CALCULO DE ARMADURA DE RESERVORIO
DATOS
PROYECTO :AGUA POTABLE CCOMAYO ACERO MUROS
EXPEDIENTE : ACERO VERTICAL = 3/8 Pulg.
ZONAL : CANAS DIAMETRO = 0.953 Cms.
EVALUADOR :CARLOS L AREA = 0.713 Cms2.
FECHA 8-Apr-23 PESO = 0.560 Kg/ml
ACERO HORIZONTAL= 3/8 Pulg.
DIAMETRO = 0.953 Cms.
CARACTERISTICAS GEOMETRICAS AREA = 0.713 Cms2.
VOLUMEN RESERVORIO = 5.00 m3 PESO = 0.560 Kg/ml
ALTURA UTIL RESERVORI = 1.25 mts.
LADO UTIL RESERVORIO = 2.00 mts. ACERO LOSA DE TECHO
ESPECIFICACIONES ACERO HORIZONTAL= 3/8 Pulg.
CONCRETO f'c = 175 Kg/cm2 DIAMETRO = 0.953 Cms.
SOBRECARGA EN LOSA = 150 Kg/m2 AREA = 0.713 Cms2.
ACERO fy = 4,200 Kg/cm2 PESO = 0.560 Kg/ml
RESISTENCIA DEL SUELO = 1.00 Kg/cm2 ACERO LOSA DE FONDO
COEF. SISMICO = 0.12 ACERO HORIZONTAL= 3/8 Pulg.
RECUBRIMIENTO r = = 4.00 Cm DIAMETRO = 0.953 Cms.
fs = 2,100 Kg/cm2 AREA = 0.713 Cms2.
fc = 78.8 Kg/cm2 PESO = 0.560 Kg/ml
0.20 0.15 1.00
1.35
1.35
Sc Wc
SL 0.10
A' B'
0.30
WL NIVEL DE AGUA
S1
1.25
Ea
1.85 1.80 W1 0.42
0.98 Wa
A B
S2 0.20
0.10
C D
W2
0.28
0.68
0.85
CALCULOS CALCULO DEL MOMENTO ULTIMO
W1= Pc x V1 558.00 Kg
W2 = Pc x V2 648.00 Kg d = t1 - r - D/2
Wa = Pa x Va 1250.00 Kg AREA DE ACERO
WL = Pc x VL 276.00 Kg As1 =
Ws = Sc x A 172.50 Kg As2 =
S1 = 0,12 x W1 100.44 Kg
S2 = 0,12 x W2 116.64 Kg CUANTIA = As / t1 x b
SL = 0,12 x WL 49.68 Kg
Ss = 0,12 x Ws 37.26 Kg CUANTIA MINIMA POR FLEXION
Ea = 1,12 x 0,5 x Pa x H12 1312.50 Kg
USAR :
VERIFICACION DEL ESFUERZO CORTANTE EN LA BASE AB
ACERO EN LA LOSA DE TECHO
V = Fh / A 1.00 Kg/cm2
Vc = 0,29 ( f'c )^1/2 3.84 Kg/cm2 WuL = SC * 1,8
V= 1.00 Kg/cm2 < Vc = 3.84 Kg/cmBIEN !!
CALCULO DEL MOMENTO ULTIMO
CALCULO DE LA ARMADURA
ACERO VERTICAL CARA B'-B d = t1 - r - D/2
AREA DE ACERO
MOMENTO MAXIMO EN LA BASE A-B As1 =
As2 =
Mu 765.68 Kg-mts.
d = t1 - r - D/2 10.52 Cms. CUANTIA = As / t1 x b
AREA DE ACERO CUANTIA MINIMA POR FLEXION
As1 = 72.56 Cms2
As2 = 1.98 Cms2 SE ASUME : 1.98 Cms2 As = P * t1 * b
CUANTIA = As / t1 x b 0.0013
CUANTIA MINIMA POR FLEXION 0.0012 < 0.0013 BIEN!! USAR :
USAR : 1 ø 3/8 @ 0.30 mts.
ACERO HORIZONTAL B'B
ASUMIR CUANTIA MINIMA PARA EL ACERO HORIZONTAL, CONSIDERANDO P = 0,0018
As = P x b x t1 2.70 Cms2
USAR : 1 ø 3/8 @ 0.26 mts.
ACERO EN LA ZAPATA
ASUMIR EL AREA DE ACERO HALLADA PARA LA BASE DE MURO
USAR : 1 ø 3/8 @ 0.30 mts.
ACERO EN LA LOSA DE FONDO
P1 1904.4
P2 3850.2
P3 3348.00
P4 5248.80
P5 7500.00
LUEGO: 4130.70
270.00
4400.70
Mu = 0,0513 * Wu * L
WuD = 2400 * t1 * 1,5
Mu = 0,0479 * Wu * L
WuD :
WuL :
Wu :
CALCULO DEL MOMENTO ULTIMO
1194.25 Kg--mts
d = t1 - r - D/2 15.52 Cms.
