Chapter 8 Implementing Disaster Recovery

and High Availability

Hands-On Virtual Computing

Hands-On Virtual Computing

Objectives

• Describe backup and recovery concepts for virtual machines

• Use VMware Server and Hyper-V to back up and recover virtual machines

• Plan a high-availability system that uses clustering

• Use VMware Server and Hyper-V to set up clustering

2

Hands-On Virtual Computing 3

Understanding Backup and Recovery Concepts for Virtual Machines

• Offline backups– Stable backups are created during downtime, when

files are closed and offline to user access

• Quiesced online backup (warm backup)– Backing up applications while they are in use

Hands-On Virtual Computing 4

Backup Types

• Archive attribute – Enabled when the file is created or a change is made

to the file

• Full backup – Backs up all selected files and folders and clears the

archive attribute on these files and folders

• Incremental backup – Backs up only files that have changed since the last

full or incremental backup

Hands-On Virtual Computing 5

Hands-On Virtual Computing

Backup Types (continued)

• Differential backup – Backs up only the files changed since the last full

backup took place

• Daily backup– Uses the file’s modified date to copy selected files

that have been modified on the day the daily backup is performed

• Copy backup– Identical to a full backup but does not clear the

archive attribute for any files and folders it backs up

6

Hands-On Virtual Computing 7

Hands-On Virtual Computing

Making Backups with the Volume Shadow Copy Service

• Volume Shadow Copy Service (VSS) – Consistent shadow copies of data files can be

backed up and restored reliably

• VMware Server and Hyper-V – Compatible with VSS backups– Allows virtual machines to be backed up while

running

8

Hands-On Virtual Computing 9

Hands-On Virtual Computing

Developing a Backup and Recovery Strategy

• Running servers as virtual machines – Makes the backup and restore processes much

easier

• When performing regular backups of virtual servers from the host computer – Log files on a virtual server do not show it has been

backed up

• Good backup plan – Should include a backup of each virtual machine’s

files made from the host computer

10

Hands-On Virtual Computing 11

Hands-On Virtual Computing

Implementing Backup and Recovery Systems

• Drawback of using Windows Server Backup – Is limited to backing up entire volumes, so you can

not select specific folders to include or exclude from the backup

– System volume (drive C) must be included in all backups

– Can select only full or incremental backup types

12

Hands-On Virtual Computing

Installing the Windows Server Backup Software

• Activity 8-1: Installing Windows Server Backup

• Time Required: 10 minutes

• Objective: Install Windows Server Backup on a virtual machine

• Requirements: The Windows Server 2008 Child 1 virtual machine created in Chapter 7; VMware Server or Hyper-V

13

Hands-On Virtual Computing

Backing Up Virtual Machines

• Before performing a manual or one-time backup– You must run a scheduled backup to provision

(allocate) the disks

• To perform a scheduled backup– Start Windows Server Backup from the

Administrative Tools menu

• Creating a scheduled backup in Windows Server Backup – Enables you to automate the backup process

14

Hands-On Virtual Computing 15

Hands-On Virtual Computing 16

Hands-On Virtual Computing

Backing Up Virtual Machines (continued)

• Activity 8-2: Performing a Windows Server 2008 Scheduled Backup

• Time Required: 10 minutes

• Objective: Use Windows Server Backup to perform a scheduled backup

• Requirements: Completion of Activity 8-1

17

Hands-On Virtual Computing

Backing Up Virtual Machines from the Host

• VSS Writer service– Interacts with VMware Tools on virtual servers when

making a backup– Can notify the virtual server and applications of the

backup process and update log files

18

Hands-On Virtual Computing

Backing Up Virtual Machines from the Host (continued)

• Activity 8-3: Enabling the VMware VSS Writer Service

• Time Required: 10 minutes

• Objective: Configure the VSS Writer service for VMware Server

• Requirements: VMware Server running on Windows Vista

19

Hands-On Virtual Computing

• Activity 8-4: Backing Up Virtual Machines from the Host

• Time Required: 20 minutes

• Objective: Back up a virtual machine from the host computer with Vista Backup

• Requirements: Windows Vista and completion of Activity 8-3; a second partition on the Vista computer’s removable drive with at least 12 GB free space for storing the backup

20

Backing Up Virtual Machines from the Host (continued)

Understanding High Availability for Virtual Machines

• High availability – Uses computing technology to allow computers to

work together in a group called a cluster

• Cluster – Uses multiple computers to provide protected

applications and shared data to client computers

• Failover – Makes applications available immediately through

another computer in the cluster

Hands-On Virtual Computing 21

Windows Server 2008 Clustering Components and Concepts

• Clustering– Should provide high availability of servers through

redundancy

• Cluster components– Shared cluster storage– Two private networks used only by cluster nodes– Public network that connects cluster nodes to clients

and other network resources

• Storage area network (SAN)– Private network that uses a dedicated, high speed

channelHands-On Virtual Computing 22

Hands-On Virtual Computing 23

Hands-On Virtual Computing

Windows Server 2008 Clustering Components and Concepts (continued)• iSCSI

– Allows clustered computers to send SCSI-formatted data requests to the network-attached cluster device via IP packets

• Logical unit numbers (LUNs)– Used to identify a disk or volume that is mapped to a

drive letter on a clustered server

• iSCSI target– Storage device displaying a LUN

24

Hands-On Virtual Computing

• iSCSI initiator– Clustered server connecting to the storage device

with a LUN

• Cluster heartbeat– A signal between cluster nodes for determining node

status

• Stretch clustering – Support clusters with nodes running on different

networks

25

Windows Server 2008 Clustering Components and Concepts (continued)

