Annexure - I
Stringing of 33KV new wolf conductor. Sr
Description of work Scope Unit Rate
No.
Shifting of wolf conductors , cross arms,cross bracing, brackets,
1
pin insulators, PG clamps, disc insulators, channels, clamps, Barbed wire , danger plates, aluminum jointing kit , earthing
material & all other allied accessories to execution site from lpte
store with transportation.
2 Unloading of material at execution site. Contract
or Ckm
Stringing of 33kv new line of wolf conductor on rail pole
including fitting of all stringing hardwares & channels(i.e.cross
3 arms, cross bracing,brackets, pin insulators, PG clamps, disc
insulators, channels, clamps, Barbed wire , danger plates,
aluminum jointing sleeve, jumpering arrangement for cut point
on poles).
Supply of Material such as wolf conductors , cross arms,cross
4 bracing, brackets, pin insulators, PG clamps, disc insulators,
Total Amount
channels, clamps, Barbed wire , danger plates, aluminum
jointing kit , earthing material & all other allied accessories etc.
Note- Guarding of wire with lacing- Rs4000/km
Erection of Rail Pole 13 mtr Sr
Description of work Scope Unit Rate
No.
1
Shifting of poles & allied accessories to execution site from lpte store with transportation.
2
Making pole foundation as per BSPDCL standard with excavation, proper concreting (1:4:8) & muffing.
Foundation details-0.6m width X 0.6m breadth & depth 1/6th of
3 pole length (i.e. 0.65CUM per pole) with supply of all civil Contract
or Nos
material.
4 Erection of new rail pole (13 mtr) including painting
5 Pipe earthing for pole with supply of charcoal & salt.
Fitting of necessary hardwares, power channels, Barbed wire,
6 danger boards, jumpering arrangement on poles.(As per site
conditions)
7
Supply of Material such as Rail Pole, Danger Boards, Barbed wire
etc. Total Amount
8 Earthing material include earthing pipe, GI strip,GI plate.
Erection of stay set. Sr
Description of work Scope Unit Rate
No.
1
Shifting of stay set (20x1800mm) to execution site from lpte store with transportation.
2
Making stay foundation as per BSPDCL standard with excavation(0.4cum), proper concreting (1:3:6) & muffing.
3 Foundation details-0.6m width X 0.6m breadth & 0.8m depth
Contractor Nos
(i.e. 0.2CUM per stay) with supply of all civil material.
4 Erection of new stay set with all accessories.
5 Fitting of necessary hardwares,stay clamp on pole, Guy
insulators, turn buckles, stay rod & plate.(As per site conditions)
6 Supply of Material such as stay clamp, Guy insulators, turn
Total Amount
buckles, stay rod & plate etc.
Dismantling of existing 33KV line with
poles Sr
Description of work Scope Unit Rate
No.
Dismantling of existing Rail pole with its accessories & crediting
1 it to SBPDCL store including loading at site, transportation & Nos
unloading at store. 1
Annexure - I
Dismantling of 33KV overhead line with its hardware, insulators,
Contractor
3
channels, clamps , all related accessories & crediting it to
Ckm
SBPDCL store including loading at site, transportation &
unloading at SBPDCL store.
30,31,32,33 -199
Replacement of energy meters , service cables, service
distribution boxes. r No Description Scope Unit Qty Rate Amount
1
Loading , transporting & unloading of energy metre, service cables, at execution site.
Removing of old energy metre, DB, service cables & crediting
2 the old meter, DB, service cables at SBPDCL store including
transportation
Installation , testing & commissiong of A.C.Single Phase , 2 wire
3 solid state fully electronic Energy Meter with Pilfer proof meter Nos 160000
box(5-10amp/10-60amp)
Installation of A.C. 3 Phase 4 wire 10-60 Amp whole current
4 static Electronic Energy Meter with pilfer proof Meter Box Nos 9600
suitable for Housing the Meter and Modems.
5
Laying, of 1.1 kV grade Al conductor, PVC armoured cables of
following sizes. Contrac
tor a 3.5C x 25 sq mm mtr 120000
b 2C x 10 sq mm mtr 16000
00
6 termination of service cable & connection to consumers . The
connections shall be complete with cable laying & terminations
from service pillars to consumer Including all necessary work.
a 3.5C x 25 sq mm(at both ends) Nos 6000 b 2C x 10 sq mm(at both ends) Nos 80000
8
Shifting & installation of Distribution Box for 09 Nos of Service
Nos
400
connections
9
Shifting & installation of Distribution Box for 12 Nos of Service
Nos
16
connections
Material such as 1-ph/3ph meters, service cables, glands, lugs
Total
29C- 199
Stringing of new LT Rabbit conductor.
