Day 3 ENB Growth

TRANSCRIPT

eNodeB Growth

Agenda: Day 3

Background Introduction of VLAN

Understanding ODD

eNodeB Growth

Software Loading from LSM

Parameter Configuration

Cell Management

Neighbor Management

SON Management

eNodeB Activation

System Check

VLAN

LSM

SAE

MME

eNodeB

MPLS Backhaul

PHY

VLAN103

VLAN102

VLAN101

OM IP

Bearer IP

Signaling IP

BH2 5x

VLAN (Continued)

VLAN ID 1

VLAN ID 2

VLAN ID 3

UNASSIGNED PORT (VLAN ID 0)

HYBRID PORT

TRUNK PORT

L2 Switch L2 Switch

eNB Growth Process

eNB Growth

SOLPAR needs to commission the eNB

OM IP and VLAN ID 103 and NE ID Need to be commissioned

Boot Mode is set to STATIC

Factory commissioned. SOLPAR needs to commission

Just need to Plug to Backhaul and power up

Boot Mode is set to be DHCP

eNB Growth & Commissioning

Non Plug & Play (Non PnP) Plug & Play (PnP)

Samsung eNodeB Self-Establishment

eNodeB

SAE GW

MME

DHCP LSM

Backhaul Network

1) Acquire eNB & LSM IP from DHCP server

2) Acquire configuration from LSM

3) Configure VLAN’s for a) S1-C b)S1-U & X2

eNodeB

Samsung eNodeB Self-Establishment (Continued)

eNodeB

SAE GW

MME

DHCP LSM

Backhaul Network

4) Establish S1-MME

eNodeB

6) Establish X2

eNB Growth - High-level Process

Understanding ODD

Software loading from LSM

Parameter Configuration

eNB activation (Changing eNB

status to In-Service)

Steps in System Growth Process

• System Basic information Step 1

• External Links (Backhauls & UDEs) Step 2

• MME IP information Step 3

• Scheduler information Step 4

• MCE Info Step 5

• eNB Serial No. Step 6

• Cell Management Step 7

Steps in System Growth Process

• SON (Self Optimizing Networks) option Step 8

• Frequency Information Step 9

• Location Information Step 10

• Detailed Cell Information Step 11

• Finalizing Configurations Step 12

Step 1: System Basic Information

System basic information contains following data types (Refer ODD)

Group: Select particular group in Tree viewer

NE Type: Select "MACRO OUT0OOR 01ST"

NE Version: Select "2.0.0"

NE ID: NE 10 of eNB

Name: Site name of eNB

Serial No.: Serial number of UAMA

Smart Cell: Select "TYPE_E"

MCC: MCC value of eNB

MNC: MNC value of eNB

Cell ID: Cell ID MSB 4-bits value of 0 to F according to site type.

Latitude: GPS information

Longitude: GPS information type

Entering System Basic Information

To start growing the system, click Grow eNB on the AceMan LSM menu.

Then enter the information as per ODD

Click Next

Fields for System Basic Information

Following Data types need to be configured

IF Name: ge_O_O_Port# or ge_O_O_Port#.vLAN ID

IP version: Select IPv6

IP Address: IP address according to interface

IP Pfx Len: Prefix value of IP address

OAM: Select ON if you want to use this interface for OAM.

LTE_SIGNAL_S1: Select ON if you want to use this interface for S1 signal.

LTE_SIGNAL_X2: Select ON if you want to use this interface for X2 signal.

LTE_BEARER: Select ON if you want to use this interface for Bearer traffic.

LTE_BEARER_M1: Select ON if you want to use this interface for eMBMS M1.

Click Next

Step 2: Configuring External Links

Select the external Port No. for Backhaul and UDE in the check box and click N/W Data button

Click Next

Step 2: Configuring External Links (Continued)

ADD LSM route with CSS as gateway in route table shown below.

Click Next Click the Apply button

Step 3: MME IP Information

In the MME IP information select as below.

IP Type: IPV6

IP Address: S1AP IP Address of MME (from ODD)

Click Next

Step 4: Scheduler Info

Enter the information of Smart Scheduler as below

- Scheduler Type: Select SCHEDULER

- Smart Type: Select CLUSTER

- NRT Scheduler ID: Smart Scheduler NE ID

- IP version: Select IPv6

- IP Address: Service (XE Interface) IP address of Smart Scheduler

Click Next

Step 5: MCE Info

Enter the M2 IP address information of MCE as below,

- IP version: Select IPv6

- IP Address: M2 IP address of MCE

Click Next

Step 6: eNB Serial Number

Enter correct value from field or check other eNB with same serial no's in Serial No. of System Basic Information like below.

