Internal Use Only – Do not distribute

Corrosion

Under

Insulation

Present by : Patiphon Suksawat

Loop steam drum

Internal Use Only – Do not distribute

Contents

Introduction

Organization

How to Implement CUI ?

My Inspiration

My gain

Internal Use Only – Do not distribute

Patiphon Suksawat

Wasan Cheeppensuk Atip Nualnet

Komsan Bangkrut Nawa Bunsayang Narong Sakulprasitsiri

ORGANIZATION

Leader

Consultant

CUI team

Internal Use Only – Do not distribute

- CUI is a particularly severe form of localized corrosion that has been plaguing chemical process industries since the energy crisis of the 1970s forced plant designers to include much more insulation in their designs.

- Intruding water is the key problem in CUI. Special care must be taken during design not to promote corrosion by permitting water to enter a system either directly or indirectly by capillary action.

What is CUI (Corrosion Under Insulation) ?

Internal Use Only – Do not distribute

External damage

Carbon steels orlow alloy steels

Stainlesssteels

Subject to thinningSubject to stress corrosion cracking

What is CUI (Corrosion Under Insulation) ?

Internal Use Only – Do not distribute

• CUI is the mainly problem in petrochemical plant.

• Current Inspection Program is not consider corrosion under insulation problem.

• Increase Reliability of Plant.

Reference TPE

Internal Use Only – Do not distribute

Study CUI Theory From API 581, 570

Make Inspection Guide Line (Check Sheet)

Select Loop To Implement CUI

List up EQ and Collection Data

Risk Evaluation and Identification

Inspection ( Visual and Ultrasonic Testing)

Conclusion and Future action Plan

Internal Use Only – Do not distribute

Schedule

Internal Use Only – Do not distribute

1. Carbon steel piping systems, including those insulated operating between (–5°C to 175°C).

2. Austenitic stainless steel piping systems operating between (50°C–150°C).

Insulated Piping Systems Susceptible to CUI

Internal Use Only – Do not distribute

Flange Tee

Valve

Common Locations on Piping Systems Susceptible to CUI

Internal Use Only – Do not distribute Support pointInsulation has deteriorated

Vent

Common Locations on Piping Systems Susceptible to CUI

Internal Use Only – Do not distribute - 12 -

Insulated equipment or line work

Do not consider CUI

Do CUI for Carbon Steel

Do CUI for

Stainless Steel

Constant

-5 C< T < 175 C

Material Carbon or

Low alloy steel

Guide Line for CUI inspection

No

No

Yes

Yes

Internal Use Only – Do not distribute - 13 -

Check Sheet

Internal Use Only – Do not distribute

PE-302

PE-502

PM-500 A,B

PD-1205

TA-203A

TD-1203

TD-1201

TD-1210

TE-201

Loop steam drum

Internal Use Only – Do not distribute - 15 -

No. Line No.

1 10BW-0201-4B-3P2-H3-17K

2 10BW-0202-4B-3P2-H3-17K

3 10BW-0203-2B-1P2-H3-13.5K

4 10BW-0205-3B-P2(1S1(V))-H2-5K

5 10BW-0208-6B-1P2-H3-13.5K

6 10BW-0209-6B-1P2-H3-13.5K

7 10S-0006-4B-1P2-H3-13.5K

8 10SC-0001-6B-1S1(V)-H3-13.5K

9 10SC-0002-4B-1P2-H3-13.5K

10 1BW-0201-6B-P2-H-9.5K

11 1BW-0202-6B-P2-H-9.5K

12 1BW-0203-1.5B-1S1(V)-H-5K

13 1BW-0205-2B-P2-H-9.5K

14 1BW-0206-3B-P2-H-9.5K

15 1BW-0210-6B-P2-H-5K

16 1BW-0211-8B-P2-H-5K

17 1BW-0212-8B-P2-H-5K

18 1BW-2202-4B-P2-H-5K

19 1S-0001-4B-P2-H-5K

20 1S-0005-6B-P2-H-5K

No. Line No.