Sr No Description of work Scope Unit Rate
Shifting of Rabbit/weasel conductors , cross arms,cross bracing,
1 brackets, pin insulators, PG clamps, disc Contrac Ckm
insulators, channels, tor clamps, Barbed wire , danger plates, aluminum jointing kit ,
earthing material & all other allied accessories to execution site
from store with transportation. Unloading of material at execution site.
Stringing of new LT line of Rabbit conductors and weasel
conductors for neutral on 9m PSC pole including fitting of all
5 stringing hardwares , separators & channels(i.e.cross arms, cross
bracing,brackets, pin insulators, PG clamps, disc insulators,
channels, clamps, Barbed wire , danger plates, aluminum
jointing sleeve, jumpering arrangement for cut point on poles).
Supply of Material such as Rabbit conductors , cross arms,cross
9 bracing, brackets, pin insulators, PG clamps, disc insulators,
otal Amount
channels, clamps, Barbed wire , danger plates, aluminum
jointing kit , earthing material & all other allied accessories etc.
Note - Guarding of GI wire with lacing- Rs.3200/km
Erection of New PSC pole 400kg, 9m
Sr No Description of work Scope Unit Rate
1 Shifting of PSC poles & allied accessories such as earthing
Contractor Nos 3187
material to execution site from store with transportation.
Making pole foundation as per BSPDCL standard with
2 excavation(0.6mx0.6mx1.5m = 0.54cum),
proper concreting (1:4:8) & muffing.
2
Annexure - I
Pole Foundation details-0.6m width X 0.6m breadth & 1.2m
3 depth (i.e. 0.44CUM per pole) with supply of all civil material &
muffing. 4 Erection of new 400KG, 9m PSC pole.
5
Labour work for coil earthing for pole with supply of charcoal & salt.
Fitting of necessary hardwares, power channels, Barbed wire,
6 danger boards, jumpering arrangement on poles.(As per site
conditions)
7
Supply of Material such as PSC Pole, Danger Boards, Barbed wire
otal Amount
etc.
8 Earthing material include earthing coil, GI strip,GI plate.
Erection of stay set. Sr No Description of work Scope Unit Rate
1
Shifting of stay set (20x1800mm) to execution site from store Contract
or Nos
with transportation.
2
Making stay foundation as per BSPDCL standard with excavation(0.4cum), proper concreting (1:4:8) & muffing.
3 Foundation details-0.6m width X 0.6m breadth & 0.8m depth
(i.e. 0.2CUM per stay) with supply of all civil material.
4 Erection of new stay set with all accessories.
5 Fitting of necessary hardwares,stay clamp on pole, Guy
insulators, turn buckles, stay rod & plate.(As per site conditions)
6
Supply of Material such as stay clamp, Guy insulators, turn
otal Amount
buckles, stay rod & plate etc.
Dismantling of existing LT line with poles
Sr No Description of work Scope Unit Rate
1
Dismantling of existing PSC/Tubular pole with its accessories &
Contractor Nos
crediting it to SBPDCL store including loading at site,
transportation & unloading at SBPDCL store.
Dismantling of LT overhead line with its hardware, insulators,
2
channels, clamps , all related accessories & crediting it to
Ckm
SBPDCL store including loading at site, transportation &
unloading at SBPDCL store.
27-199 Stringing of new LT DOG conductor.
Sr Description of work Scope Unit
Rate
No.
Shifting of DOG/weasel conductors , cross arms,cross bracing,
1
brackets, pin insulators, PG clamps, disc insulators, channels, clamps, Barbed wire , danger plates, aluminum jointing kit ,
earthing material & all other allied accessories to execution site
from store with transportation. Unloading of material at execution site. Contract
or Ckm
Stringing of new LT line of DOG conductors and weasel
conductors for neutral on 9m PSC pole including fitting of all
5 stringing hardwares,separators & channels(i.e.cross arms, cross
bracing,brackets, pin insulators, PG clamps, disc insulators,
channels, clamps, Barbed wire , danger plates, aluminum
jointing sleeve, jumpering arrangement for cut point on poles).
Supply of Material such as Dog conductors , cross arms,cross
9 bracing, brackets, pin insulators, PG clamps, disc insulators,
Total Amount
channels, clamps, Barbed wire , danger plates, aluminum
jointing kit , earthing material & all other allied accessories etc.
Note - Guarding of GI wire with lacing- Rs.000/km
Erection of New PSC pole 400kg, 9m Sr
Description of work Scope Unit
Rate
No.
