DEDICATEDFREIGHT CORRIDOR

VJTI-MTech(Proj.Mgmt) /

Fall 2014

1

PROJECT MEMBERS

UNDER THE GUIDANCE:

Veermata Jijabai Technological Institute (VJTI)Mumbai, India

UNDER THE GUIDANCE:Prof. BALAJI RAMADURAI,PMP (balajir16@gmail.com)

SRUTHINAIR

sruthinair160@gmail.com

SWAPNILSACHDEV

swapnilsachdev911@gmail.com

HARSHADJOSHI

jharshad.1356@gmail.com

MASOOMDESHMUKH

masoomkhan.deshmukh@gmail.com

VJTI-MTech(Proj.Mgmt)/ Fall 2014

2

Dedicated Freight Corridor

The transportation of freight or goods through high speed railway linesdedicated for quick supply of goods across country and ports for export

Illustration

VJTI-MTech(Proj.Mgmt)/ Fall 2014

3

Freight Transportation ModeFreight Transportation Mode

AIRWAYS WATERWAYS

ROAD PIPIELINE

RAILWAYS

VJTI-MTech(Proj.Mgmt)/ Fall 2014

4

Contd…

Sources:RITES(2009)

Freight Traffic in Billion (2007-08)

VJTI-MTech(Proj.Mgmt)/ Fall 2014

5

INDIAN RAILWAYS• Indian railways benefit from freight transportation• In 1970’s, 70% freight transport on railways

30% on roadways• Current scenario, 30%- railways

70%- roadways

VJTI-MTech(Proj.Mgmt)/ Fall 2014

6

RAILWAYS v/s ROADS

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1950-51 1960-61 1970-71 1980-81 1990-91 2000-01 2007-08

RoadRail

Source: RITES (2009)

VJTI-MTech(Proj.Mgmt)/ Fall 2014

7

CONTD..

VJTI-MTech(Proj.Mgmt)/ Fall 2014

8

WHY DFC IS REQUIREDTo cope with increased freight traffic:

• To carry the same on existing network OR• Creation of a new passenger corridor OR• To go for separate freight corridor.

VJTI-MTech(Proj.Mgmt)/ Fall 2014

9

CONTD…

• First option of upgrading not convincing due to

-average freight speed is very low

-Heavy traffic density routes-Technical constraints-to overcome these constraints the cost incurred is very high

• Second option not feasible.

VJTI-MTech(Proj.Mgmt)/ Fall 2014

10

SALIENT FEATURES & DESIGN CONSIDERATIONSVJTI-MTech(Proj.Mgmt)/ Fall 2014

11

CONTD..VJTI-MTech(Proj.Mgmt)

/ Fall 2014

12

BENEFITS OF DEDICATED FREIGHTCORRIDOR• Contribution to economic development by freight

transportation

• Segregated electrified line for freight, parallel to theexisting railway line, allows the passenger trains to movefaster in the existing lines

• For industry, reduced unit cost of transportation as DFCprovides rail infrastructure to carry higher throughput pertrain

• Guaranteed, faster transit at an economic tariff

VJTI-MTech(Proj.Mgmt)/ Fall 2014

13

CONTD..

• Accelerate nation-wide economic development aswell as improve the environment

• Less energy consumed as compared to truck modeand avoided gas emissions

• Increase in employment opportunities of the region

• Improve and expand the market for agriculturalproduce, forestry and fisheries of the regions

VJTI-MTech(Proj.Mgmt)/ Fall 2014

14

WHAT IS INDUSTRIAL CORRIDOR?

• Development of the Industries along the transportCorridor to facilitate the movement of Goods fromthese industries.

• It is the iintegration between the industries and theinfrastructure

VJTI-MTech(Proj.Mgmt)/ Fall 2014

15

Selection Criteria for Investment Region:

To ensure at least one such node in each of the DMICState to spread the economic benefits;

• Benefit from the proximity to Metropolitan Areas asDelhi, Mumbai;

• Potential for Developing Greenfield Ports (or)Augmentation Possibilities;

• Easy Availability of such huge land parcels andestablished industrial base.

VJTI-MTech(Proj.Mgmt)/ Fall 2014

16

Selection Criteria for Industrial Area:

• To take advantage of inherent strengths of specificlocations (mineral resources, rich agriculture base,availability of skilled human resource base, potentialfor setting up specific group of industries, IT/ITESetc);

• Selection of suitable locations to ensure anopportunity to transform under-developed regionsalong the Corridor to Developing/ Well Developedregions.

