Scope of the Project
The Project shall cover 2 specific areas, namely:
I. Establishment of the CDM National Authority- the national shall endorse to the Executive Board and proposed
CDM projects that support national sustainable goals
II. Development of the Operational Framework of the NA
- will include definition of the legal and administrative requirements and the prescribed systems and procedures for securing the NA endorsement, among others.
Long Term Objectives
Achievement of the country’s sustainable development goals through economic growth anchored on a healthy and vibrant environment and the reduction of greenhouse gas, globally, resulting in the climate change mitigation
Poverty alleviation through the enhancement of capacity of sectors (ie. energy, agriculture and forestry) to increase their contribution to the country’s economy through a mechanism like the CDM
Immediate Objectives
To secure the official designation of a national government entity as the National Authority for CDM
To formulate the CDM Operational Framework
Project Benefits
Will usher the entry of an emerging global industry spearheaded by the private sector through the transformation of GHG mitigation into investment opportunities in support of the country’s sustainable development aspirations
Potential investors will recognize the advantages and benefits of transacting CDM business in the Philippines, resulting to more investments coming in, in the future.
Project Beneficiaries National government agencies who will be involved in the
CDM implementation process in the Philippines
Industries/private sector and other CDM project proponents – recipients of additional capacity building, new technologies and project funding
Consuming public – intended users of the resulting products and services generated by the CDM process.
Project Implementation
A1 Establishment of the National Authority
Immediate Objective:To secure the official designation of the
appropriate governmental entity as the National Authority for CDM in the Philippines
Output:A legal Issuance Designating the National
Authority for the CDM process in the Philippines
PROPOSE CDM NATIONAL INSTITUTIONAL ARRANGEMENT
DENR
IACCC
EXECUTIVE BOARD
CDM SECRETARIAT
TECHNICAL EVLUATION COM.
ENERGY
TECHNICAL EVLUATION COM.
SOLID WASTE
TECHNICAL EVLUATION COM.
LULUCF
APPLICATIONFOR PROJECTS
Activity A1.1• Consultations with stakeholders, the IACCC, and legal experts
in the designation of the CDM NA3 Selection options:
- a legal opinion from the Office of the President on the extent of coverage of the existing mandate of the contemplated entity- revision of the Administrative Order on the existing legal issuance to cover the additional functions as NA.- issuance of the President of a Memorandum Order for this additional task
• Work through formal mechanisms and concerned institutions to issue the legal document during the initial phase of the project
• Draw the appropriate and necessary organizational structure and its institutionalization
Project Implementation
Project Implementation
A2 Development of the National CDM Operational Framework
Immediate Objective:
To enable the optimum and efficient functioning of the NA through the provision of a clear National CDM Operational Framework
Output:
National Authority’s Management System
Activities for A2
• Review past and available literature on the existing policies and identify gaps and constraints, and provide recommendations to address these gaps to facilitate entry and implementation of CDM projects
• Craft new/supplementary policies and legal issuances to address the identified gaps and constraints
• Adopt national sustainable development criteria and indicators for use in the CDM assessment process.
• Develop Systems and Procedures, with clear accountabilities and timeframes within the NA system– A business “process map”
Project Implementation
Activities for A2 (Continued)• Develop protocols and supplementary tools to implement
the systems and procedures
• Develop the documentary requirements of the NA to enable it to assess the CDM proposal and issues the necessary endorsement to the CDM Executive Board
• Pilot test the designated management system
• Prepare and issue the necessary legal and administrative issuances to operationalize the management system
Project Implementation
Risks and Conditions
• Delay in the Creation of the National Authority resulting from the current administration’s priority for 2004 election-related preparatory activities
- however, all other activities relating to the development of the operational framework can proceed even while the NA designation is being worked out.
- an Administrative Order was already drafted and under review by the DENR Legal Affairs Office.
0. Institutional Strengthening of DNA
(will be assisted by Netherlands Govt..)
Establishment of the CDMNational Authority
CDM operational framework
(will be assisted by Netherlands Govt..)
1. National authority’s management system
1. CDM Project Promotion
Information Collection CDM projectpromotion policy
Output 1Case Studies onsmall scale CDM projects
Streamlined standard baseline and Monitoring methodologies for smallscale CDM Projects
1. Development of streamlined standard methodologies2. Development of emission factors specific to the Philippines
1. Survey on legal framework2. Collect related data necessary for CDM-PDD preparation3. Survey on situations of ASEAN countries etc.
1. Priorities of CDM projects criteria(sectors, area, technology needs)2. CDM project promotion measures
Output 2
Financial development for local CDM participants
Output 3
Web-based CDMinformation clearinghouse
Output 4
2. Training workshops on CDMPreparing training materials
Organizing CDM workshops
(JICA)
Thank Thank you.you.Joyceline A. Goco
Head, Inter-Agency Committee on Climate Change SecretariatDENR -- EMB 2nd Flr. HRD Bldg. DENR CompoundVisayas Avenue, DilimanQuezon City, PhilippinesTel # (632) 920-2251/925-4797 loc. 2Fax (632) 920-2251 to 52e-mail address: joygoco@yahoo.com
top related