3
Annexure - I
1 Shifting of PSC poles & allied accessories
such as earthing material to execution
site from store with transportation.
Making pole foundation as per BSPDCL
standard with
2 excavation(0.6mx0.6mx1.5m = 0.54cum), proper concreting (1:4:8) & muffing.
Pole Foundation details-0.6m width X 0.6m breadth & 1.2m
3 depth (i.e. 0.44CUM per pole) with supply of all civil material &
Contractor Nos
muffing. 4 Erection of new 400KG, 9m PSC pole.
5
Labour work for coil earthing for pole with supply of charcoal & salt.
Fitting of necessary hardwares, power channels, Barbed wire,
6 danger boards, jumpering arrangement on poles.(As per site
conditions)
7
Supply of Material such as PSC Pole, Danger Boards, Barbed wire
etc. Total Amount
8 Earthing material include earthing coil, GI strip,GI plate.
Erection of stay set. Sr
Description of work Scope Unit Rate
No.
1
Shifting of stay set (20x1800mm) to execution site from store with transportation.
2
Making stay foundation as per BSPDCL standard with excavation(0.4cum), proper concreting (1:3:6) & muffing.
3 Foundation details-0.6m width X 0.6m breadth & 0.8m depth
Contractor Nos
(i.e. 0.2CUM per stay) with supply of all civil material.
4 Erection of new stay set with all accessories.
5 Fitting of necessary hardwares,stay clamp on
pole, Guy insulators, turn buckles, stay rod &
plate.(As per site conditions)
6 Supply of Material such as stay clamp, Guy insulators, turn Total Amount
buckles, stay rod & plate etc.
26, 29A, 29B -199
Erection of LT ABC 3x120 + 1x16 + 1x70 sqmm & 3x185 + 1x16 + 1x120 sqmm
Sr Description of work Scope Unit Rate
No
.
1 Shifting of PSC poles, LT ABC conductors with clamps, , jointing
kit , earthing material & all other allied
accessories to execution site from store with transportation.
2
Making pole foundation as per BSPDCL standard with
excavation, proper concreting (1:4:8) & muffing.
Pole Foundation details-0.6m width X 0.6m breadth & 1.2m
3 depth (i.e. 0.44CUM per pole) with supply of all civil material. &
muffing.
Erection of new 9m PSC pole including painting & coil earthing
4 with supply of charcoal & salt. Fixing of danger boards, Barbed Nos
wire on poles
Stringing of AB conductor (3x120 + 1x16 + 1x70 sqmm) on PSC
Contractor
5
pole including jointing & fitting of hardwares,(i.e. Dead
Ckm
End/suspension clamps,brackets, clamps on pole, piercing
connectors, jumpering arrangement on poles.(As per site
conditions)It includes fixing of end cap.
Stringing of AB conductor (3x185 + 1x16 + 1x120 sqmm) on PSC
pole including jointing & fitting of hardwares,(i.e. Dead
Ckm
End/suspension clamps,brackets, clamps on pole, piercing
connectors, jumpering arrangement on poles.(As per site
conditions)It includes fixing of end cap.
Installation of spring loaded distribution box with all
8 connections on pole. This includes all terminations inside the Nos
box using piercing connectors.
9
Supply of Material such as PSC pole, Danger Boards, Barbed
wire, jointing kit, AB conductor, suspension/dead end clamps,
Total Amount
piercing connectors, DB etc. 4
Annexure - I
10 Earthing material include earthing coil.
Erection of stay set. Sr
Description of work Scope Unit Rate
No.
1
Shifting of stay set to execution site from store with transportation.
2
Making stay foundation as per BSPDCL standard with excavation(0.4cum), proper concreting (1:3:6) & muffing.
3 Foundation details-0.6m width X 0.6m breadth & 0.8m depth
Contractor Nos
(i.e. 0.2CUM per stay) with supply of all civil material.
4 Erection of new stay set with all accessories.
5 Fitting of necessary hardwares,stay clamp on pole, Guy
insulators, turn buckles, stay rod & plate.(As per site conditions)
6 Supply of Material such as stay clamp, Guy insulators, turn
Total Amount
buckles, stay rod & plate etc.
Dismantling of existing LT line with poles Sr
Description of work Scope Unit
Rate
No.
1
Dismantling of existing PSC/Tubular pole with its accessories &
Nos
crediting it to SBPDCL store including loading at site,
transportation & unloading at SBPDCL store. Contractor
Dismantling of LT overhead line with its
hardware, insulators,
2
channels, clamps , all related accessories & crediting it to
Ckm
SBPDCL store including loading at site, transportation &
unloading at SBPDCL store.