VJTI-MTech(Proj.Mgmt)/ Fall 2014

17

INDUSTRIAL CORRIDORS IN INDIA

• Delhi - Mumbai

• Amritsar - Kolkata

• Mumbai - Bengaluru

• Chennai - Bengaluru

VJTI-MTech(Proj.Mgmt)/ Fall 2014

18

ESTIMATED TOTAL COST OF PROJECT

Source: JICA report

VJTI-MTech(Proj.Mgmt)/ Fall 2014

19

DELHI MUMBAI INDUSTRIAL CORRIDOR

States covered

1. Uttar Pradesh

2. Haryana

3. Rajasthan

4. Gujarat

5. Maharashtra

VJTI-MTech(Proj.Mgmt)/ Fall 2014

20

SHORTLISTED INVESTMENT REGION IN PHASE1SHORTLISTED IR

Dadri-Noida-Ghaziabad (U.P. ) General Manufacturing ;

Manesar-Bawal in Haryana Auto Component/ Automobile

Khushkhera-Bhiwadi-Neemrana inRajasthan

General Manufacturing/ Automobile/ AutoComponent

Pitampura-Dhar-Mhow in MadhyaPradesh

General Manufacturing

Bharuch-Dahej in Gujarat Petroleum, Chemical and Petro-Chemical

Igatpuri-Nashik-Sinnar in Maharashtra General Manufacturing

VJTI-MTech(Proj.Mgmt)/ Fall 2014

21

SHORTLISTED INVESTMENT AREA IN PHASE 1

Meerut-Muzaffarnagar in Uttar Pradesh Engineering/ Manufacturing

Faridabad-Palwal in Haryana Engineering & Manufacturing

Jaipur-Dausa in Rajasthan Marble/Leather/Textile

Nimach-Nayagaon in Madhya Pradesh Engineering/ Agro-Processing

Vadodara-Ankleshwar in Gujarat General Manufacturing

Dighi/Alewadi in Maharashtra. Greenfield Port

VJTI-MTech(Proj.Mgmt)/ Fall 2014

22

PROJECT COST AND FINANCING OF THEWESTERN CORRIDOR

VJTI-MTech(Proj.Mgmt)/ Fall 2014

23

DMIC in Maharashtra

• Node No.17:Dhule-Nardhana InvestmentRegion• Node No.18:Igatpuri-Nashik-SinnarInvestment Region• Node No.19:Pune-Khed Industrial Area• Node No.20:Industrial Area with GreenfieldPort at Dighi

VJTI-MTech(Proj.Mgmt)/ Fall 2014

24

Length of corridor: 930 km approx.

GENERALFEATURES

ofDMIC (inVadodara-Rewari)

Junction stations:10, crossing station:10

Major & Important bridges:207

Road over bridges:8

Alignment passed through: Gujarat,Haryana, Rajasthan

District involved:17, Villages covered: 451

Maximum Speed: 100 km/hr

VJTI-MTech(Proj.Mgmt)/ Fall 2014

25

Status of the Project: Land Acquisition - Being acquiredunder Railway Amendment Act (RAA) 2008 - (units inhectares)

Land to beacquired

Land Acquired

Eastern DFC 4807 3635 (75%)

Western DFC 5860 5039 (85%)

Total 10667 8673 (81%)

VJTI-MTech(Proj.Mgmt)/ Fall 2014

26

REHABILITATION ANDRESETTLEMENT POLICY (RRP)

Objective of RRP :Avoid or minimize land acquisition; where

displacement is unavoidable, prepare time boundRRP for PAPs.Special care for weaker sections/vulnerable groups To provide better standard of living Facilitate harmonious relationship between the

requiring body and affected families through mutualcooperation.

VJTI-MTech(Proj.Mgmt)/ Fall 2014

27

COMPENSATION POLICYApplication

Definition of AffectedPersons Entitlement

Land on the ProjectRight of Way

Loss Of PrivateAgricultural,Homestead &Commercial Land

Legal Title holders andAffected Parties withtraditional land rights

1.Compensation atreplacement cost2.Resettlement andRehabilitation

Registered tenants,contract cultivators &leaseholders

Compensation for standingcrops at market rate

Un-registered tenants,contract cultivators,leaseholders,sharecroppers

Compensation for standingcrops at market rate

VJTI-MTech(Proj.Mgmt)/ Fall 2014

28

CONTD..

