cognizant technology solutions private. ltd monthly review meeting – august 2008
Post on 13-Jan-2016
218 Views
Preview:
TRANSCRIPT
COGNIZANT TECHNOLOGY SOLUTIONS PRIVATE. LTD
Monthly Review Meeting – August 2008
Lead Facility Services Globally
SAFETY
No Safety Issues
Lead Facility Services Globally
Organization Chart
Lead Facility Services Globally
FMS Update
Phase 1 Earth pit OHMS value taken.
Phase 2 all switch room split A/C outdoor unit support channel removed and provided to ground floor.
Monthly service was done for passengers lift 1 & 2 in Phase 1 by ETA MELCO .
Phase 1 & 2 workstation raw power and ups power point sticker is pasting work done .
50 KVA capacitor has been connected in the AC panel - 1/1 spare FSU 125 A at Phase 1 ground floor electrical room
Technical
Lead Facility Services Globally
LUX meters Readings taken for all floors of Phase- 1 & 2
PDB socket identification marking sticker work done at Phase 1.
50 KVA capacitor connected to MV panel – 2
50 KVA capacitor connected in Phase 2 security room, MV panel - 2, UPS / A/c unit.
FMS Update
Technical
Lead Facility Services Globally
Phase 1, 8th floor to 4th floor side wall scrubbed
Substation cobweb removed.
Fire hydrant pipe lines at Car parking dusting work done.
Outer area pan stain removed.
White patches on the wash basin has been removed.
FMS Update
House keeping
Lead Facility Services Globally
Sending feedback forms to associates for all the complaints and requests.
No pending calls.
18 Nos of rat has been caught
FMS Update
Admin Helpdesk
Pest Control
Lead Facility Services Globally
Highlight
Acrylic sheet fixed for hand support near shoe polishing machine at phase 1 & 2.
Wall Painting done at Phase 1 & 2 near shoe polishing.
200 no's chair arrangements done in phase - 1 ,8th floor cafeteria for quiz competition program.
Received 7 appreciation mails from associates for the quick response time level.
House keeping
Technical
Helpdesk
Lead Facility Services Globally
Power Consumption
Jan 08 Feb 08 Mar 08 Apr 08 May 08 Jun 08 Jul 08 Aug 08 Sep 08 Oct 08 Nov 08 Dec 08 REMARKAS
TOTAL CONS 429,450 473,316 438,566 542,703 528,641 522,847 508298
EB 427,920 468,336 381216 472368 487584 502248 463464
DG 1,530 4,980 57350 70335 41057 20599 44834
P.F.CUM 0.98 0.97 0.97 0.97 0.960 0.970 0.97
MD SANCTIONED
1350 1350 1350 1350 1350 1350 1350
MD REACHED 1,030 1,035 1,056 1,152 1249 1205 1230
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
MD
RE
AC
HE
D
0
50000
100000
150000
200000
250000
300000
350000
400000
450000
500000
550000
CO
NS
UM
PT
ION
IN
KW
H
MD REACHED
Lead Facility Services Globally
Diesel Consumption
Jan 08 Feb 08 Mar 08 Apr 08 May 08 Jun 08 Jul 08 Aug 08 Sep 08 Oct 08 Nov 08 Dec 08 REMARKSCONSUMPTION TOTAL IN LTRS 826 1,133 21,374 20,896 11,984 6,537 13,327
COST IN RUPEES 29,736 40,788 769,464 752,256 431,424 235,332 479,772
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
20,000
22,000
CO
NSU
MPT
ION
IN L
TRS
0
50000
100000
150000
200000
250000
300000
350000
400000
450000
500000
550000
600000
650000
700000
750000
800000
CO
ST IN
RS
Lead Facility Services Globally
Water Consumption
Jan 08 Feb 08 Mar 08 Apr 08 May 08 Jun 08 Jul 08 Aug 08 Sep 08 Oct 08 Nov 08 Dec 08 REMARKS
LORRY 1980 1920 1644 2100 2402 2112 2088 2016
CONSUMPTION IN KL 1,980 1,920 1,644 2,100 2402 2,112 2,088 2,016
COST IN RUPEES 91,080 88,320 75,624 96,600 110,492 97,152 96,048 92,736 0.00
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
CONS
UMPT
ION
IN K
L
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
110000
120000
COST
IN R
S
Lead Facility Services Globally
SLA for AC
Location Floors Recorded SLA % Achieved1st floor 23.4 23 +/- 1 100%
2nd floor 23.4 23 +/- 1 100%
3rd floor 23.4 23 +/- 1 100%
4th floor 23.4 23 +/- 1 100%
5th floor 23.4 23 +/- 1 100%
6th floor 23.5 23 +/- 1 100%
7th floor 23.5 23 +/- 1 100%
1st floor 23.4 23 +/- 1 100%
2nd floor 23.3 23 +/- 1 100%
3rd floor 23.4 23 +/- 1 100%
Ph
ase
1P
ha
se 2
Lead Facility Services Globally
Power cut details
FROM TO
1 14.08.08 11.30 11.45 0.15 min
4 14.08.08 15.40 17.40 2 Hrs
5 18.08.08 6.00 23.00 17 Hrs TNEB Shutdown
POWER CUT DETAILS FOR AUGUST 2008
REASONSL.NO DATEPOWER CUT TOTAL
HOURS
Lead Facility Services Globally
Concerns
Manholes to be closed at out gate and two wheeler parking area to avoid rats to enter inside the building.
Non veg. counter partition has to be rectified as it is so weak at phase 1 and 2 cafeterias.
Fire hydrant points to be rectified at the outer area.
Street lights has to be serviced.
Phase 2 sliding door sensors to be rectified.
Lead Facility Services Globally
September Month plan
Pedestrian painting to be done.
DG battery stand to be made.
Chiller snag work to be completed.
Workstation tables deep cleaning to be done.
Polishing of all floors lift landing and lobby floors.
Deep pest control treatment.
Technical
House Keeping
Pest Control
Lead Facility Services Globally
Help Needed
Civil work pending for a long time from CDS (e.g. Wall cracks, Manhole closing, Fire hydrant rectifications, Stair case skirting fixing etc….).
Evacuation plan for PRN facility required.
Need approval for polishing floors at lobby and all lift landing areas.
Steel rack for Engineering store. All DG roof gap (near exhaust pipeline) needs to be closed,
DG snag to be rectified.
1. All DG Silencers painting to be done.
2. Lubricant oil drain cock leaks to be arrested.
3. DG –No:2 door hinges got damaged needs to be fixed.
Lead Facility Services Globally
Helpdesk Call Summary Received for August 08
Description Received Closed PendingAC 150 150 0
Carpentry 4 4 0
Electrical 24 24 0
HK 7 7 0
Plumbing 0 0 0
Others 0 0 0
Total 185 185 0
RequestDescription Received Closed Pending
AC 10 10 0
Carpentry 5 5 0
Electrical 0 0 0
HK 3 3 0
Plumbing 1 1 0
Others 2 2 0
Total 21 21 0
Complaints
Lead Facility Services Globally
Helpdesk Call Summary
Requests Complaints
Lead Facility Services Globally
Thank You