12,14B,18-199
Conversion & Erection of 11KV HT ABC 3x185 + 1x150
sqmm Sr
Description of work Scope Unit
Quantity
Rate Amount
No.
1
Shifting of PSC poles, HT ABC conductors with clamps, , jointing kit , earthing material & all other allied accessories to execution
site from store with transportation.
2
Making pole foundation as per BSPDCL standard with excavation, proper concreting (1:4:8) & muffing.
Pole Foundation details-0.6m width X 0.6m breadth & 1.2m
3 depth (i.e. 0.44CUM per pole) with supply of
all civil material. & muffing.
Erection of new 9m PSC pole including painting & coil earthing
4 with supply of charcoal & salt. Fixing of danger boards, Barbed Nos 1079
wire on poles Contrac
tor
Stringing of HT AB conductor (3x185 + 1x150sqmm) on PSC pole
5
including jointing & fitting of hardwares,(i.e. Dead End/suspension clamps,brackets, clamps on pole, piercing
connectors, jumpering arrangement on poles.(As per site
conditions)It includes fixing of end cap. Ckm 48
6 Straight Through Joint for above cable 7 End Termination of above cable
Installation of distribution connector box with all connections on
8 pole. It also includes all terminations using T connectors, pre-
insulated rates.
Supply of Material such as PSC pole, Danger Boards, Barbed
9 wire, jointing/termination kit, AB conductor, suspension/dead
Total
Amount
end clamps, T connectors, DB etc.
10 Earthing material include earthing coil.
Note
- As per site requirements, pipe earthing will be paid extra at Rs.
Erection of stay set. Sr
Description of work Scope Unit
Quantity
Rate Amount
No.
1
Shifting of stay set (16x1800mm) to execution site from store with transportation.
5
Annexure - I
2
Making stay foundation as per BSPDCL standard with excavation(0.4cum), proper concreting (1:3:6) & muffing.
3 Foundation details-0.6m width X 0.6m breadth & 0.8m depth
Contractor
Nos 462
(i.e. 0.2CUM per stay) with supply of all civil material.
4 Erection of new stay set with all accessories.
5 Fitting of necessary hardwares,stay clamp on pole, Guy
insulators, turn buckles, stay rod & plate.(As per site conditions)
6 Supply of Material such as stay clamp, Guy insulators, turn
Total Amount
buckles, stay rod & plate etc.
Dismantling of existing HT line with poles Sr
Description of work Scope
Unit Quantity
Rate Amount
No.
1
Dismantling of existing PSC/Tubular pole with its accessories &
Nos
425
crediting it to SBPDCL store including loading at site,
transportation & unloading at SBPDCL store. Contractor
Dismantling of HT 11kv overhead line with its
hardware,
2
insulators, channels, clamps , all related accessories & crediting
Ckm
17
it to SBPDCL store including loading at site, transportation &
unloading at SBPDCL store.
Total Amount
13,14C, 19-199
Stringing of 11KV new DOG conductor.
Sr Description of work Scope
Unit
Quantity
Rate Amount
No.
Shifting of DOG conductors , cross arms,cross bracing, brackets,
1
pin insulators, PG clamps, disc insulators, channels, clamps, Barbed wire , danger plates, aluminum jointing kit , earthing
material & all other allied accessories to execution site from lpte
store with transportation.
Unloading of material at execution site. Contrac
tor Ckm 374
Stringing of11kv new line of DOG conductor on rail pole
including fitting of all stringing hardwares & channels(i.e.cross
5
arms, cross bracing,brackets, pin insulators, PG clamps, disc insulators, channels, clamps, Barbed wire , danger plates,
aluminum jointing sleeve, jumpering
arrangement for cut point on poles).
Supply of Material such as wolf conductors , cross arms,cross
9 bracing, brackets, pin insulators, PG clamps, disc insulators,
Total Amount
channels, clamps, Barbed wire , danger plates, aluminum
jointing kit , earthing material & all other allied accessories etc.
Note - Guarding of GI wire with lacing- Rs.4000/km
Erection of Rail Pole 11 mtr
Sr Description of work Scope
Unit
Quantity
Rate Amount
No.
1
Shifting of poles & allied accessories to execution site from lpte store with transportation.
2
Making pole foundation as per BSPDCL standard with excavation, proper concreting (1:4:8) & muffing.
Foundation details-0.6m width X 0.6m breadth & depth 1/6th of
3 pole length (i.e. 0.65CUM per pole) with supply of all civil Contrac
tor
Nos
871
material.
