Committed to Delivery and Sustainable Development
PDO MEDIA BRIEFMarch 3rd 2014
Ministry of Oil and Gas
Our Vision Our Vision
Strategic Priorities “Stay the Course”
Top Quartile ultimate recovery & EOR
Unconventionals
Lean & continuous business improvement
In-country value commitment
STRATEGIC PRIORITIES
Increasing complexity
Creamed plays
Regional gas shortfall
Regional competition
Commodity costs
Local Employment
CHALLENGES RESPONSES
• 10 year oil production plateau of 550,000+ bbls/d
• Reserves and scope replacement ratios >1
• Support government gas demand & strong revenue generation
• Sustainability and HSE
• Development of Omani talent & businesses
Safety in Everything We Do
Lost Time Injury Frequency
Total Recordable Case Frequency
TRCF LTIF
0
0.2
0.4
0.6
0.8
1
0
1
2
3
4
5
2006 2007 2008 2009 2010 2011 2012 2013
Re-defining the “Home Commute”
Over 170 mln manhours of exposure
525
550
575
2009 2010 2011 2012 2013
2013: A Record Production YearProduction (kboe/d)
-
250
500
750
1,000
1,250
1,500
1967 1969 1971 1973 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 2013 2015 2017
2013 Production: 1,254 mln boe/d• Black oil: 569.7 kb/d• Condensate: 85.9 kb/d• Non-Associated Gas: 510.7 kboe/d• Associated Gas: 87.7 kboe/d
550
Oil Production (kbbl/d) Non Associated Gas Production (mln m3/d)
Associated Gas
Non Associated Gas
Condensate
Black Oil
60
70
80
2009 2010 2011 2012 2013
PDO Project Funnel
HaburTAGOGD
KarimW.WF
Fahud EOR
Greater BirbaMGI & EOR
NimrG WF
Yibal ShuaibaEOR
Amal SEThermal
DG 2DG 3
DG 4 / FID
DG 1
Exploration Depletion
Nimr BInfill
Al GubarCold GOGD
GN TAGOGD
Karim WestPolymer
AGS EOR
GreaterTaliah
MafraqTAGOGD
Habhab(Pilot)
TibrWF
Al BurjAK
Haima WestPoly
Habhab EOR
Nimr PolymerFull-Field
ExplorationWater-Flood
AqeeqWF Amin Stm
(pilot)
RHIP
Nimr ARedevelop
YibalAttic
MarmulAK ASP
Conventional EORSour
Al Noor MGIPh. 3A
Rima EOR
NimrGharif Rim
EOR
Al NoorMGI
Recovery
Harweel 2AB
MML ASP(pilot)
AmalSteam
HarweelPhase 3
ThayfutPolymer
Greater RimaDev.
YibalKhuff
AminEOR
Dafiq
Nimr Poly.(pilot)
BudourNE WF
AmalSteam Ph.2
GN GOGD
MarmulAK Poly
Ph.3
AminEORFlank
Saih RawlPolymer
QASlate-life
AGEOR
Amal2nd Cogen
Amal Solar(pilot)
(Key Projects)
AminInfill & WF
Haima WestWF
Burhaan
LekhwairUpper Shuaiba
Hanya
Lek DME(pilot)
Al Noor MGIPhase 3B
Operate
SOLAR STEAM TRIAL – AMAL WEST• First solar steam produced on
December 12 2012
• Over 1 year operation, produced 13,000 tons steam saving:
• 1 mln m3 of fuel gas
• 1,800 tons CO2 emissions
• Phase 2 scope progressing (incl. ICV)
Leadership in Environmental Sustainability
• Successful reed bed treatment of up to 660,000 bbls/d produced water. Expansion underway to 720,000 bbls/d by mid year
• Covers an area of 10.5 km2
• 98% reduced energy requirements and GHG emissions
• Creation of an eco-system with over 100 species of birds and fish
• Winner of 10 national and international awards
REED BEDS – PRODUCED WATER TREATMENT
Phase 1
Phase 2
Productivity increase:-60%: Frac unit moves (from 5.5 to 2 days )
-83%: Permit To Work validation (from 90to 15 mins)
Cost savings and cost avoidance:-45%: Well Chemical Consumption
(~US$2.35mln saving /year – Nimr)
Inventory reduction-70%: Local Spares Inventory reduction(~US$1 mln saving - Marmul)
WRM Production gainsGas Lift - Early Breakthrough System: Rapidresponse yields production gains
LEAN – “Doing more with what we have”
4000
5000
6000
2011 2012 2013
People make it happen
Well engineering is staffing up
Resourcing the Business
• 827 Omanis recruited, incl. Graduates and Tops
• 220 young Omanis joined the Technician Omanisation Programme (TOP)
• 712 Scholarships (home and abroad)
• ADIPEC Award: Empowerment of Women
(Omanis)
(Round 1, 2 & CWI Graduates)
0
20
40
60
80
100
120
2007 2008 2009 2010 2011 2012 2013
Graduates
TOPs
ICV: Delivering Training & Employment
> 10,000 Jobs and
Opportunities
0
5000
10000
2011 2012 2013
Social Investment Projects 2013
13 major projects completed
8 MoUs:
• Darsait breakwater• Pottery workshop• Livestock-Al-Jazer• 3 Majlises-Shaleem• Multi-purpose Hall-Ibri• Camel race track-Ghaba• Vet Clinic-Hamra Duru• Bus for elderly friends
600 beneficiaries from water haulage program
570km graded roads in the community
Completed the socio-economic study of the
concession area
GCC Ministerial Council Award in social programmes
2013: A Landmark Year New safety and production records
Robust reserves additionsPromising unconventional oil and tight gas opportunities
New milestones in project delivery and asset integrityStep changes in In-Country Value and business efficiency
Ramped up social investment programme
PDO Managing Director’s Committee
top related