city of walhalla downtown greenway master plan · 8/12/2019  · final report city review process...

Post on 08-Jul-2020

3 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

STUDIO MAIN LLC AUGUST 12, 2019

Studio Main

City of Walhalla

Downtown GreenwayMaster Plan

Studio Main

DOWNTOWN GREENWAY MASTER PLAN

Studio MainABOUT STUDIO MAIN

• SeamonWhiteside + Associates

2006-2013

• Alta Planning and Design

2013-2018

• City of Easley Planning Director

2018-Present

• Expertise with specific experience

in economic development, Main

Street, placemaking, greenways,

and implementation

• Over 300 miles of trails and

greenways (planned and built in

SC)

Built from foundations of North America’s leading landscape

architects, planners and engineers – ultimately being able to give a

‘handlebar perspective’ with a ‘Main Street’ approach

DOWNTOWN GREENWAY MASTER PLAN

Studio Main

“Leading innovation is not about getting people to follow you into the future, it is about getting people to co-create it with you.“

— Linda A. Hill, Harvard Business School

Studio Main

DOWNTOWN GREENWAY MASTER PLAN

Studio Main

How would you describe Downtown to a visitor?

What do you LOVE about this place?

What do you HATE about this place?

What do you need to accomplish your vision?

2015 MASTER PLANDOWNTOWN MASTER PLAN

COMMUNITY INPUT

DOWNTOWN GREENWAY MASTER PLAN

Studio Main2015 MASTER PLANDOWNTOWN MASTER PLAN

COMMUNITY INPUT

DOWNTOWN GREENWAY MASTER PLAN

Studio Main2016 MASTER PLANCOMMUNITY INPUT

DOWNTOWN GREENWAY MASTER PLAN

Studio Main2016 MASTER PLANDOWNTOWN MASTER PLAN

PALMETTO TRAIL MASTER PLAN

DOWNTOWN GREENWAY MASTER PLAN

Studio Main2016 MASTER PLANDOWNTOWN MASTER PLAN

COMMUNITY INPUT

DOWNTOWN GREENWAY MASTER PLAN

Studio Main2015 MASTER PLANDOWNTOWN MASTER PLAN

FINAL REPORT

City Review Process – Identify Catalyst Projects

Find a Champion and Maintain Momentum!

Zoning Ordinance and Code Updates

Develop Funding Strategies (Façade Grant Program, etc.)

Capitalize on the Brand – (Palmetto Trail, Ocktoberfest, etc.)

Wayfinding Signage

DOWNTOWN GREENWAY MASTER PLAN

Studio MainTIMES HAVE CHANGED…DOWNTOWN MASTER PLAN

STUDIO MAIN LLC AUGUST 12, 2019

Studio Main

THE SITEOpportunities for Downtown Greenway Connector

Studio Main

DOWNTOWN GREENWAY MASTER PLAN

Studio MainOPPORTUNITIESDOWNTOWN GREENWAY CONNECTOR

BUILDING ON THE WORK ALREADY

COMPLETED FOR DOWNTOWN

UTILIZING EXISTING INFRASTRUCTURE

PARK/TRAIL-FRONTED DEVELOPMENTS

BUILD ON AN EXISTING CITY NETWORK

PUBLIC/PRIVATE PARTNERSHIPS/FUNDING

AT-GRADE CROSSINGS EXIST AND VISIBLE

DOWNTOWN

DOWNTOWN GREENWAY MASTER PLAN

Studio MainOVERVIEWDOWNTOWN GREENWAY CONNECTOR

DOWNTOWN GREENWAY MASTER PLAN

Studio MainOVERVIEWDOWNTOWN GREENWAY CONNECTOR

+/-3.25 MILES$5.7M

DOWNTOWN GREENWAY MASTER PLAN

Studio MainPHASE ONEDOWNTOWN GREENWAY CONNECTOR

+/-1.50 MILES$1.7M (SOUTH)

$661K (NORTH)

DOWNTOWN GREENWAY MASTER PLAN

Studio MainNORTH BROAD PHASE ONEDOWNTOWN GREENWAY CONNECTOR

DOWNTOWN GREENWAY MASTER PLAN

Studio MainNORTH BROAD PHASE ONEDOWNTOWN GREENWAY CONNECTOR

DOWNTOWN GREENWAY MASTER PLAN

Studio MainSOUTH BROAD PHASE ONEDOWNTOWN GREENWAY CONNECTOR

DOWNTOWN GREENWAY MASTER PLAN

Studio MainSOUTH BROAD PHASE ONEDOWNTOWN GREENWAY CONNECTOR

DOWNTOWN GREENWAY MASTER PLAN

Studio MainGREENWAY PUBLIC ARTDOWNTOWN GREENWAY CONNECTOR

DOWNTOWN GREENWAY MASTER PLAN

Studio MainGREENWAY LANDSCAPEDOWNTOWN GREENWAY CONNECTOR

STUDIO MAIN LLC AUGUST 12, 2019

Studio Main

ENHANCING THE VISIONAlign current planning efforts, funding opportunities, and community priorities to identify an implementation focused, connectivity strategy

Studio Main

DOWNTOWN GREENWAY MASTER PLAN

Studio MainNEXT STEPSDOWNTOWN GREENWAY CONNECTOR

FUNDING…PUBLIC, PRIVATE, CORPORATE

PLAN FOR RAZORBACK PARK FIRST

COORDINATE WITH COUNTY, STATE, AND

FEDERAL FUNDING

PROMOTE, PROMOTE, PROMOTE!!!

ENHANCE EXISTING CROSSINGS

DOWNTOWN

DOWNTOWN GREENWAY MASTER PLAN

Studio MainQUESTIONSDOWNTOWN GREENWAY CONNECTOR

BLAKE SANDERS, PLASTUDIO MAIN LLC

E. BLAKE@STUDIOMAINLLC.COM

P. 864.617.0347

top related