment tank
Project Wastewater treatment system for White sand resort. Design capacity 50 m3/day. Location Mui Ne, Phan Thiet City. Client White sand resort Co.,Ltd Installation duration 10/2002 - 4/2004 Main contractor CAMIX Co.,Ltd Scope of work Whole package for Wastewater treatment:
- Consultancy, Process design, Supply drawings: civil guideline, M & E installation.
- Equipment supply & installation. - Operation, Test run & Commissioning. - System warranty in 12 months.
CHTeE
e
m
OVERVIEW OF WASTEWATER TREATMENT SYSTEM
Project Wastewater treatment system for Heineken brewery. Design capacity 1.400 m3/day. Location Thuong Tin Dist., Ha Tay Province . Client HEINEKEN Group. Installation duration 10/2002 - 12/2003 Main contractor WATERLEAU – Global Water Technology N.V (Belgium) Scope of work of Including:
AMIX Co.,Ltd – THE EFFICIENCY PARTNER ad office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam l : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 ail : camixco@gmail.com - camixvietnam@gmail.com
Page: 12
CAMIX - Interview & selection local M & E sub-contractors. - Detailed design for: civil construction, M & E
installation. - Supervision for civil construction, process, M & E
installation. - Help Waterleau experts in Operation, Test run &
Commissioning. - Help Waterleau in System warranty in 12 months.
CAHeaTelEm
Aerobic biological treatment tank
Project Wastewater treatment system for CAMIMEX seafood processing complex.
Design capacity 2.500 m3/day. Location Ca Mau City. Client CAMIMEX, JOSTOCO & SEAPREMEXCO. Installation duration 2/2002 - 4/2004 Main contractor Seghers Better Technology for Water N.V (Belgium) Scope of work of Including:
MIX Co.,Ltd – THE EFFICIENCY PARTNER d office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam
: +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 ail : camixco@gmail.com - camixvietnam@gmail.com
Page: 13
CAMIX - Interview & selection local M & E sub-contractors. - Detailed design for: civil construction, M & E
installation. - Supervision for civil construction, process, M & E
installation. - Help Seghers experts in Operation, Test run &
Commissioning. - Help Seghers in System warranty in 12 months.
CHTE
AMIX Co.,Ltd – THE EFFICIENCY PARTNER ead office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam el : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 mail : camixco@gmail.com - camixvietnam@gmail.com
Page: 14
Aerobic biological treatment tank
Project Wastewater treatment system for Gallant Ocean seafood factory.
Design capacity 350 m3/day. Location Nha Trang City, Khanh Hoa Province. Client Nha Trang seafood processing factory. Installation duration 9/2001 - 4/2002 Main contractor INVESCONS civil cosultancy Co.,Ltd, Ho Chi Minh City. Scope of work of CAMIX
Including: - Consultancy, Process design, Supply drawings: civil
guideline, M & E installation. - Cost estimation for civil construction, M & E supply &
installation.
CHTE
eem
Aerobic biological treatment tank
Project Wastewater treatment system for Khanh Hoa sugar cane factory.
Design capacity 12.000 m3/day. Location Cam Ranh, Khanh Hoa Province. Client Khanh Hoa Sugar Cane Company. Installation duration 2/2001 - 5/2002 Main contractor Seghers Better Technology for Water N.V (Belgium) Scope of work of Including:
AMIX Co.,Ltd – THE EFFICIENCY PARTNER ad office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam l : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 ail : camixco@gmail.com - camixvietnam@gmail.com
Page: 15
CAMIX - Interview & selection local M & E sub-contractors. - Detailed design for: civil construction, M & E
installation. - Supervision for civil construction, process, M & E
installation. - Help Seghers experts in Operation, Test run &
Commissioning. - Help Seghers in System warranty in 12 months.
CAHeaTel Ema
OVERVIEW OF WASTEWATER TREATMENT SYSTEM
Project Wastewater treatment system for FOSTER’S brewery. Design capacity 1.400 m3/day. Location My Tho City, Tien Giang Province. Client FOSTER’S Group. Installation duration 12/2000 - 9/2001 Main contractor Seghers Better Technology for Water N.V (Belgium) Scope of work of Including:
MIX Co.,Ltd – THE EFFICIENCY PARTNER d office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 il : camixco@gmail.com - camixvietnam@gmail.com
Page: 16
CAMIX - Interview & selection local M & E sub-contractors. - Detailed design for: civil construction, M & E
installation. - Supervision for civil construction, process, M & E
installation. - Help Seghers experts in Operation, Test run &
Commissioning. - Help Seghers in System warranty in 12 months.
CAMIX Co.,Ltd – THE EFFICIENCY PARTNER Head office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam Tel : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 Email : camixco@gmail.com - camixvietnam@gmail.com
Page: 17
Aerobic biological treatment tank
Project Wastewater treatment system for HEINEKEN brewery. Design capacity 1.400 m3/day. Location MYANMA. Client HEINKEN Group. Installation duration 1/2000 - 12/2000 Main contractor Seghers Better Technology for Water N.V (Belgium) Scope of work of CAMIX
Including: - Detailed design for: civil construction, M & E
installation. - Supervision for civil construction, process, M & E
installation. - Help Seghers experts in Operation, Test run &
Commissioning. - Help Seghers in System warranty in 12 months.
CAHeaTel Ema
Anaerobic biological treatment tank
Project Extension of Wastewater treatment system for HEINEKEN brewery.
Extension capacity 600 m3/day (from 1.800m3/day up to 2.400m3/day). Location Bangkok, Thailand. Client HEINKEN Group. Installation duration 4/1999 - 12/1999 Main contractor Seghers Better Technology for Water N.V (Belgium) Scope of work of Including:
MIX Co.,Ltd – THE EFFICIENCY PARTNER d office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam : +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 il : camixco@gmail.com - camixvietnam@gmail.com
Page: 18
CAMIX - Detailed design for: civil construction, M & E installation.
- Supervision for civil construction, process, M & E installation.
- Help Seghers experts in Operation, Test run & Commissioning.
- Help Seghers in System warranty in 12 months.
CAHeaTelEm
MIX Co.,Ltd – THE EFFICIENCY PARTNER d office: 34, Road 57A, TanTao Ward, BinhTan Dist., Hochiminh City, Vietnam
: +84.8.407 3940 Fax: +84.8.407 3938 Mobile: +84.913 318 237 Mobile: +84.903 318 778 ail : camixco@gmail.com - camixvietnam@gmail.com
Page: 19
Aerobic biological treatment tank
Project Central wastewater treatment plant, Bien Hoa 2 IZ. Design capacity 4.000 m3/day. Location Bien Hoa 2 IZ, Bien Hoa City, Dong Nai Province. Client HEINKEN Group. Installation duration 1/2000 - 12/2000 Main contractor Seghers Better Technology for Water N.V (Belgium) Scope of work of CAMIX
Including: - Detailed design for: civil construction, M & E
installation. - Supervision for civil construction, process, M & E
installation. - Help Seghers experts in Operation, Test run &
Commissioning. - Help Seghers in System warranty in 12 months.