Dr.Sreedhar CherukuriDr.Sreedhar CherukuriExecutive Executive Director Director
APIIC APIIC
Andhra Pradesh Industrial Infrastructure Corporation Ltd.
8th November 2011
• Industrial Corridor between Visakhapatnam & Kakinada (140 km)
• Abutting Krishna-Godavari Natural Gas Basin (KG Basin)
• Excellent connectivity (sea, air, road, rail)KAKINADA
VISAKHAPATNAM
KG BASIN
Strategically Located
Western MarketsWestern Markets
South Eastern MarketsSouth Eastern Markets
Eastern MarketsEastern Markets
Port to Port Distance of Key Markets from AP PCPIR – In No
of Days
Singapore 5
Seoul 15
Hamburg 27
Rotterdam 27
Dubai 9
Shanghai 14
Colombo 3
Tokyo 16
Houston
Boston 32
…. Easy Access to Domestic & Global Markets
37
Hub for Exploration
and Production
Activity
Area: 603.58 Sq.km (60,358 hectares) 6 SEZs within PCPIR - 4067 hectares
PCPIR Notified Area
Pharma Apparel
Pharma
Multi Product
Food Products
Multi- Product
Govt. of A.P. has constituted Visakhapatnam- Kakinada PCPIR Special Development Govt. of A.P. has constituted Visakhapatnam- Kakinada PCPIR Special Development Authority Authority (VK-PCPIR, SDA)vide G.O.Ms. No. 373 dated 24.5.2008, MA&UD Department for (VK-PCPIR, SDA)vide G.O.Ms. No. 373 dated 24.5.2008, MA&UD Department for preparation of Master plan, enforcement and regulatory functions, and developing preparation of Master plan, enforcement and regulatory functions, and developing Social Infrastructure, housing etc.Social Infrastructure, housing etc.
M/s. LEA Associates South Asia are the consultants for the Master planM/s. LEA Associates South Asia are the consultants for the Master planInterim report was submitted Interim report was submitted MoEF has approved ToR for EIA in respect of VK-PCPIRMoEF has approved ToR for EIA in respect of VK-PCPIR
Investment Potential
Projected Investment (in next 5 years) (US$ 70 bn) INR 3,430 bn
Petroleum & Petrochemical Sectors: (US$ 44 bn)INR 2160 bn
Chemical, Pharma & Fertilizer Sectors: (US$ 10.6 bn)INR 520 bn
Ancillary Industries: (US$ 4.1 bn)INR 200 bn
Housing & Allied Infrastructure: (US$ 7.1 bn)INR 350 bn
External Infrastructure: (US$ 3.9 bn)INR 190 bn
MAJOR PLAYERS IN PCPIR
Hindustan Petroleum
Corporation
LG Polymers India Pvt. Ltd.
Ckoromandel Fertilizers Ltd
Andhra Petrochemicals Ltd
Rain Commodities Ltd.
Pharma City with Pharma SEZ
Hetero Pharma SEZ
Godavari Fertilizers &
Chemicals Ltd
Nagarjuna Fertilizers &
Chemicals Ltd
1 MMT Crude Oil Strategic
Storage Cavern by ISPRL (under
process)
HPCL Visakh Refinery
SALPG Cavern
Andhra Petrochemicals
Limited
Nagarjuna Fertilizers & Chemicals Ltd
HPCL
Strengths of AP PCPIR
GAS RESERVES
AP PCPIR abuts Krishna Godavari Basin (KG Basin), highest gas reserves in India. Reliance Industries and ONGC already supplying gas (85 MMSCMD) from KG Basin.
Gas distribution network being developed for supplying gas to PCPIR units.
PORTS :Visakhapatnam Port - India's largest cargo handling port (65MMTPA)
Gangavaram Port - India's deepest port (21 m draft ),automated handling. Present capacity 35MMTPA, and ultimate capacity 200 MMTPA
Kakinada Deep Water Port - 4 berths with 12 MMTPA handling capacity having 13 mt draft
Two more ports planned in the region
A captive port at Kakinada cluster by GMR group proposed
LAND: Large extent of land acquired and infrastructure provided. About 8417 Hec of land available for allotment out of the total 12127 hec of land acquired
WATER: Reliable Water Supply 10 TMC (776 MLD) from river Godavari & Yeleru. Project @ a cost of INR 500 crs completed.
POWER: A.P has 14,086 MW Installed capacity Adding another 10,000 MW in next 3 years.