21 1S-0201-2B-P2

22 1S-0202-1.5B-P2

23 1S-0203-2B-P2

24 1S-0205-3B-P2

25 25SC-0001-6B-3P2-H3-28.5K

26 25SC-0001-6B-3S1-H3-28.5K

27 25SC-0004-6B-3S1-H3-28.5K

28 3BW-0201-3B-1P2-H2-13.5K

29 3BW-0202-3B-1P2-H2-13.5K

30 3BW-0203-1B-1S1(V)-H2-5K

31 3BW-0203-1B-P2-H2-5K

32 3BW-0204-3B-P2-H2-5K

33 3BW-0204-4B-PS(1S1(V))-H2-5K

34 3BW-0205-3B-P2-H2-5K

35 3S-0001-12B-P2-H2-5K

36 3S-0009-4B-P2-H2-5K

37 3SC-0008-8B-1S1(V)-H2-5K

38 3SC-0202-3B-P2(1S1(V))-H2-5K

39 3SC-5502-4B-P2-H2-5K

40 LPW-0001-3B-1S1(J)-H-13.5K

List up Equipment

Internal Use Only – Do not distribute - 16 -

List up Equipment

No. Line No.

4 10BW-0205-3B-P2(1S1(V))-H2-5K

8 10SC-0001-6B-1S1(V)-H3-13.5K

10 1BW-0201-6B-P2-H-9.5K

11 1BW-0202-6B-P2-H-9.5K

12 1BW-0203-1.5B-1S1(V)-H-5K

13 1BW-0205-2B-P2-H-9.5K

14 1BW-0206-3B-P2-H-9.5K

15 1BW-0210-6B-P2-H-5K

16 1BW-0211-8B-P2-H-5K

17 1BW-0212-8B-P2-H-5K

18 1BW-2202-4B-P2-H-5K

19 1S-0001-4B-P2-H-5K

20 1S-0005-6B-P2-H-5K

No. Line No.

26 25SC-0001-6B-3S1-H3-28.5K

27 25SC-0004-6B-3S1-H3-28.5K

30 3BW-0203-1B-1S1(V)-H2-5K

33 3BW-0204-4B-PS(1S1(V))-H2-5K

37 3SC-0008-8B-1S1(V)-H2-5K

38 3SC-0202-3B-P2(1S1(V))-H2-5K

40 LPW-0001-3B-1S1(J)-H-13.5K

Internal Use Only – Do not distribute

Collection Data

Internal Use Only – Do not distribute

Collection Data

Internal Use Only – Do not distribute

Collection Data

Internal Use Only – Do not distribute - 20 -

Consequence class

1 2 3 4 5

Economics

No / SlightDamage

< 0.4 M฿

MinorDamage

0.4 – 4 M฿

LocalDamage

4 – 40 M฿

MajorDamage

40 – 400 M฿

ExtensiveDamage

> 400 M฿Health & Safe

No / SlightInjury

Minor Injury Major Injury Single InjuryMultiple

Injury

EnvironmentNo / Slight

effectMinoreffect

Localizedeffect

Majoreffect

Massiveeffect

Consequence of failure rating

Example

Select 3

1S-0001-4B-P2-H-5K

Internal Use Only – Do not distribute

PointOperating

Temperature

Initial Coating Status

Insulation TypeWall thickness surface feature

Internal corrosion / erosion rate

External coil / Steam tracing

External environment

0> 175 0C

Or < -5 0C

Full QA paint protection

Negligible Not present Inside Building

1 150 – 175 0C

Perlite Foamglass Closed cellFoam (right

type)

>7.1 mmLow

( < 0.1 mm/y)High Integrity

design

Rarely wetted (<10% of the

time)

3-5 – 50 0C

or 120 – 150 0C

Normal QA paint

protection field weld at construction

FiberglassCal Sil,

AsbestosMineral Rock

wool

4 – 7.1 mm or surface location of penetrations

through insulation

Medium (0.1-0.4 mm/y)

Medium Integrity design

Intermittently wetted (~40% of

the time)

5 50 – 120 0CUnpainted or

Unknown

< 4 mm or surface at location of

reinforcement ring & other water traps

High( >0.4 mm/y)

Low Integrity design

Permanently wetted (e.g.

condensation, cooling tower dripping water

Probability Score Table of Carbon Steel

score

5+5+1+1+1+0+1 = 14Example

Internal Use Only – Do not distribute - 22 -

Points Operating Temperature

Initial Coating Status Insulation Type External coil /

Steam tracingExternal

environment

0Constantly > 150 0C or Constantly

< 50 0C

Full QA paint protection

Low chloride insulation material

(<10 ppm Cl-)Not present Inside Building

2 High Integrity design

Rarely wetted (<10% of the

time)

