chardon service facility details
Post on 06-Apr-2018
224 Views
Preview:
TRANSCRIPT
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 1/20
Municipal Service Garage Facility
For
The City of Chardon
November 10, 2011
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 2/20
• Proposed Facilities• Site Development
• Schedule Status
• Budget Status
Agenda
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 3/20
• Service GarageBuilding
• Salt Storage Barn
• Cold StorageBuilding
• Bulk Materials
Storage• Fuel Storage
• Snow Storage Area
Description of Proposed Facilities
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 4/20
Proposed Facilities – Service Garage Building
– 15,908 Square Feet
– 2 Maintenance bays – 13 Vehicle storagebays
– Wash bay – Locker Rooms – Lunch Room
– Offices – Storage Mezzanine
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 5/20
Proposed Facilities – Multi-Department Cold Storage Building
– 4,550 Square Feet
– Enclosed cold storage
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 6/20
Proposed Facilities – Salt Storage
– Salt Capacity for 1season at buildout withloader operating area
– Lean-to storage area
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 7/20
Proposed Facilities – Salt Storage
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 8/20
Site Development
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 9/20
Site Development
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 10/20
Site Development
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 11/20
Site Development
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 12/20
Site Development
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 13/20
Site Development
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 14/20
Site Development
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 15/20
• Measures to mitigate impacts – Traffic patterns designed to minimize backing
– Bays configured to minimize backing
– Salt handling inside building – EPA Recommendation to reduce noise and environmental
impact
– Reduces noise
– Reduction of light pollution – Preservation of existing wooded areas and streams
– Design of landscape buffers
Design Considerations
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 16/20
• Planning Commission Review (11/21/11) – Request for Conditional Use
– Request for Accessory Structure Location Variance
– Request for Accessory Structure Height Variance – Request for Concept Plan Approval
• Design Development
• Construction Document Development• Bidding / Contract Award
Next Steps
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 17/20
• Clearing - Late 2011• Design complete - Jan 2012
• Construction Begins - April 2012
• Construction Complete - Fall 2012
Projected Schedule
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 18/20
Schematic Design - Estimate
($161,064.00)$4,936,872.00$5,097,936.00Total
($7,670.00)$290,327.00$297,997.00Contingencies and Allowances
$0.00$41,043.00$41,043.00Fuel Storage
$672,500$0.00$168,635.00$168,635.00Bulk Storage Bins
$3614,400($17,010.00)$519,413.00$502,403.00Salt Stroage Building
$664,550($142,913.00)$298,422.00$441,335.00Cold-Storage Building
$12615,908($27,491.00)$2,009,857.00$2,037,348.00Service Garage Building
$0.00$1,609,175.00$1,609,175.00Site Development
Cost/SFArea (SF)ChangeNov 11 2011Nov 30 2010Component
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 19/20
Schematic Design - Estimate
$29<1 season11,52012096$329,000
$291 season14,400120120$420,000
cost/sfCapacityArea(SF)
Width(ft)
Length(ft)Building Cost
8/3/2019 Chardon Service Facility Details
http://slidepdf.com/reader/full/chardon-service-facility-details 20/20
Schematic Design - Estimate
top related