Hands-On Virtual Computing 26

Hands-On Virtual Computing

Windows Server 2008 Clustering Components and Concepts (continued)

• Load balancing– User requests can be handled by multiple cluster

nodes

• Active/passive cluster– Only one cluster node hosts the application at any

time

• Failback– Service or application is moved back to its original

server automatically when the server is brought back as an active node in the cluster

27

Hands-On Virtual Computing

Clustering Hyper-V Virtual Servers for Quick Migration and Failover

• To set up clustering with Hyper-V– You need to move virtual machine files to a shared

storage device, and then enable Hyper-V as a clustered service on each cluster node

• Quick migration – Cluster process in which you move a service

manually from the primary host to another cluster host

28

Hands-On Virtual Computing 29

Hands-On Virtual Computing 30

Hands-On Virtual Computing

Using Clustering with Virtual Machines

• Planning cluster networks– To build a cluster, you need three networks

• Private network dedicated to the cluster

• Private network dedicated to the iSCSI SAN

• Third network for general use

31

Hands-On Virtual Computing

Planning Cluster Networks

• Activity 8-5: Planning the Cluster Configuration

• Time Required: 20 minutes

• Objective: Gather information for planning a cluster

• Requirements: The Windows Server 2008 Child 1 and Child 2 virtual servers created in Chapter 7

32

Hands-On Virtual Computing

Preparing Servers for Clustering

• Activity 8-6: Installing Active Directory on the Domain Controller

• Time Required: 20 minutes

• Objective: Install Active Directory on a Windows Server 2008 domain controller

• Requirements: Completion of Activity 8-5; Windows Server 2008 running on the host computer

33

Hands-On Virtual Computing

Preparing Servers for Clustering (continued)

• Activity 8-7: Adding a Member Server to the Domain

• Time Required: 10 minutes

• Objective: Configure a member server.

• Requirements: Completion of Activities 8-5 and 8-6

34

Hands-On Virtual Computing

Installing an iSCSI Target

• Activity 8-8: Installing iSCSI Emulator Software

• Time Required: 20 minutes

• Objective: Download and install iSCSI emulator software on your designated iSCSI target

• Requirements: Completion of Activities 8-5 through 8-7; access to the Internet from the iSCSI target

35

Hands-On Virtual Computing

Installing an iSCSI Target (continued)

• Activity 8-9: Creating Shared iSCSI Target Devices

• Time Required: 20 minutes

• Objective: Create shared iSCSI target devices

• Requirements: Completion of Activity 8-8; 2 GB free disk space on the iSCSI target computer

36

Hands-On Virtual Computing

Installing an iSCSI Target (continued)

• Activity 8-10: Connecting Servers to the iSCSI Target Device

• Time Required: 20 minutes

• Objective: Use Windows Server 2008 iSCSI Initiator to connect to a shared iSCSI target device

• Requirements: Completion of Activities 8-5 through 8-9

37

Hands-On Virtual Computing

Installing the Failover Clustering Service

• Activity 8-11: Installing the Failover Clustering Service

• Time Required: 10 minutes

• Objective: Install the Failover Clustering service

• Requirements: Completion of Activities 8-5 through 8-10

38

Hands-On Virtual Computing

Creating Cluster Configurations

• Activity 8-12: Creating a Cluster Configuration

• Time Required: 10 minutes

• Objective: Use the Failover Cluster Management snap-in to create a cluster

• Requirements: Completion of Activity 8-11

39

Hands-On Virtual Computing

Creating Cluster Configurations (continued)

• Activity 8-13: Configuring a Clustered Service

• Time Required: 10 minutes

• Objective: Configure the File Server service as a clustered service

• Requirements: Completion of Activity 8-12

40

Hands-On Virtual Computing

Creating Cluster Configurations (continued)

• Activity 8-14: Moving the File Server Service to Another Cluster Node

• Time Required: 10 minutes

• Objective: Move a clustered service from one node to another

• Requirements: Completion of Activity 8-13

41

Hands-On Virtual Computing

Creating Cluster Configurations (continued)

• Activity 8-15: Shutting Down the Cluster Service

• Time Required: 10 minutes

• Objective: Use the Failover Cluster Management snap-in to shut down the cluster service and return the member server to a stand-alone server

• Requirements: Completion of Activity 8-14

42

Summary

• Offline backups– Back up closed files and applications

• Backups can be categorized as full, incremental, or differential

• Full backup – Backs up all files on a selected volume

• Volume Shadow Copy Service (VSS) – Uses the quiesce process to create a shadow copy

of a file or database

Hands-On Virtual Computing 43

Summary (continued)

• Both VMware Server and Hyper-V – Are compatible with VSS backups, allowing virtual

machines to be backed up while running

• When backing up virtual machines– You can store backups on virtual hard disks

• Windows Server Backup – Backup software included with Windows Server 2008

• Cluster – Provides protected applications and shared data to

client computers

Hands-On Virtual Computing 44

Hands-On Virtual Computing

Summary (continued)

• If any computer in the cluster fails– The failover process ensures availability of

applications and data

• Cluster components– Some form of shared storage, private networks used

only by cluster nodes, and a public network

• Quick migration – Cluster process in which you move a service

manually from the primary host to another cluster host

45

top related