4 120 – 150 0C

Normal QA paint protection field

weld at construction

Medium Integrity design

Permanently wetted (e.g.

condensation, cooling tower dripping water

7 50 – 120 0C Unpainted or Unknown

Higher chloride insulation material

(>10 ppm Cl-)

Low Integrity design

Intermittently wetted (~40% of

the time)

Probability Score Table of Stainless Steel

score

Internal Use Only – Do not distribute - 23 -

CUI Criticality ranking

Example

Internal Use Only – Do not distribute - 24 -

CUI Confidence Questions Yes Interm NOCladding and Insulation conditions

+1 0 -1-Cladding/Insulation fully maintained : Yes-Cladding/Insulation normal : Interm-Cladding/Insulation in poor condition : NO

Multiple reliable inspections for CUI have been carried been carried out

+1 0 -1-Frequent inspection and selective delagly fallowed by appropriate remedial action : Yes

-Inspection irregular / not standard : Interm- No proper inspections : No

Monitoring CUI promoting condition

+1 0 -1

- The pressure of all possible CUI promoting condition (see susceptibility categories) has been established and quantified : Yes

- The operating temperature is monitored and constantly in identified rouge and coating condition is know / established : Interm

- The operating temperature is not established or the coating condition is not know : No

CUI Confidence rating

0 -1 + 0 = - 1

Examplescore

Internal Use Only – Do not distribute - 25 -

Strategy Matrix for Carbon Steel

Example

Strategy 3

Internal Use Only – Do not distribute - 26 -

Strategy Matrix for Stainless Steel

Internal Use Only – Do not distribute

Strategies for Carbon steel

Internal Use Only – Do not distribute

Strategies for Carbon steel

Internal Use Only – Do not distribute

Strategies for Stainless Steel

Internal Use Only – Do not distribute

Strategy 3

100 % NDE and delegging of all susceptible area within 6 years

Delegging of susceptible within 6

years

Delag 100% within 1 year

Delag more selective area

Within 1 year

Repair and Paint

Piping > 8 in

Significant CUI found

Significant CUI found

100 % delegging , repair and paint within 1 year

Adjust confidence with +1

Yes

Yes

Yes

No

No

No

Every 6 years

Every 6 years

Strategy flowchart

Internal Use Only – Do not distribute

Consequence of failure rating

Probability Score Table

CUI Confidence rating

CUI Criticality ranking

Strategy Matrix

Risk Evaluation and Identification

Internal Use Only – Do not distribute

30%

20%

50%

CUI Criticality ranking

Medium HighMedium Noinspection

Internal Use Only – Do not distribute

33%

18%

50%

Strategy Matrix

Strategy 3Strategy 2No inspection

Internal Use Only – Do not distribute

10BW–0203-2B-1P2-H3-13.5K

Inspection

Internal Use Only – Do not distribute

10BW–0205-3B-1S1(V)-H2

Inspection

Internal Use Only – Do not distribute

1BW–0203-1.5B-1S1(V)-H

Inspection

Internal Use Only – Do not distribute

1BW–0201-6B-P2-H

Inspection

Internal Use Only – Do not distribute

1BW–0211-8B-P2-H

Inspection

Internal Use Only – Do not distribute

1BW–0212-8B-P2-H

Inspection

Internal Use Only – Do not distribute

25SC-0004-6B-3S1-H3

Inspection

Internal Use Only – Do not distribute

1S-0001-4B-P2-H

Inspection

Internal Use Only – Do not distribute

Strategy 3

100 % NDE and delegging of all susceptible area within 6 years

Delegging of susceptible within 6

years

Delag 100% within 1 year

Delag more selective area

Within 1 year

Repair and Paint

Piping > 8 in

Significant CUI found

Significant CUI found

100 % delegging , repair and paint within 1 year

Adjust confidence with +1

Yes

Yes

Yes

No

No

No

Every 6 years

Every 6 years

Strategy flowchart1S-0001-4B-P2-H-5K

Internal Use Only – Do not distribute

Inspection

Internal Use Only – Do not distribute

Risk management

Corrosion

Think of module

Friendship

Internal Use Only – Do not distribute

Thank You