4 Erection of new rail pole.including painting
5 Pipe earthing for pole with supply of charcoal & salt.
Fitting of necessary hardwares, power channels, Barbed wire,
6 danger boards, jumpering arrangement on poles.(As per site
conditions)
7
Supply of Material such as Rail Pole, Danger Boards, Barbed wire
etc. Total
Amount
8 Earthing material include earthing pipe, GI strip,GI plate.
Erection of New PSC pole 400kg, 9m
6
Annexure - I
Sr Description of work Scope
Unit
Quantity
Rate Amount
No.
1 Shifting of PSC poles & allied accessories such as earthing
material to execution site from lpte store with transportation.
Making pole foundation as per BSPDCL standard with
2 excavation(0.6mx0.6mx1.5m = 0.54cum), proper concreting
(1:4:8) & muffing.
Pole Foundation details-0.6m width X 0.6m breadth & 1.2m
3 depth (i.e. 0.44CUM per pole) with supply of all civil material &
Contractor Nos 6350
muffing. 4 Erection of new 400KG, 9m PSC pole.
5
Labour work for coil earthing for pole with supply of charcoal & salt.
Fitting of necessary hardwares, power channels, Barbed wire,
6 danger boards, jumpering arrangement on poles.(As per site
conditions)
7
Supply of Material such as PSC Pole, Danger Boards, Barbed wire
etc. Total
Amount
8 Earthing material include earthing coil, GI strip,GI plate.
Erection of stay set.
Sr Description of work Scope
Unit
Quantity
Rate Amount
No.
1
Shifting of stay set (20x1800mm) to execution site from lpte store with transportation.
2
Making stay foundation as per BSPDCL standard with excavation(0.4cum), proper concreting (1:3:6) & muffing.
3 Foundation details-0.6m width X 0.6m breadth & 0.8m depth
Contractor Nos 2739
(i.e. 0.2CUM per stay) with supply of all civil material.
4 Erection of new stay set with all accessories.
5 Fitting of necessary hardwares,stay clamp on pole, Guy
insulators, turn buckles, stay rod & plate.(As per site conditions)
6 Supply of Material such as stay clamp, Guy insulators, turn
Total Amount
buckles, stay rod & plate etc.
Dismantling of existing 11KV line with poles Sr
Description of work Scope Unit Quantity Rate Amount
No.
2
Dismantling of existing PSC/Tubular pole with its accessories &
Nos 3000
crediting it to SBPDCL store including loading at site,
transportation & unloading at SBPDCL store. Contract
or
Dismantling of 11KV overhead line with its hardware, insulators,
4
channels, clamps , all related accessories & crediting it to
Ckm 200
SBPDCL store including loading at site, transportation &
unloading at SBPDCL store.
Total Amount
24A,25-199
Augumentation without change in
DP.
Sr Description of work Scope Unit Quantity Rate Amount
No.
Activity Work scope include all labour charges for erection of DT
+ LTCT+ 2 set of Kitkat Fuse +1Core HT/LT cable .
1
Loading of DT, Kitkat fuse, LTCT( all other suitable accessories from store .
2 Unloading of above accessories at execution site .
3 Use of Hydra for DT loading and unloading.(Including labour).
Transportation of all material( DT, Kitkat fuse, LTCT and all
4 other suitable accessories ) from store to execution site is in
your scope. Contract
or
7
Annexure - I
5
Removing of LT ,HT cable,LTCT, Kitkat fuse , AB switch, HG fuse,LA of old DT.(only labour charges with toolkit)
6
Replacement of old DT , LTCT, fuse by NEW DT, LTCT & fuse respectively.
7
For old 200KVA to New 315KVA DT ,2 set of 500A Fuse &
Nos
1030
(600/5A) LTCT
8
For old 100 kva to New 200 KVA DT , 2 set of 400A Fuse &
Nos
15
(400/5A) LTCT
9
Loading of old DT , LTCT, fuse from site and unloading at SBPDCL store.
10 Reconnecting of HT/LT cable & earthing to DT.
Supply of Material such as DT, LTCT, 1Core L.T. XLPE cable (300
11 sq.mm., termination joint kit for 3 C X 95 sqmm,earthing
Total
material), KitKat Fuse
12 Earthing material include earthing pipe, GI strip,GI plate,
24B-199
Erection of New DP PSC pole 400kg, 9m for erecting
315KVA DT Sr
Description of work Scope Unit
Quantity
Rate Amount
No.
1 Shifting of PSC poles & allied accessories such as earthing
material to execution site from lpte store with transportation.
Making pole foundation as per BSPDCL standard with
2 excavation(0.6mx0.6mx1.5m = 0.54cum), proper concreting
(1:4:8) & muffing.
