ICE Coventry & Warwickshire Event: “Eurocodes: Are you being left behind?”

TRANSCRIPT

Eurocodes for the assessment of the existing structures.

RWS Managing Contractor

Agenda:

1. Introduction� Bridges

� Defects

� Proposed Solution

2. Use of Eurocodes in Assessment.

2

2. Use of Eurocodes in Assessment.� Lane arrangement

� Load Factors

� Reduction Factors

Introduction

� Joint Venture : Royal Haskoning, Arup, Greisch

� Client : Rijkwaterstaat

� 8 Major bridges in the Netherlands fatigue and strength issues

� Renovation over an 8 year programme

� To give 30 yrs. further useful life.

3

� Concrete overlay already decided solution for fatigue

Bridges

4

•Waalbrug Ewijk

5

•Waalbrug Ewijk

6

Defects

� Orthotropic Decks

� Fatigue Problems

7

8

9

Proposed Solution

10

11

Eurocodes

12

National Annexes

Design Memos

Eurocodes used for the assessment:

� Eurocode 0: Basis of structural design - NEN1990

� Eurocode 1: Action on the structures - NEN1991

� Eurocode 2: Design of concrete structures - NEN1992

� Eurocode 3: Design of steel structures - NEN1993

� Eurocode 4: Design of composite steel and concrete structures

- NEN1994

13

- NEN1994

Lane arrangement on the bridge:

14

Lane arrangement on the bridge:

12.25 m

3.0 m 3.0 m 3.0 m 3.0 m

12.25 m

3.0 m 3.0 m 3.0 m 3.0 m

15

3.0 m 3.0 m 3.0 m 3.0 m 3.0 m 3.0 m

Load Factors:

16

Load Factors:

Action Default values

from Eurocode

Dutch National

Annex

Modified values for

assessment

Permanent Load 1.35 1.5 1.25 (6.10a)

1.10 (6.10b)

Variable Traffic

Load

1.35 1.5 1.10 (6.10a)

1.25 (6.10b)

17

Other Variable Load 1.5 1.65 1.2 (6.10a)

1.5 (6.10b)

Reduction factors.

� Shortening of the reference design life

� Trend reduction in load magnitude

18

Shortening of the reference design life:

0.96

1.0

19

Reference period Reduction factor

100 years 1.00

15 years 0.95

1.0 years 0.88

Month 0.82

Trend reduction in live load magnitude:

Influence

length L

[m]

2000 2010 2020 2030 2040 2050

0 1.00 1.00 1.00 1.00 1.00 1.00

20 0.89 0.91 0.93 0.96 0.98 1.00

20

50 0.82 0.86 0.89 0.93 0.96 1.00

75 0.78 0.83 0.87 0.91 0.96 1.00

100 0.76 0.81 0.85 0.90 0.95 1.00

150 0.75 0.80 0.85 0.90 0.95 1.00

200 0.75 0.80 0.85 0.90 0.95 1.00

Trend reduction in live load magnitude:

Influence

length L

[m]

2000 2010 2020 2030 2040 2050

0 1.00 1.00 1.00 1.00 1.00 1.00

20 0.89 0.91 0.93 0.96 0.98 1.00

30 years

21

50 0.82 0.86 0.89 0.93 0.96 1.00

75 0.78 0.83 0.87 0.91 0.96 1.00

100 0.76 0.81 0.85 0.90 0.95 1.00

150 0.75 0.80 0.85 0.90 0.95 1.00

200 0.75 0.80 0.85 0.90 0.95 1.00

Reduction factors.

� Shortening of the reference design life

� Trend reduction in load magnitude

22

DL+0.96 x 0.95 x LL