Enter eNB Serial No.

Step 7: Cell Management

Step 7a): Click box of Cell #0 and then click box of SubCell (dsp#0 /0) as below.

Step 7b): Click box of Cell #1 and then click box of SubCell (dsp#1 /2) as below.

Remark: If you click the cell, this box color will be changed from white to pink. And you can see "0" in Subcell box.

Remark: If you click the cell, this box color will be changed from white to pink. And you can see "1" in Subcell box.

Step 7: Cell Management (Continued)

Step 7: Click box of Cell #0 and then click box of SubCell (dsp#0/2/4)

Note: If you click the cell, this box color will be changed from white to pink. And you can see "2" in SubCell box.

Step 8: SON Options

In SON options, We can configure 4 parameters as follows

Initial auto PCI Allocation

Initial Auto RACH Optimization

Initial NRT configuration

Initial SRS pool configuration

Step 8: SON Options - Initial Auto PCI Allocation

Select “Initial auto PCI Allocation” as shown below using SON Option menu

Selected Column in Detail Cell Information turns Gray (Disabled) from Yellow

Step 8: SON Options - Initial Auto RACH Optimization

Using RSI SON Option (Assign value of RSI automatically)

Selected Column in Detail Cell Information turns Gray (Disabled) from Yellow

Step 8: SON Options - Initial SRS Pool Configuration

Using SRS POOL Index SON Option (Assign index value of SRS pool automatically)

Selected Column in Detail Cell Information turns Gray (Disabled) from Yellow

Step 9: Frequency Information

Check the value of FrqBandInd whether value is 40 (correct value) or not.

Steps 10 & 11: Location & Detailed Cell Information

Input the GPS value (Latitude / Longitude / Height) of each cell.

Input the detail value of each cell as below

Diversity: Select "4Tx4Rx" Path: Select "A/B/C/D" TAC: Tracking Area Code value EAID: 0 (Emergency Area ID) HSF: Select "OFF" (High Speed Flag) ZCZC: 12 (Zero Correlation Zone Configuration)

Step 12: Finish Growth Operation

Finish Grow Options

eNB Growth - High-level Process

Understanding ODD

Software loading from LSM

Parameter configuration

eNB activation (Changing eNB

status to In-Service)

Software Loading from LSM

After grow eNB on LSM client, eNB starts PKG loading from LSM server. Once eNB finish PKG loading, eNB executes each processor.

Messages to be noted

eNB Growth - High-level Process

Understanding ODD

Software loading from LSM

Parameter configuration

eNB activation (Changing eNB

status to In-Service)

Set PCID of SON Function

1) Set the value of "PCID_ENABLE" from "sonFuncOff" to "sonAutoApply" 2) "CHG-SONFN- ENB" on [CLI] windows in LSM client 3) Execute the command

Check the value of "PCID_ENABLE" which is "sonAutoApply"

Set SRS of SON Function

1)Select CHG-SONFN-CELL

2) Select 0&&2

3) Select “SonAutoApply 4) Execute

MCE Parameters: Set MBMS Info Step 1

Step 2

Step 3

Step 4

MCE Parameters: Set ENBMCCH Step 1

Step 2

Step 3

Check Environment Information

Check whether new 3 environment information are added with "RTRV-ENV-INF" on CLI command in LSM client.

IPv6_ENABLE: 1 RS_IP: IP address of LSM NE_ID: NE_ID of eNB

Check Environment Information (Continued)

Change Boot Mode (Not Required for non-PnP)

Change BOOTMODE parameter to static once site is up.

Execute after selecting static

eNB Growth - High-level Process

Understanding ODD

Software loading from LSM

Parameter configuration

eNB activation (Changing eNB

status to In-Service)

Change eNB Status to In-Service

Step 1: System Activate Step 1: To unlock eNB, execute "Unlocked" in "Administrate State" menu after click right button of mouse on eNB what you want to change

Step2: To activate cell, select [Cell Management] menu on [Configuration] and then select whole Cells on the "Cell Management" window, and then execute "Unlocked" after click right

Step 2: Cell Activate

Change eNB Status to In-Service (Continued)

Step 3.1: Subcell Activate Step 3.1: To activate subcell, select whole Subcells on the "Cell Management" window, and then execute "Unlocked" after click right button of mouse.

Step 3.2: Check the "SERvICE OFF" alarm is clear

Step 3.2: Subcell Activate

Summary

eNB growth involves understanding ODD, loading the software from LSM-R, configuring parameters and activation of eNB

Appropriate bearers need to be switched on for the OAM, S1, and bearer

Enter MME IP information for the MME’s defined

Enter Scheduler and MCE information

SON definitions include initial PCI, RACH and SRS automation