Pole Foundation details-0.6m width X 0.6m breadth & 1.2m
3 depth (i.e. 0.44CUM per pole) with supply of all civil material &
Contractor Nos 80
muffing.
4 Erection of new DP structure with 9m PSC pole.
5
Labour work 4 nos of Pipe earthing for pole with supply of charcoal & salt.
Fitting of necessary hardwares, power channels, Barbed wire,
6 danger boards, jumpering arrangement on poles.(As per site
conditions)
7
Supply of Material such as PSC Pole, Danger Boards, Barbed wire
etc. Total
Amount
8 Earthing material include earthing pipe, GI strip,GI plate.
Erection of stay set.(4nos per DP) Sr
Description of work Scope Unit
Quantity
Rate Amount
No.
1
Shifting of stay set to execution site from lpte store with transportation.
2
Making stay foundation as per BSPDCL standard with excavation(0.4cum), proper concreting (1:3:6) & muffing.
3 Foundation details-0.6m width X 0.6m breadth & 0.8m depth
Contractor Nos 320
(i.e. 0.2CUM per stay) with supply of all civil material.
4 Erection of new stay set with all accessories.
5 Fitting of necessary hardwares,stay clamp on pole, Guy
insulators, turn buckles, stay rod & plate.(As per site conditions)
6 Supply of Material such as stay clamp, Guy insulators, turn
Total Amount
buckles, stay rod & plate etc. Augumentation of 200kva to 315kva with replacement of DP structure. Sr
Description of work Scope Unit
Quantity
Rate Amount
No.
1
Activity Work scope include all labour charges for erection of DP+DT + LTDB+ DT meter +LA +1Core LT cable
Loading of 315KVA DT,AB switch, HG fuse, LTDB,LA and DT
2 Meter all other suitable accessories such as ,cable for
connection ,cable end terminations from LPTE store .
3 Unloading of above accessories at execution site .
4 Use of Hydra for loading and unloading.(Including labour).
8
Annexure - I
Transportation of all material( DT,AB switch, HG fuse, LTDB and 5 DT Meter all other suitable accessories )
from LPTE store to execution site is in
your scope.
6 Removing of LT ,HT cable,LTCT, Kitkat fuse of old DT.(only labour
Contractor nos 80
charges with toolkit)
Replacement of old DT , LTCT, fuse by NEW DT, LTCT & fuse
7 respectively .And fixing of old AB switch, HG fuse, LA,LTDB etc
on new DP.
8
Structural steel erection on DP including painting & supply of paint.
Erection,testing & commissioning of 315KVA DT & related AB
9
switch, HG fuse, LA,LTDB and DT Meter all other suitable accessories on PSC pole DP . It also includes jumpering with
ACSR wolf conductor.
10
Loading of old DT ,poles, LTCT, fuse etc from site and unloading at SBPDCL store.
11 Supply of material such as DT, AB switch, HG fuse, LA , LTDB, DT
Total Amount
meter, cable, power channels, conductor etc
21,22-199
Erection of New DP Rail pole 11m for erecting 315/500KVA DT
Sr Description of work Scope Unit
Quantity
Rate Amount
No.
1 Shifting of Rail poles & allied accessories such as earthing
material to execution site from lpte store with transportation.
2
Making pole foundation as per BSPDCL standard with excavation, proper concreting (1:4:8) & muffing.
Foundation details-0.6m width X 0.6m breadth & depth 1/6th of
3 pole length (i.e. 0.65CUM per pole) with supply of all civil Contract
or Nos
371
material.
4 Erection of new DP structure with rail pole.
5
Labour work 4 nos of Pipe earthing for pole with supply of charcoal & salt.
Fitting of necessary hardwares, power channels, Barbed wire,
6 danger boards, jumpering arrangement on poles.(As per site
conditions)
7 Supply of Material such as rail pole Pole, Danger Boards, Barbed
wire etc. Total
Amount
8 Earthing material include earthing pipe, GI strip,GI plate.
Painting of rail pole with supply of Red oxide,thinner and aluminium paint, will be under contractor scope subject to produce of paint
Erection of stay set.(4nos per DP) Sr
Description of work Scope Unit
Quantity
Rate Amount
No.
1
Shifting of stay set to execution site from lpte store with transportation.
2
Making stay foundation as per BSPDCL standard with excavation(0.4cum), proper concreting (1:3:6) & muffing.
3 Foundation details-0.6m width X 0.6m breadth & 0.8m depth
Contractor Nos 1484
(i.e. 0.2CUM per stay) with supply of all civil material.
