Presentation of CPU-VK Partnership for Healthcare facilities

TRANSCRIPT

Lisboa, 22 Feb 2011

Joint forces for global welfare

Lisboa, 22 Feb 2011

Lisboa, 22 Feb 2011

VALUE BY DESIGN

Lisboa, 22 Feb 2011

MARKETS

Healthcare (A&E)

INTERNATIONAL FACTS & FIGURES

56 years of knowhow

200 professionals in Belgium

VK Astana: 30 professionals in Kazakstan

start-up local Vietnamese office

start-up local Russian office

multidisciplinary approach

pioneering in sustainable buildings

joint operations in Portugal with CPU

V K

Lisboa, 22 Feb 2011

V K W O R L D W I D E

Lisboa, 22 Feb 2011

CORE BUSINESS

Mission• architecture (healthcare)• masterplanning (healthcare)• reconversion / renovation• extension• new construction

Services• masterplanning• building services• civil & structural engineering• infrastructural studies• landscape design• industrial design

Sustainability• material lifecycle• energetical building behaviour• building simulation (CFD)• termal energy system• natural ventilation• concrete core activation

Lisboa, 22 Feb 2011

HEALTHCARE

Lisboa, 22 Feb 2011

Onze-Lieve-Vrouw Hospital, Aalst

� partnership OLV – VK since 1986� masterplanning (1995 - 2015)� extension of 45.000 m²� underground parking: 30.000m²

Lisboa, 22 Feb 2011

Onze-Lieve-Vrouw Hospital, Aalst

Lisboa, 22 Feb 2011

Military Hospital, BrusselsEuropean Reference center – Burns Unit

� heavy renovation� individual units: high & medium

care, low risk � period: 2008-2009

Lisboa, 22 Feb 2011

Military Hospital, Neder-over-HeembeekEuropean Reference center – Burns Unit

Lisboa, 22 Feb 2011

General Hospital Sint-Maarten, Mechelen

105,000sqm 105,000sqm -- 722 beds 722 beds -- on goingon going

� joining 3 campuses into one� clear separation of

hospitalisation and ambulant activities, of chronic and acute patients

� modular grid of 8,40m : compactness + maximum daylight

Lisboa, 22 Feb 2011

General Hospital Sint-Maarten, Mechelen

105,000sqm 105,000sqm -- 722 beds 722 beds -- on goingon going

Lisboa, 22 Feb 2011

General Hospital General Hospital HeiligHeilig HartHart,, RoeselareRoeselare

� new hospital� > 700 beds� 110.000 m²� under study

clear concept that matches strategic ambitions of the hospital:

• “central street” for circulation• pathological clustering • caring floors per cluster• structural grid of 8,10m• hotfloor concentrated on 1 level• standardised nursing units• exchangeability of day care and out-patientareas

Lisboa, 22 Feb 2011

General Hospital Heilig Hart, Roeselare

� steplike front in brick : timelessand peaceful appearance

� strict rhythm of facades due to extreme internal flexibility : possibility of internal wallsevery 135 cm

� maximum glazing of facades : vista’s + orientation722 beds 722 beds –– on goingon going

Lisboa, 22 Feb 2011

University Hospital Center Esneux, Liège

40 beds 40 beds -- 20102010

� revalidation center : hospitalisation, hydrotherapyand consultations

� ample physio- therapy areas

Lisboa, 22 Feb 201140 beds 40 beds -- 20102010

University Hospital Center Esneux, Liège

Lisboa, 22 Feb 2011

University Hospital Center Esneux, Liège

Lisboa, 22 Feb 2011

General Hospital Sint-Jan, Brugge

several renovation assignments

1. the bed wing + nursing units : 2. medical-technical block with an

important addition : the P block3. supporting services : new emergency

services, laboratory, central kitchen, restaurant, pharmacy, …

4. technical renovation projects: absorption cooling, boiler room, filling station, new ICT-backbone and server farm.

Lisboa, 22 Feb 2011

General Hospital Sint-Jan, Brugge

Lisboa, 22 Feb 2011

General Hospital Sint-Jan, Brugge

Lisboa, 22 Feb 2011

University Hospital, Brussels

spatial plan with special focus on:� reorganisation flows� extension and reorganisation of

most medical services� period: 2009-2011

Lisboa, 22 Feb 2011

ECO City, Hanoi

Lisboa, 22 Feb 2011

ROYAL MATERNITY HOSPITAL, KINGDOM OF BAHRAIN

May 2010

Royal Maternity, Bahrein

Lisboa, 22 Feb 2011

ROYAL MATERNITY HOSPITAL, KINGDOM OF BAHRAIN

May 2010

Royal Maternity, Bahrein

Lisboa, 22 Feb 2011

Pediatric Hospital Nha Thrang, Vietnam

Lisboa, 22 Feb 2011

SUSTAINABLE DNA

Recently VK has been officially acknowledged as 'BREEAM Assessor'. The international label proves the continuousefforts and the pioneering work that has been deliveredby VK in the domain of sustainable building. VK willcontinue to deliver its customers state-of-the art technology and engineering.

“Sustainable design provides for the demands of todaywhilst protecting the ability of future generations

to meet their own needs.”

(UN-Brundtland Report – 1987)

Lisboa, 22 Feb 2011

OBJECTIVATING SUSTAINABILITY THROUGH FIRST CLASS PROJECTS

International licensing standards for sustainable building taken into account by VK:

• BREEAM – UK

• HQE – FRANCE

• LEED – US

• DGNB – GERMANY (Deutsche Gesellschaft für Nachhaltiges Bauen)

• VALIDEO - SECO

water CO2 waste

energybio

diversity

resources enivronment

Lisboa, 22 Feb 2011

Natural ventilation

detailed CFD-simulations

INTEGRATED TECHNOLOGICAL CONCEPT FOR SUSTAINABILITY

Lisboa, 22 Feb 2011

HYBRID VENTILATION CONCEPT: each building is unique

INTEGRATED TECHNOLOGICAL CONCEPT FOR SUSTAINABILITY

Lisboa, 22 Feb 2011

CONCRETE CORE ACTIVATION

HEATING PRINCIPLE WHEN LOW TEMPERATURE

COOLING PRINCIPLE WHEN HIGH TEMPERATURE

INTEGRATED TECHNOLOGICAL CONCEPT FOR SUSTAINABILITY

Lisboa, 22 Feb 2011

INTEGRATED DESIGN AND EXECUTION

CONCRETE CORE ACTIVATION

INTEGRATED TECHNOLOGICAL CONCEPT FOR SUSTAINABILITY

Lisboa, 22 Feb 2011

Types:

Open source Vertical soilcollector Horizontal soilcollector

Geothermal Energy

INTEGRATED TECHNOLOGICAL CONCEPT FOR SUSTAINABILITY

Lisboa, 22 Feb 2011

INFRAX HEADQUARTERS, Torhoutlow energy office - WINNER 2020CHALLENGEWINNER 2020CHALLENGE

� architect: CBA� disciplines: civil & structural -

building services - infra� technological State-of-the-art� integration of techniques

- concrete core activation- hybrid ventilation concept- geothermal energy system- small footprint

Lisboa, 22 Feb 2011

Joint forces for global welfare

Av. 24 de Julho, 50

P - 1200-868 Lisboa

Portugal

T +351 21 39 39 000

F +351 21 39 39 061

E cpuplan@cpu.pt

Brugsesteenweg 210B – 8800 RoeselareBelgium

T +32 51 26 20 20

F +32 51 26 20 21

E info@vkgroup.be

top related