INFRASTRUCTURE , THE ESSENTIAL AND KEY ECONOMIC DRIVER FOR THE REGION
PORTS AND LOGISTICSTRANSPORTATION
ROADSRAIL NETWORKAIRPORTS
INDUSTRIAL INFRASTRUCTURE SOCIAL INFRASTRUCTURE
Traffic handled in 2010-11: 68.4 MMT
Second largest cargo handling port in India
Expansion to handle 86 MMT traffic by 2012-13
LPG cavern by HPCL with TOTAL SA of France: 60,000 MT commissioned in 2008
Proposed Single Point Mooring facility to handle VLCC
THE IDEAL GATEWAY
VCTPL - A JOINT VENTURE OF INDUSTRY LEADERS
Visakhapatnam Port Trust India’s Premier port DP World, Dubai Leading Global Port & Terminal Operator United Liner Agencies Leading Shipping Agency HouseJ.M.Baxi & Co. Shipping Support Services
Developed in PPP format by GoAP & Gangavaram Port Ltd.
All-weather Greenfield Deepwater Port
India’s deepest port
Dry bulk & container - 21 m draft
Single Point Mooring - 35 m draft to handle ULCC
Capable of handling Super Cape Size Vessel (2,00,000 DWT)
Operations started in August 2008
Cargo handled in 2010-11 - 14 MMT
Recently handled Cape Size vessel (170,000 DWT) – First time in India
KAKINADA DEEP WATER PORT
Started with 3 berths by GoAP
PPP Project for Development and O&M (GoAP & ISPL, Malaysia)
Handled 10 MMT cargo in 2010-11
New OSV Terminal commissioned in Dec 2007
4th berth commissioned in Feb 2008
Two more berths being added
EXISITING VISAKHAPATNAM
PORT
EXISTING GANGAVARAM PORT
PROPOSED MUTYALAMMAPALEM
PORT
PROPOSED DEDICATED PORT AT KONA
EXISTING KAKINADA DEEP WATER PORT
Ports – Rs 36,000 Million
NATIONAL HIGHWAY 54 to 6 Lane Up-
gradation
STATE HIGHWAY 972 to 4 Lane
Upgradation
138 km PCPIR EXPRESS WAY( Gangavaram Port to Kakinada
Port)
NATIONAL HIGHWAY 2144/6 lane up-gradation
ADB ROAD: Connector from Port to NH5
VISAKHAPATNAM
KAKINADA
KATHIPUDI
NH-214
NH-5
Road Network – Rs 43,810 Million
NH connectivityGoI approved in principle 4-laning of the following 3 roads under CRF (EI scheme)
Land acquisition for widening to be done by AP GOVT. Cost of Land acquisition Rs. 52.00 CroresLand acquisition initiated by APIIC on behalf of R&B Dept.The above roads, once 4-laned, would provide excellent connectivity to the Industrial clusters in PCPIR NH Widening RFQ being issued for 6-laning of NH-5 (Visakhapatnam to Rajahmundry) Proposals for 4-laning of NH-214( Kathipudi to Kakinada) being followed up with Govt. of India.
GoI GoAP Total (Rs.in Cr)
Anakapalli – Atchutapuram (15 km) 37.5 37.5 75Yelamanchili – Atchuthapuram (15 km) 37.5 37.5 75Annavaram – Kakinada (30 km) 75 75 150
Total 150 150 300
PCPIR EXPRESSWAY
PCPIR expressway from Visakhaptnam Port / Gangavaram Port to Kakinada planned – 138km - A dedicated road for speedy movement of PCPIR cargo
Proposed to be taken up in two phases under PPP mode (BOOT Basis).
PHASE – I: Visakhapatnam port / Gangavaram port to APSEZ (35 KM)Cost : Rs. 220.30 Cr
APIIC/GoAP in association with INCAP, IFC and Halcrow consulting Engineers has taken up the study of this project.
Alignment finalized Part of the alignment in the final reaches passes through Steel Plant Land Certain Land related issues to be finalized with RINL (Vizag Steel Plant) Bids to be invited, after the alignment clearance
PHASE – II: APSEZ, Atchuthapuram to Kakinada(103 KM) IFC has commissioned M/S. Ayesa (Spain) & Feed back Infra for conducting the
feasibility studies. Inception report & Alignment options note submitted by the consultant Alignment option to be finalize in meeting with all the stake holders
APIIC has initiated land acquisition for Phase-I
Additional Connections for a Through Line
HindujaNTPC lineNTPC line
Main lineMain line
Main lineMain line
Main lineMain line
NTPC lineNTPC line
RINL lineRINL line
RINL lineRINL line
VPT lineVPT line
Main lineMain line
19
RAIL LINK TO APSEZ
APIIC engaged RITES as consultants for studying the feasibility and detailed project report for rail link APSEZ
It is proposed to take the consent of NTPC for branching off their Railway siding at Desapatrunipalem.
Land Acquisition to be initiated after in principle approval of NTPC
Plans are afoot to create a logistics hub in APSEZ.