4 Erection of new stay set with all accessories.
5 Fitting of necessary hardwares,stay clamp on pole, Guy
insulators, turn buckles, stay rod & plate.(As per site conditions)
6 Supply of Material such as stay clamp, Guy insulators, turn
Total Amount
buckles, stay rod & plate etc.
Erection of new DSS(315KVA & 500KVA) with complete accessories Sr
Description of work Scope Unit Quantity Rate Amount
No.
1
Activity Work scope include all labour charges for erection of DP+DT + LTDB+ DT meter +LA +1Core LT cable
Loading of 200KVA DT,AB switch, HG fuse, LTDB,LA and DT
2 Meter all other suitable accessories such as ,cable for
connection ,cable end terminations from LPTE store .
3 Unloading of above accessories at execution site .
4 Use of Hydra for loading and unloading.(Including labour).
9
Annexure - I
Transportation of all material( DT,AB switch, HG fuse, LTDB and
5 DT Meter all other suitable accessories ) from LPTE store to
execution site is in your scope. 6 Cable laying charges 7 1)1C X 300 sqmm per DT(DTR to LTDB)
8 1)1C X 150 sqmm per DT(outgoing) Contract
or 9 Indoor end termination charges
10 1) (1c x 300 sqmm)cable 11 1) (1c x 150 sqmm)cable
12
Structural steel erection on DP including painting & supply of paint.
Erection ,testing & commissioning of 315KVA DT & related AB
13
switch, HG fuse, LA,LTDB and DT Meter all other suitable
nos
321
accessories on rail pole DP . It also includes jumpering with ACSR
wolf conductor.
Erection ,testing & commissioning of 500KVA DT & related AB
14
switch, HG fuse, LA,LTDB and DT Meter all other suitable
nos
50
accessories on rail pole DP .It also includes jumpering with ACSR
panther conductor.
15 Supply of material such as DT, AB switch, HG fuse, LA , LTDB, DT
Total Amount
meter, cable, power channels, conductor etc
20-199
Erection of New DP PSC pole 400kg, 9m for erecting
200KVA DT Sr
Description of work Scope Unit
Quantity
Rate Amount
No.
1 Shifting of PSC poles & allied accessories such as earthing
material to execution site from store with transportation.
Making pole foundation as per BSPDCL standard with
2 excavation(0.6mx0.6mx1.5m = 0.54cum), proper concreting
(1:4:8) & muffing.
Pole Foundation details-0.6m width X 0.6m breadth & 1.2m
3 depth (i.e. 0.44CUM per pole) with supply of all civil material &
Contractor Nos 327
muffing.
4 Erection of new DP structure with 9m PSC pole.
5
Labour work 4 nos of Pipe earthing for pole with supply of charcoal & salt.
Fitting of necessary hardwares, power channels, Barbed wire,
6 danger boards, jumpering arrangement on poles.(As per site
conditions)
7
Supply of Material such as PSC Pole, Danger Boards, Barbed wire
etc. Total
Amount
8 Earthing material include earthing pipe, GI strip,GI plate.
Erection of stay set.(4nos per DP) Sr
Description of work Scope Unit
Quantity
Rate Amount
No.
1
Shifting of stay set to execution site from store with transportation.
2
Making stay foundation as per BSPDCL standard with excavation(0.4cum), proper concreting (1:3:6) & muffing.
3 Foundation details-0.6m width X 0.6m breadth & 0.8m depth
Contractor Nos 1308
(i.e. 0.2CUM per stay) with supply of all civil material.
4 Erection of new stay set with all accessories.
5 Fitting of necessary hardwares,stay clamp on pole, Guy
insulators, turn buckles, stay rod & plate.(As per site conditions)
6 Supply of Material such as stay clamp, Guy insulators, turn
Total Amount
buckles, stay rod & plate etc. Erection of new 200kva DSS with complete accessories Sr
Description of work Scope Unit
Quantity
Rate Amount
No.
1
Activity Work scope include all labour charges for erection of DT + LTDB+ DT meter +LA +1Core LT cable etc
10
Annexure - I
Loading of 200KVA DT,AB switch, HG fuse, LTDB,LA and DT
2 Meter all other suitable accessories such as ,cable for
connection ,cable end terminations from store .
3 Unloading of above accessories at execution site .
4 Use of Hydra for loading and unloading.(Including labour).
Transportation of all material( DT,AB switch, HG fuse, LTDB and
5 DT Meter all other suitable accessories ) from store to
execution site is in your scope.
6 Cable laying charges Contract
or Nos 327 7 1)1C X 300 sqmm per DT(DTR to LTDB) 8 1)1C X 150 sqmm per DT(outgoing) 9 Indoor end termination charges
10 1) (1c x 300 sqmm)cable 11 1) (1c x 150 sqmm)cable
12
Structural steel erection on DP including painting & supply of paint.
