daaaovao ccty,ity, philipppp esines · manuel guinga matina aplaya crossing bayabas catalunan...
Post on 10-Nov-2018
219 Views
Preview:
TRANSCRIPT
City Wastewater: Performance
• 1 6 Million population!
!
!
!
!
!
!BUDA
TAPAK
MALAMBA
COLOSAS
BAGANIHAN
SALAPAWAN
DATU SALUMAY
1.6 Million population, • 244,000 hectares• Wastewater Coverage:
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!!
!!
!!
!!
!
!
!!
!
!!
!
!
!
!!
!
!
SALOYBANTOL
LACSON
LASANG
FATIMA
SUAWAN
MAPULA
LUMIAD
MALAMBA
SUMIMAO
DOMINGA
GUMITAN
MALAMBA
BUNAWAN
MABUHAY
LAMANAN
DACUDAO CALLAWA MAHAYAGPANGYAN
TAMUGAN
MARILOG
PAÑALUM
MALABOG
DALAGDAG
GATUNGAN
GUMALANG
SALAYSAY INAYANGAN
LAMPIANAO
PAQUIBATO
MAGSAYSAY
PANDAITAN
SAN ISIDRO
MEGKAWAYAN
DALAG LUMOT
PARADISE EMBAC
• Wastewater Coverage: Management services and facilities !
!
!
!
!
!
!
!!
!
!
!
!
!
!!
!
!
!
!!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
! !!
!
!!
!
!
!!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
ULASASA
WAAN
MA-A
BATOEDEN
AGDAO
TORIL
ILANG
WINES
SIRIB
DUMOY
MULIG
BUCANA
TUGBOK
TALOMO
BAGUIO
BALIOK
WANGAN
ACACIA
MANDUG
LANGUB
MINTAL
KILATE
LIZADA
CARMEN
CATIGAN
CALINANMALAGOS
CAWAYAN
ANGALAN
SUBASTA
MUDIANG
PANACAN
TIGATTO
MAGTUODTACUNAN
CAMANSI
LUBOGAN
TAGLUNO ALAMBRE
BAYABAS
SIRAWAN
BUHANGIN
COMMUNAL
GU G
TAGAKPAN
TIBUNGCO
INDANGAN
PAMPANGA
TAGURANO
TAMAYONG
CADALIAN
POBLACION
CABANTIAN
TALANDANG
RIVERSIDE
TUNGKALAN
MARAPANGI
TAMBOBONG
MANAMBULAN
BALENGAENG
LOS AMIGOS
NEW CARMEN
BAGO OSHIRO
MATINA BIAO
BAGO APLAYA
NEW DALIAON
TAWAN-TAWAN
BAGO GALLERA
TALOMO RIVER
NEW VALENCIA
BIAO GUIANGA
BIAO ESCUELA
MATINA PANGI
MANUEL GUINGA
MATINA APLAYA
CROSSING BAYABAS
CATALUNAN GRANDE
CATALUNAN PEQUEÑO
– No wastewater facilities except for large commercial establishments
! !! !!
BINUGAOTIBULOY
SIBULANATAN-AWE
BARACATAN
large commercial establishments – Most HH have septic tanks but most wastewater is drained towards natural and urban drainage systems
Wastewater Policy and Planning
• Existing Wastewater Policy– Existing City Sewerage and Septage Ordinance – IRR being formulated
– Monitoring of discharge natural waterways
• Existing Plans– 1994 WB study on Sanitation and Sewerage1994 WB study on Sanitation and Sewerage – No budget allocated for implementation– No master plan– No master plan
Focus Areas: WHAT ARE THE BARRIERS AND POTENTIALS?WHAT ARE THE BARRIERS AND POTENTIALS?
• Enabling Environment– Ordinance IRR still underway– Ordinance IRR still underway– Water Utility is interested in septage management to protect water quality– Water is a recognized development issue in the city
• Social Issues– significant percentage of urban dwellers live in informal settlements
• TechnologyTechnology– Lack of technical experts in the local government; strong CSO and academe
• Financingissue of willingness to pay of citizenshuge financial requirement needed
Action Planning Summary‐ How or what needs to be done to address the barriers
• Increasing environmental awareness of locals
• Develop relocation sites with wastewater facilities
Sit d l t di f i ti i f l ttl t• Site development or upgrading of existing informal settlements
• Develop appropriate and affordable technology at household, community and city level.community and city level.
• Upgrade capacity of local government technical personnel
• Collaborate with the Davao City Water District in investing in wastewater and septage treatment plants
‐ Davao City has a PPP ordinance
‐ master plan to address sewerage and septage issues
top related