david wyatt ceng mraes head of airworthiness (doa) caa / industry part145 airworthiness seminar 28...

Post on 21-Jan-2016

235 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

David Wyatt CEng MRAeSHead of Airworthiness (DOA)

CAA / Industry Part145 Airworthiness Seminar28th October 2015

Safety Management System (SMS): POA/DOA experience

SMS: POA/DOA experience

• Introduction to Gama’s POA/DOA

• Drivers for Gama’s POA/DOA

• SMS definitions and terminology

• SMS working documents

• SMS costs and benefits

2

Gama Aviation PLC

Global private aviation services company

Headquarters: Farnborough, UK

Business activities:• Charter• Management• Aviation Software• Maintenance• POA/DOA

• Facts and figures• 5 continents• 40+ global locations• 140+ aircraft • 1500+ people

3

Gama Aviation PLC

Global private aviation services company

Headquarters: Farnborough, UK

Business activities:• Charter• Management• Aviation Software• Maintenance• POA/DOA

• Facts and figures• 5 continents• 40+ global locations• 140+ aircraft • 1500+ people

4

Gama Aviation (Engineering) Ltd

5

Part 21 POA/DOAFairoaks Airport, Surrey UK• 5000 m2 • Hangars, workshops and offices• 50+ staff

GAEL approvals

• EASA Part 21(G) POA• EASA Part 21 (J) DOA• EASA Part 145• EASA Part M CAMO• MAA DAOS• ISO 9001 (BSI)• FAA Repair station• Government of Bermuda aircraft maintenance

6

GAEL approvals

• EASA Part 21(G) POA• EASA Part 21 (J) DOA• EASA Part 145• EASA Part M CAMO• MAA DAOS ….driver for SMS• ISO 9001 (BSI)• FAA Repair station• Government of Bermuda aircraft maintenance

7

SMS drivers for Part 21

ICAO Annex 19 requirement.....

• EASA, CAA, FAA, ........Rest of World

• EASA RMT 0262, 0611, 0550 & 0612

• Phased programme: RMT, NPA, CRD etc

8

SMS drivers for Gama’s DOA

MAA* requirement

• DAOS* (Gama DOA now fully approved)

• DOA assessment (May 2012); “please explain your...”

• Safety policy?

• Hazard log?

• Top five risks?

• Safety culture????? = Major audit finding

*Military Aviation Authority, Design Approval Organization Scheme

9

Definitions and terminology

1. Safety

2. Accidents

3. Incidents

4. Reactive QA system

5. Proactive SMS

6. Accident Pyramid

7. Safety culture

10

SMS in simple terms.....

1. Safety

2. Accidents

3. Incidents

4. Reactive QA system: what went wrong?

5. Proactive SMS: what could go wrong?

6. Accident Pyramid

7. Safety culture

11

“Safety”

• CAA: “Safety is no accident”

• EASA: “Your safety is our mission”

• MAA: “Air Safety is the state of freedom from unacceptable risk of injury to persons, or damage, throughout the life cycle of military air systems”.

• ICAO: “The state in which the risk of harm to persons or property is reduced to, and maintained at or below, an acceptable level through a continuing process of hazard identification and risk management”.

12

Accident

An undesired event, leading to harm or loss to:

• Property

• Environment

• Business

• People

13

Incidents & occurrences

Incident: where an accident nearly occurred

Occurrence: something that could lead to an incident

14

Accident pyramid

15

Accidents result from incidents and occurrences

Accidents and incidents are outcomes… ...arising from occurrences

Accidents

Incidents

Occurrences

1

30

300

Reactive QA system

• What went wrong?

• Establish the root cause

• Could something like this happen again?

• Develop preventative action

• Blame/ punitive action

16

Reactive QA system

Hindsight…

“....an accident waiting to happen...”“…I could see that happening here…”

17

Proactive SMS

• Flying is not inherently safe, but ..........

• .........needs to be as safe as reasonably practical

• Risk likelihood vs. severity

• Chain of events will lead to accidents

• Incidents are precursors of accidents

• Safety culture

18

Safety culture

• Applies to all personnel and all activities of an organization

• Integrated in the organisation’s existing management system

• “See something/ say something”

• Collect and manage data

• Promote safety

• “Just” culture

19

GAEL SMS documents

• Management System Manual (company)

• Occurrence report and log (company)

• Key performance indicators (company)

• Error management log (design)

20

Hazard and error logs

ICAO 9859 strategies for a safety culture• Trying to find troubleNot just waiting for it to show up

• Predictive safety data capture systemsAggressively seek safety informationMay be indicative of emerging safety risks Derived from a variety of sources

21

SMS software tools

Commercially available software tools that automate: • Hazard reporting• Risk management processes • Safety promotion activities• .... and much more

22

Costs and benefits

Costs of collecting/ managing data offset by reduction in costs caused by harm or loss to:

•Business: reputation, lost customer(s), warranty claims

•People: person injured = loss of earnings, overtime etc

•Property: repairs, insurance claims

•Environment: fines

23

My final SMS messages..........

SMS culture = Proactive (≠ reactive)

SMS = “System of systems”

SMS = Business tool (≠ another layer of regulation)

David Wyatt CEng MRAeSHead of Airworthiness (DOA)

Gama Aviation (Engineering) Ltd

24

top related