Structure on the ProjectRight of WayLoss of PrivateStructures(Residential/Commercial)

Title Holder/Owner Compensation Atreplacement rateResettlement &Rehabilitation Assistance

Tenants/Lease HoldersResettlement &Rehabilitation Assistance

Standing Trees, Crops onProject Right of Way

Loss of Trees & Crops

Owners & beneficiaries ofland

Compensation at marketvalue

VJTI-MTech(Proj.Mgmt)/ Fall 2014

29

Structures on the ProjectROWLoss ofResidential/Commercial Structures byNon Title Holders

Owners of structuresidentified as on date ofnotification

Compensation at replacementcostResettlement & RehabilitationAssistance

Households living onRight of wayLoss of Livelihood

Title Holders/ Non-Titleholders/share-croppers,agricultural labourersand employees

Rehabilitation Assistance

Households affected byROWAdditional support tovulnerable group

Households affectedRehabilitation Assistance

CONTD..…VJTI-MTech(Proj.Mgmt)

/ Fall 2014

30

Affected ScheduledTribes

Households affected byROW

Rehabilitation Assistance

Structures & otherresources (eg land,water, access to socialservices etc) on ROWLoss of CommunityInfrastructure/Common PropertyResources

Affected communitiesand groups

Reconstruction ofcommunity structure andcommon property resources

Land & assetstemporarily impactedduring construction

Owners of land & assets Compensation for temporaryimpact during constructionlike disruption of normaltraffic, damage to adjacentparcel of land/ assets due tomovement of heavymachinery and plant site.

CONTD.. VJTI-MTech(Proj.Mgmt)/ Fall 2014

31

HINTERLAND DEVELOPMENT• NODE-18: IGATPURI-NASHIK-SINNAR INVESTMENT REGION

• Close by the Mumbai-Kalyan-Igatpuri-Manmad-Jalgaon trunk road.

• Industrial sectors in Nashik - Engineering, Automobile, Aluminium, Raisins,and Steel Furniture.

•ADVANTAGES:Proximity to urban center of Nashik.Served by NH-3 and NH-50.

• Widening and Strengthening of NH-3 to four lane dual carriageway beingimplemented whereas NH-50 has two-lane carriageway configuration.

• Construction of Nashik-Mumbai Expressway is under implementation.

• Wine Park in Nashik district at Vinchur

• Urban Infrastructure improvement under JNNURM Scheme

VJTI-MTech(Proj.Mgmt)/ Fall 2014

32

• Export-oriented Industrial Units/ SEZ: has the potential forEngineering, Automobile, Aluminium, Raisins, and Steel FurnitureSectors.

• Augmentation of Existing Industrial Estates: augmentation of twoindustrial areas in Nashik district (Nashik and Sinnar) are considered forimplementation under DMIC.

• Integrated Agro/Food Processing Zone: an Integrated Agro/FoodProcessing Zone with horticulture market will be developed as part of theNashik-Sinnar Investment Region.

• Knowledge Hub/Skill Development Centre: To support theengineering, automobile, wine production/ agro-processing sectors, aKnowledge Hub/skill up gradation centre is proposed to be developed withintegrated infrastructure facilities.

BUSINESS CASE

VJTI-MTech(Proj.Mgmt)/ Fall 2014

33

Contd..• Integrated Logistics Hub

• Integrated Township

• Development of Nashik Airport

• Feeder Road Links

• Feeder Rail Links

VJTI-MTech(Proj.Mgmt)/ Fall 2014

34

LogisticsVJTI-MTech(Proj.Mgmt)

/ Fall 2014

35

NEED FOR LOGISTICS IN INDIA

•Highly Competitive and Low Cost

•Low Utilization and High Transit Times

•Overloading of Vehicles

•Poor Infrastructure

•Barriers to Free Movement

•Very Unsafe

VJTI-MTech(Proj.Mgmt)/ Fall 2014

36

Freight Cost

• Canada - US$ 0.02

• Japan – US$ 0.037

• France - US$ 0.055

• India – US$ 0.07

high rates of economicgrowth and trade growth

weaknesses in qualityand geographicalcoverage of the logisticsservices and facilities

VJTI-MTech(Proj.Mgmt)/ Fall 2014

37

BENEFITS

• Reduced transit time and processing time

• Optimal use of all modes of transport thusreducing overall cost

• Easy access to value added logistics services

• Improved service levels, professionalism

• Reduction in inventory and damages.

VJTI-MTech(Proj.Mgmt)/ Fall 2014

38

VJTI-MTech(Proj.Mgmt)/ Fall 2014

39

top related