DESCRIPTION

This presentation was given at the Global CCS Institute/CSLF meeting on CCS Project Integration that was held in London on 3 November 2011. The aim of the meeting was to share experiences on CCS project integration; and to identify priority integration topics that need further attention to facilitate CCS project development and deployment.You can view more presentations from the event at http://www.globalccsinstitute.com/community/blogs/authors/klaasvanalphen/2011/11/25/presentations-global-ccs-institutecslf-meeting-ccs

TRANSCRIPT

GLOBAL CCS INSTITUTE

CCS PROJECT INTEGRATION

WORKSHOPWORKSHOPChurch House London

3rd November 2011

INTRODUCTION and SCENE SET

Nick Otter

WWW.GLOBALCCSINSTITUTE.COM

GLOBAL CCS INSTITUTE

RELEASED 4 OCTOBER 2011

The Global Status of CCS: 2011 report

� current position of CCS projects globally

1

GLOBAL CCS INSTITUTE

MEASURED PROGRESS OF LARGE-SCALE

INTEGRATED PROJECTS SINCE 2009

2

GLOBAL CCS INSTITUTE

GLOBAL SPREAD OF PROJECTS

3

GLOBAL CCS INSTITUTE

SOME KEY TAKE-AWAYS

• Impact of current financial crisis increasingly severe

• Two power projects under construction - with

government funding and EOR revenue.

• A number of power projects are on the verge of FID

but making the business case is difficult.but making the business case is difficult.

4

Continuing urgent need to maintain momentum on CCS projects

GLOBAL CCS INSTITUTE

PROJECT INTEGRATION – A KEY ELEMENT OF CSLF TECHNICAL ROUTE MAP (TRM)

• Updated CSLF TRM done in conjunction with • Updated CSLF TRM done in conjunction with

Global CCS Institute – 2009

• Need for large scale demonstration CCS projects

identified, in particular those of integrated nature

• Joint action on `integration` issues agreed 2010

5

GLOBAL CCS INSTITUTE

INSTITUTE INITIATIVE ON THEMATICS

� Discussions held at GHGT-10 in October 2010

� 4 themes identified from projects activities

66

� 4 themes identified from projects activities

� Hub Development Challenges

� Managing Impacts of CO2 storage on

groundwater

� Storage learning from EOR operations

� Project Integration

GLOBAL CCS INSTITUTE

JOINT CSLF/INSTITUTE EXPERT WORKSHOP ON PROJECT INTEGRATION

• Primary aims in addition to sharing of experience

7

– Establish a set of priority actions in relation to technical

integration, in particular of a capture facility into a host

plant – morning focus

– Assess support for and contents of “A CCS Project

Management Handbook” outlining decision gates/criteria

across the whole chain and identifying key integration

and critical path issues within/between components of

the full CO2 chain – afternoon focus

GLOBAL CCS INSTITUTE

JOINT CSLF/INSTITUTE EXPERT WORKSHOP ON PROJECT INTEGRATION

• Format

– Set of presentations from real projects and experiences

8

– Set of presentations from real projects and experiences

addressing different aspects of integration

– Interactive open panel identifying high priority integration

topics that need further attention to facilitate CCS project

development and deployment

• Anticipated Outcome

– Basis of an action plan to be taken forward by the Global

CCS Institute and the CSLF Technical Group

GLOBAL CCS INSTITUTE

CCS PROJECT INTEGRATION

WORKSHOPWORKSHOPChurch House London

3rd November 2011

WWW.GLOBALCCSINSTITUTE.COM

top related