153 km YELERU LEFT MAIN CANAL
181.5 km POLAVARAM LEFT MAIN CANAL
YELERU RESERVOIR
56 km GODAVARI PIPELINE TO YLMC
RIVER GODAVARI
SAMALKOTA CANAL
Dedicated Visakhapatnam Industrial Water Supply scheme from Godavari (209 km – 10 TMC – outlay Rs. 500 Crores) – operational since Dec 2004
Water Supply Water Supply
Water
Visakhapatnam Industrial Water Supply Company Ltd (VIWSCO)
Dedicated industrial water supply project from Yeleru Canal and River Godavari as source - Rs. 500 Crores - Capacity 10 TMC
Operational since Dec 2004
Raw Water Sources
153 km Yeleru Left Main Canal from Yeleru Reservoir - 385 MLD (5TMC)
56 km Pipeline from River Godavari - 385 MLD (5 TMC)
Proposed augmentation through Polavaram Left Main Canal from River Godavari under execution: 1848 MLD (24 TMC)
For Kakinada area - Samalkota Canal from Godavari - 220 MLD (3 TMC)
Waste Management
Waste management facilities available at JN Pharma City
Treatment, Storage & Disposal Facility (TSDF) for hazardous waste: Secured landfill-10 lakh Tonnes capacity.
Common Effluent Treatment Plant (CETP) of 4.5 MLD capacity for treatment of effluents-To be expanded to 9 MLD.
36 TPD capacity incinerator for organic waste
Existing Marine Outfall at Pharma City (16 km), similar marine outfalls proposed for other SEZs / industrial parks
TSDF at Pharma
City
Effluent Conveyance
CETP at Pharma City
CETP at Pharma City
Contd……
A 22 MLD capacity CETP of Brandix India Apparel City is operational
Marine Outfall 2 x 560 mm dia pipe line commissioned for Brandix India Apparel
Waste Management facilities at APSEZ, Atchuthapuram
3 CETP’s for a total capacity of 31 MLD & 1 STP with a capacity of 9 MLD planned at APSEZ, Atchuthapuram
Separate Marine Outfall facility for APSEZ planned
Waste Management facilities at Brandix SEZ
Trunk Line Infrastructure
• EOI for Trunk lines submitted to PNGRB:
• Kakinada – Visakhapatnam – Srikakulam Pipeline
• Development of regional gas grid:• All the industrial parks and major industries
being covered under the plan of action
RAJAHMUNDRY AIRPORT
PROPOSED NEW INTERNATIONAL AIRPORT AT VISAKHAPATNAM
VISAKHAPATNAM DOMESTIC AIRPORT
Airports - Rs 26,200 Million
Outlay for External Infrastructure Development (INR) 190,310 Mn – US$ 3.9 bn
Road Network-Improvement & Greenfield Roads43,810
New Rail Links & Rail Freight Stations10,100
Greenfield Airport, Air Cargo Complex & Upgradation of Existing Airport
26,200 Upgradation of Port Facilities
36,000 Other External Infrastructure (Logistics Hubs, Water Supply,
Power Supply, Waste Management)74,200
TOTAL 190,310
Rs. in Million
LAND AVAILABLE FOR ALLOCATION
S.No. Location Extent (In Acres)
land allotted
(InAcres)
Balance Available
for allotment (In Acres)
1 APSEZ 5605.74 557.29 3119.29
2 BARC 3253.66 3253.66 NIL
3 BARC CAMPUS / HOUSING COLONY, APPROACH ROAD (Including land under acquisition)
1610.72 1610.72 NIL
4 BRANDIX 1000 1000 NIL
5 DTA at Atchuthapuram & Rambilli Mandals (Including land under acquisition)
3240.55 500 2423
6 NAKKAPALLIUnder Acquisition
4662 NIL 4662
7 KAKINADA SEZ 8500 NIL 8500
8 KONA 2095 NIL 2095
Total 29967.67(12,127.7
Ha)
6921.67(2801.2
Ha)
20,799.29(8417.4
Ha.)
Location : Atchutapuram and Rambilli (M), Vizag
Total Area Notified : 5595 Acres Net Usable Area : 4389 Acres Allotted Extent : 516.95 Acres No.of units allotted : 14 nos Units under operational : 5 nos
Expected Investment : Rs.35000 Crores ( so far made: 1500 Cr)
Projected Employment : 1,50,000 person ( Generated so far:2039)
Infrastructure Proposed : Proposed : Rs. 800 Crores So far made : Rs. 480 Crores
APSEZ - The driving force
A
P
S
E
Z
4-lane approach road for APSEZ
UNIPARTS
WS Industries POKARNA
PILKINGTON