AREA DE ACERO
107.88 Cms2
2.07 Cms2 SE ASUME : 2.07 Cms2
CUANTIA = As / t1 x b 0.00104
CUANTIA MINIMA POR FLEXION 0.0012 > 0.0010 MAL!!
1 ø 3/8 @ 0.25 mts.
ACERO EN LA LOSA DE TECHO
360
WuL = SC * 1,8 270
Wu = 630
CALCULO DEL MOMENTO ULTIMO
120.71 Kg--mts
d = t1 - r - D/2 5.72 Cms.
AREA DE ACERO
39.95 Cms2
0.57 Cms2 SE ASUME : 0.57 Cms2
CUANTIA = As / t1 x b 0.00057
CUANTIA MINIMA POR FLEXION 0.0012 > 0.0006 MAL!! SE ASUME CUANTIA MINIMA P= 0.0012
As = P * t1 * b 1.20 Cms2
1 ø 3/8 @ 0.25 mts
Mu = 0,0513 * Wu * L2
WuD = 2400 * t1 * 1,5
Mu = 0,0479 * Wu * L2
2.70
0.15 0.30
0.20 0.15 TUB. F°G° Ø 3/4"
@ 0,30 Mts.
0.15
1.5 UNIONES
ELECTROSOLDADAS
0.10
2.00
ESCALINES F°G°
VER DETALLE DETALLE DE ESCALINES
BUZON 0,60 x 0,60 Mts.
TAPA SANITARIA METALICA
ESPECIFICACIONES TECNICAS
0.15 RESISTENCIA DEL CONCRETO f'c = 175 Kg/cm2
FLUENCIA DEL ACERO fy = 4200 Kg/cm2
0.20 TRASLAPE MINIMO DE VARILLAS = 30 cm
0.20 0.15 2.00 0.15 0.20
FONCODESRESERVORIO APOYADO 5 M3
PLANTA
C. LOAYZA P. Apr-23
TAPA SANITARIA METALICA Ø 3/8 @ 0.25
0,60 x 0,60 mts.
0.10
� � � � � � � � �� �
0.30
NIVEL DE AGUA
� Ø 3/8 @ 0.30 �
Ø 3/8 @ 0.26 TARRAJEO C / IMPERMEABILIZANTE 1.55
� �1.25
Ø 3/8 @ 0.30
� �Ø 3/8 @ 0.25 PENDIENTE DE FONDO 1%
Ø 3/8 @ 0.30
� �� � � � � � � � �
0.20
� � � � � � � �0.075
0.67 SOLADO DE CONCRETO
0.20 0.15 2.00 0.15 0.20
FONCODESRESERVORIO APOYADO 5 M3
CORTE A-A
C. LOAYZA P. Apr-23
TUBERIA DE VENTILACION F°G° ø 2"
Ø 3/8 @ 0.25
2.30
2 Ø 3/8
ESPECIFICACIONES TECNICAS
RESISTENCIA DEL CONCRETO f'c = 175 Kg/cm2
FLUENCIA DEL ACERO fy = 4200 Kg/cm2
TRASLAPE MINIMO DE VARILLAS = 30 cm
2.30 FONCODESRESERVORIO APOYADO 5 M3
ARMADURA DE LOSA DE TECHO
C. LOAYZA P. Apr-23
PLANILLA DE ARMADURA RESERVORIO 5 M3
ARMADURA LOSA DE TECHO Ø LONGITUD VECES PESO
2.24
0.07 3/8 2.38 20.4 27.19
2.24
3/8 2.24 4 5.02
ARMADURA LOSA DE FONDO Ø LONGITUD VECES PESO
1.02
0.17 3/8 1.19 40.00 26.58
2.64
3/8 2.64 12.89 19.05
ARMADURA DE MURO Ø LONGITUD VECES PESO
0.11
1.71 3/8 1.93 34.67 37.47
0.152.15 3/8 4.75 13.92 37.04
1.15
PESO TOTAL EN Kg 152.35
HOJA DE METRADOS DE RESERVORIO
CAPACIDAD : 5 M3
PROYEC.: AGUA POTABLE CCOMAYO EVALUADOR: CARLOS L
EXPED.: 0 FECHA: 4/8/2023
PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL TOTAL UNID.
