“Design/Build Reduces

Project Schedule 33%” Construction Industry Institute

Anheuser Busch

VSA/Multifoods

IBP

Burkhardt Distributing

“Design/Build Reduces Project Cost by 6%”

Construction Industry Institute

Euclid Beverage

Marcy Distribution

J.J. Taylor

VSA/Multifoods

IBP

IBP

US FoodService

North Florida Sales

A & B Distributors

IBP

“Design/Build Improves Project Quality”