energy modeling train the trainer modeling the planet and the primary mediator – residential,...

Post on 06-Jan-2018

227 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

DESCRIPTION

Standard Facility Assessment Protocol Measure estimated savings for a retrofit package Prioritize measures in terms of cost from low hanging fruit to ridiculous Understand building performance calibrations with respect to behavior, equipment and envelope Rating comparisons by kWh/m2/yr. (default) Develop a standard for energy performance contract and follow-up M&V Justification for upgrades relative to building codes, Energy Star, LEED and others Estimate greenhouse gas emissions for climate action planning and other measurement methods and measure the resulting improvement to scientifically compare

TRANSCRIPT

Energy Modeling Train the Trainer

Modeling the planet and the primary mediator – residential, commercial

and industrial buildings

Energy and Sustainable O&M, Development, Design and Policy in Hawaii

Proposed methodology, procedures and validations

Standard Facility Assessment Protocol

• Measure estimated savings for a retrofit package• Prioritize measures in terms of cost from low hanging fruit to ridiculous • Understand building performance calibrations with respect to behavior,

equipment and envelope • Rating comparisons by kWh/m2/yr. (default)• Develop a standard for energy performance contract and follow-up M&V• Justification for upgrades relative to building codes, Energy Star, LEED and

others • Estimate greenhouse gas emissions for climate action planning and other

measurement methods and measure the resulting improvement to scientifically compare

Suggested Sequence

• Analyses Objectives = Hawaiian building objectives (maybe 20%?)

• Building orientation and regional weather • Building shell, structure, materials and shades • Operational schedule• Internal loads – people & equipment • HVAC performance

• School building• Central AC with some DX AC• Window shades• Low, med or high occupancy • Interruptible – uninterruptable power

supplies?• Lights – how automated – switched per fl.

etc.??

Insert a picture of the buildings here

eQuest

Schematic Design WizardPull up eQuest

www.doe2.com/equest/Version 3.65

top related