6.00 RESERVORIO 5.00 M3
6.01 TRAZO Y REPLANTEO 1.00 2.70 2.70 7.29 7.29 m2
6.02 EXCAVACION MANUAL 1.00 2.70 2.70 0.80 5.83 5.83 m3
6.03 SOLADO DE CONCRETO E= 0.05 Mts. 1.00 2.70 2.70 7.29 7.29 m2
6.04 CONCRETO F'C= 175 KG/CM2 1.00 2.70 2.70 0.20 1.46 3.99 m3
2.00 2.30 0.15 1.55 1.07 m3
2.00 2.00 0.15 1.55 0.93 m3
1.00 2.30 2.30 0.10 0.53 m3
6.05 CONFOR. DE PENDIENTE DE FONDO C° F'C= 175 K 1.00 2.00 2.00 4.00 4.00 m2
6.06 ENCOFRADO Y DESENCOFRADO 4.00 2.30 1.65 15.18 31.58 m2
4.00 2.00 1.55 12.40 m2
1.00 2.00 2.00 4.00 m2
6.07 ACERO FY= 4,200 KG/CM2 1.00 152.35 152.35 152.35 kg
6.08 ESCALINES DE FIERRO GALVANIZADO 2.00 2.05 4.10 5.30 ml
4.00 0.30 1.20
6.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 4.00 2.00 1.55 12.40 16.40 m2
1.00 2.00 2.00 4.00 m2
6.10 TARRAJEO EXTERIOR MEZCLA 1:5 4.00 2.30 1.65 15.18 20.47 m2
1.00 2.30 2.30 5.29 m2
6.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. 1.00 1.00 1.00 unid
6.12 TUBERIA DE VENTILACION F°G° D= 2" 1.00 1.00 1.00 unid
6.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO 1.00 1.00 1.00 glb
6.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR 1.00 1.00 1.00 unid
6.15 PINTADO DE MUROS EXTERIORES 4.00 2.30 1.65 15.18 20.47 m2
1.00 2.30 2.30 5.29
TIEMPO DE EJECUCION DE OBRA
PARTIDA DESCRIPCION UNID METRADO RENDI. PERSONAL PERSONAL BASE TIEMPO
6.00 RESERVORIO 5.00 M3
6.01 TRAZO Y REPLANTEO m2 7.29 200.00 1.00 1.00 0.296.02 EXCAVACION MANUAL m3 5.83 3.00 1.00 5.00 3.116.03 SOLADO DE CONCRETO E= 0.05 Mts. m3 7.29 70.00 2.00 2.00 0.836.04 CONCRETO F'C= 175 KG/CM2 m3 3.99 9.00 2.00 2.00 3.546.05 CONFOR. DE PENDIENTE DE FONDO C° F'C= 175 K m2 4.00 70.00 2.00 2.00 0.466.06 ENCOFRADO Y DESENCOFRADO m2 31.58 10.00 1.00 5.00 5.056.07 ACERO FY= 4,200 KG/CM2 kg 152.35 250.00 1.00 1.00 4.886.08 ESCALINES DE FIERRO GALVANIZADO ml 5.30 15.00 1.00 1.00 2.836.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE m2 16.40 6.00 1.00 2.00 10.936.10 TARRAJEO EXTERIOR MEZCLA 1:5 m2 20.47 10.00 1.00 2.00 8.196.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. und 1.00 5.00 1.00 1.00 1.606.12 TUBERIA DE VENTILACION F°G° D= 2" und 1.00 10.00 1.00 1.00 0.806.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO glb 1.00 10.00 1.00 1.00 0.806.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR und 1.00 10.00 1.00 1.00 0.806.15 PINTADO DE MUROS EXTERIORES m2 20.47 25.00 1.00 1.00 6.55
6.33
VOLUMEN ALTURA LADO INTER VOLUMEN ASUMIDO
3.00 1.25 1.55 5.00 M34.00 1.25 1.80
5.00 1.25 2.00 ALTURA LADO
6.00 1.25 2.20 1.25 2.007.00 1.25 2.40
8.00 1.30 2.50
9.00 1.30 2.65
10.00 1.35 2.75
11.00 1.40 2.85
12.00 1.45 2.90
13.00 1.50 2.95
14.00 1.55 3.05
15.00 1.55 3.15
16.00 1.60 3.20
17.00 1.65 3.25
18.00 1.65 3.35
19.00 1.70 3.35
20.00 1.70 3.45
21.00 1.75 3.50
22.00 1.75 3.55
23.00 1.80 3.60
24.00 1.85 3.65
25.00 1.85 3.70
26.00 1.85 3.75
27.00 1.90 3.80
28.00 1.90 3.85
29.00 1.95 3.90
30.00 1.95 3.95
31.00 2.00 3.95
32.00 2.00 4.00
33.00 2.05 4.05
34.00 2.05 4.10
35.00 2.05 4.15
36.00 2.10 4.15
37.00 2.10 4.20
38.00 2.15 4.25
39.00 2.15 4.30
40.00 2.15 4.35
41.00 2.20 4.35
42.00 2.20 4.40
43.00 2.20 4.45
44.00 2.25 4.45
45.00 2.25 4.50
46.00 2.25 4.55
47.00 2.30 4.55
48.00 2.30 4.60
49.00 2.30 4.65
50.00 2.35 4.65
51.00 2.35 4.70
52.00 2.45 4.65
53.00 2.40 4.70
54.00 2.40 4.75
55.00 2.40 4.80
56.00 2.40 4.85
57.00 2.45 4.85
58.00 2.45 4.90
59.00 2.55 4.85
60.00 2.45 4.95