Erection ,testing & commissioning of 200KVA DT & AB switch,
13 HG fuse, LA,LTDB and DT Meter all other suitable accessories on
PSC pole DP . 14 Jumpering with ACSR DOG conductor.
Supply of material such as DT, AB switch, HG fuse, LA , LTDB, DT
Total
Amount
meter, cable, power channels, conductor etc
Schedule NO.8, 10A, 11, 14A, 17-199
HT CABLE RATE FOR 198,199 PROJECT
Sr Excavati
on
Excavation
Excavatio Excavation
Rate Laying
Particulars Unit Rate
(Soft n Rate
No details (Asphal
t/T (Concrete) Rate Soil) ar
Road)
(Depth X HT CABLE Width X Length)
1 33KV,3C X 400 sqmm
1 RUN
(0.9 X 0.4 X
Mtr
1)
2 RUN
(0.9 X 0.5 X
Mtr
1)
3 RUN
(0.9 X 0.6 X
Mtr
1)
4 RUN
(0.9 X 0.7 X
Mtr
1)
5 RUN
(0.9 X 0.8 X
Mtr
1)
6 RUN
(0.9 X 0.9 X
Mtr
1)
7 RUN
(0.9 X 1.0 X
Mtr
1)
(Depth X 11KV,3C X 300 sqmm Width X
2 Length)
1 RUN
(0.9 X 0.4 X
Mtr
1)
2 RUN
(0.9 X 0.5 X
Mtr
1)
3 RUN
(0.9 X 0.6 X
Mtr
1)
4 RUN
(0.9 X 0.7 X
Mtr
1)
5 RUN
(0.9 X 0.8 X
Mtr
1)
6 RUN
(0.9 X 0.9 X
Mtr
1)
7 RUN
(0.9 X 1.0 X
Mtr
1)
(Depth X 11KV,3C X 95 sqmm Width X
3 Length)
1 RUN
(0.9 X 0.4 X
Mtr
1)
11
Annexure - I
TOTAL COST OF HT CABLE * Work Scope 1. Loading of cable DRUM, , barigates from central store using hydra &
labour at transporting vehicle. 2. Shifting of cable drum from store to execution site by vehicle. 3. Unloading cable drum , barrigates at Execution site and laying of the
same. 5. For single run -12nos bricks to be used as per EIC instructions. 5. For double run -20nos bricks to be used as per EIC instructions. 4. Cable to be lay down between 100mm sand bed (i.e. 3cft sand per
metre) & necessary back filling & ramming. 5.Distance of site from store. (10-
15km)
5. Disposal of debris with crediting empty drums, barrigates at central store.
Quality of sand, bricks should be verified from EIC. Material suppiles by SCIPL - HT cable, GI pipe, Hardware & clamps. Jumpering accessories. Material suppiles by subcontractor- Sand, Bricks, Cable route marker & all tools -tackles. Note - 1.All above mentioned scope is tentative and will be changing as per site conditions. Details of Work:- 1. For 1 RUN - 16 Nos. bircks and ganga river sand 3 CFT will be used per
meter as per EIC norms 2. For 1 RUN - 28 Nos. bircks and ganga river sand 4 CFT will be used per
meter as per EIC norms 3. For 1 RUN - 40 Nos. bircks and ganga river sand 5 CFT will be used per
meter as per EIC norms 4. For 1 RUN - 52 Nos. bircks and ganga river sand 6 CFT will be used per
meter as per EIC norms 5. For 1 RUN - 64 Nos. bircks and ganga river sand 7 CFT will be used per
meter as per EIC norms 6. For 1 RUN - 76 Nos. bircks and ganga river sand 8 CFT will be used per
meter as per EIC norms 7. For 1 RUN - 88 Nos. bircks and ganga river sand 9 CFT will be used per
meter as per EIC norms
8, 10A, 11, 14A, 17-199 r.
No Description Unit Rate Three Core Cable Straight Through Joints
1 33 KV St. joint Nos 2 11 KV St. joint Nos
Three Core Cable End Termination
1 33 KV XLPE ID / OD Nos 2 11KV XLPE ID/OD Nos
Total Amount- Service tax will be paid extra as per actual. Shifting of joint kit from store to execution site is in subcontractor scope.You have to submit Labours/ helper for cable joint work will be in your scope. Labour for excavation and taking cable above the trench will be in scope. Material suppiles by ----------------joint kit, Material suppiles by subcontractor- Kerosene, cottons & all tools -tackles.