CT Energy & Technology, LLC presents
World’s largest renewable energy project utilizing Connecticut manufactured fuel cell technology
2
CT Energy & Technology, LLC Project & Development Team
A Diversified Services Construction Company
Wm. Corvo Consultants, Inc. Middletown, CT 860.346.6500 office 860.346.8183 cellular
Project permitting ,development and public relations consulting
3
CT Energy & Technology, LLC Project & Development Team
90 Statehouse Square, Hartford, CT 860.424.4300
A major Connecticut law firm able to provide comprehensive legal advice on all facets of development, permitting and administrative procedures.
Doyle, D’Amore & Balducci100 Lindbergh Drive, Hartford, CT 860.548.1421
A full service government relations, business development and communications consulting firm. Highly experienced in government, political and media relations. Specialists in advertising and marketing.
William “Jack” Sheehan
72 Sea Cliff Drive
Plymouth, Massachusetts
An energy and environmental finance firm specializing in project finance with experience in a wide array of technologies for the modern electric generation and transmission grid.
4
CT Energy & Technology, LLC Development Premise
CT Energy & Technology, LLC is a Connecticut based development company whose purpose is to develop energy projects which meet Connecticut’s goals for renewable energy, combined heat and power and distributed generation.
The Beacon Falls Energy Park is a project which meets our criteria and provides us with the opportunity to develop the largest renewable energy fuel cell project in the world using the most modern technology available.
The participants in CT Energy & Technology are all Connecticut based companies and the technology which we are proposing to use for the Beacon Falls Energy Park is also provided by a Connecticut company.
The value to the community of Beacon Falls includes substantial tax revenue, development of a former brownfield site and enhanced utility availability . The jobs and taxes when coupled with the cleanest renewable energy project of its type makes our development proposal a home run for Beacon Falls.
5
Beacon Falls Energy ParkPROJECT LOCATION
Beacon Falls- between Connecticut Route 8 and High Rock Road
6
Beacon Falls Energy ParkPROJECT LOCATION
Beacon Falls- between Connecticut Route 8 and High Rock Road
Property was formerly used as a sand and gravel mine. It has been restored several times but the open space is an attraction for off road vehicles and motor cycles.
7
Project topographyallows for development of the base load fuel cell project on a large bowl like parcel below an existing tree lined boundary.This reduces the view shed for our neighbors.
Beacon Falls Energy ParkPROJECT LOCATION
Beacon Falls- between Connecticut Route 8 and High Rock Road
8
Beacon Falls Energy ParkPROJECT LOCATION
Two photographic views of the property to be developed
9
Beacon Falls Energy ParkPROJECT DESIGN AND LAYOUT
Project is designed to have a low profile and be landscaped for minimum visibility. The fuel cell technology has no combustion and is very quiet.
10
Beacon Falls Energy ParkPROJECT DESIGN AND LAYOUT
Beacon Falls Substation project interconnection
11
Beacon Falls Energy ParkProject Design- Equipment
12
Beacon Falls Energy ParkProject Design- Equipment
13
Beacon Falls Energy ParkProject Design- Equipment ark
14
Beacon Falls Energy ParkProject Benefits
Beacon Falls’ Benefits:1) Economic Development benefits- large scale taxable project. Positive
impact on tax revenue2) Final project will have low visibility and sound profile3) World Class renewable energy project using clean Connecticut base
load fuel cell technology4) Reduced area emissions5) Positive economic benefit of jobs during development6) Development of former sand quarry - brownfield property7) Injection of energy into the Beacon Falls area that is physically
delivered to Connecticut electric users8) Project will provide enhanced natural gas availability to Beacon Falls
15
Beacon Falls Energy ParkProject Benefits
Benefits to Connecticut1) Cost effective, base load renewable energy2) Energy physically delivered to Connecticut consumers3) Reduced area emissions4) Jobs for Connecticut manufacturing and construction
companies5) Tax revenue from project development6) Improvement of electric grid reliability7) Improvement of natural gas distribution systems8) All Connecticut companies in development
top related