References 1
The world of colours 2
Product information 3
Fixing methods 4
Processing instructions 5
Metawell GmbH 6
Approvals and Environmental Product Declarations 7
Planning aids
• Bolt system 8
• Rail system 9
• Glueing system 10
Facade
References
REFERENCES
References
BF20e-2017/08Errors and omissions excepted 02
projectclientarchitectclientarchitect
Ayandeh Bank, Teheran (Iran)Armani economics groupArmani Architectural Dep.
References
BF20e-2017/08Errors and omissions excepted 03
projectclientarchitect
Boulevard Expo, Astana (Kazachstan)INK ArchitectsIBRAYEV ALIBEK
architect photographer
References
BF20e-2017/08Errors and omissions excepted 04
projectclientarchitectarchitect
„Zerres Logistikzentrum“, MönchengladbachSchrammen Architekten BDA
References
BF20e-2017/08Errors and omissions excepted 05
projectclientarchitect
VIB Vermögen AG, NeuburgVIB Vermögen AG, Neuburg architect
References
BF20e-2017/08Errors and omissions excepted 06
projectclientarchitect
Iran Mall, Teheran (Iran)Alborz Tat Construction Development Co.
References
BF20e-2017/08Errors and omissions excepted 07
projectclientarchitect
Tuchfabrik Berlinnps tchoban voss GmbHMetallbau Windeck GmbH
architect facade construction
© Greg Bannan
© Greg Bannan
References
BF20e-2017/08Errors and omissions excepted 08
projectclientarchitectarchitect facade constructionphotographer
The Classic Oldtimer Hotel, Ingolstadt adam architekten, MünchenG+H Fassadentechnik GmbH, HamburgFlorian Schreiber
References
BF20e-2017/08Errors and omissions excepted 09
projectclientarchitect
„Neubau Forschung“ Weishaupt GmbHMax Weishaupt GmbHZG Architekten GmbH, UlmDaniel Scheffold
architectsphotographer
References
BF20e-2017/08Errors and omissions excepted 010
projectclientarchitect
simatec ag simatec agStefan MarthalerNEBA Therm AG
photographerfacade construction
References
BF20e-2017/08Errors and omissions excepted 011
projectclientarchitect
Joycity Yantai, ChinaCOFCO Land Holdings LimitedCallsionYUANDA Façadefacade construction
References
BF20e-2017/08Errors and omissions excepted 012
projectclientarchitect
smart optics Friemel Fuhrmann Grundstücks GbrPlassmeier GmbHAlubau Puhlmannfacade construction
References
BF20e-2017/08Errors and omissions excepted 013
projectclientarchitect
Tbilisi Prosecutor‘s Office (TPO)The Ministry of Justice of GeorgiaArchitects of InventionEurofasad Ltd.Mari Nakani-Mamasakhlisi
facade constructionphotographer
References
BF20e-2017/08Errors and omissions excepted 014
projectclientarchitect
IGM WolfsburgIGM WolfsburgSchneider + Schumacher, FrankfurtJörg Hempelphotographer
References
BF20e-2017/08Errors and omissions excepted 015
projectclientarchitect
MHK KielMüllverbrennung Kiel GmbH + Co. KGUlrich Steuber, OsdorfWällerphotographer
References
BF20e-2017/08Errors and omissions excepted 016
projectclientarchitect
PSD Bank RegensburgPSD Bank RegensburgDömges Architekten AG, RegensburgStefan Hankephotographer
The world of colours
The world of colours
The world of colours
Whether plain or metallic colours to RAL, Pantone, NCS or BS: You have theChoice! On request also own concepts with special colours can be realized together. For all colours only high quality paint systems are used. Further information is availa-ble in the colour-chart “Architectural Colours“Important: When planning and fitting coil-coated facade elements, in particular in the case of metallic paints, it must be ensured that the direction of the elements and the direction in which the paint is applied are the same. The so-called "flop effect" could spoil the uniform appearance of the elements if they are positioned in different directions. To prevent this, the panels are labelled with an arrow on the reverse side. This effect can also be seen if the direction in which the panels are fitted changes from horizontal to vertical, e.g. if individual panels in the facade are turned through 90° before fitting.
Coil-coating
Paint systemPVDF
(Polyvinylidene fluoride)HDP-Polymer
(High-Durable-Polymer)
Painting methodCoil-coatingCoil-coating
Coil-coatingCoil-coating
Gloss level 30 ± 5 units 30 ± 5 units
Colour
Metallic coloursRAL and NCSwith a few exceptions
Metallic coloursRAL, NCS and
series of natural aluminium shades with a few exceptions
Corrosion-resistance very good very good
Colour fastness very good good
Gloss retention very good good
Weather resistance very good good
„Greenest“
solution
for your
aluminium-
facdade
+ =Metawall® =
Sustainable and fully
recycable
coil coating
=
green technology
BF20e-2012/12Modifications and errors reserved 02
WORLD OF COLOuRS
The world of colours
BF20e-2012/12Modifications and errors reserved 03
WORLD OF COLOuRS
Possible paint systems
Paint systemPVDF
(2K fluoropolymer resin)2K-PuR
(2K polyurethane system)
Painting method Spray-painting (wet) Spray-painting (wet)
Gloss level 30 ± 5 units 60 ± 5 units
Colour
Metallic coloursRAL, Sikkens and NCS
with a few exceptions
Metallic coloursRAL, Sikkens and NCS
with a few exceptions
Corrosion-resistance very good good
Colour fastness very good good
Gloss retention very good good
Weather resistance very good good
Spray-painting Spray-painted metallic finishes in particular have very attractive bright colours, visual depth and colour shades that vary depending on the light and the angle from which they are viewed. This effect is created by a varying alignment of the metallic pigments. This often creates lighter and darker shading on each facade panel or from one component to another. Light and dark contrasts on a painted surface also occur when the surfaces do not lie in the same angle to the level of observation.
The world of colours
BF20e-2012/12Modifications and errors reserved 04
WORLD OF COLOuRS
For small-area facades, Metawall® can be tailored to the colour concept of the const-ruction project by means of spray-painting.
Thanks to its‘ primered surface (hl), Metawall® can be sprayed directly with a suitable top coat with no pre-treatment required.
However, with some shades, an additional pre-treatment with a primer may be ne-cessary. Therefore it is strongly recommend to try out the selected paint system and colour shade on sample panels.
The following specifications and notes must be observed. • The temperature limit for forced drying in an oven is +100° C and must not be exceeded.
• Metawall® is delivered with a protective film. Before commencing painting, check that the surfaces to be painted are free of soiling.
• The paint must be applied as stipulated in the paint manufacturer's instructions.
• The degree of gloss of the paint system selected should not be above 60 gloss units
• If the panels are post-painted, suspension tabs must be attached on the reverse side of the panels (number depending on the panel size).
• Post-painted Metawell® panels should not be used to make Metawall®, due to the lower elasticity of the top coat.
A list of paintshops can be supplied on request.
Painting process for spray-painting
The world of colours
BF20e-2012/12Modifications and errors reserved 05
WORLD OF COLOuRS
Powder-coating Powder-coated Metawall® combines a high degree of functionality with attractive design. The wide range of colours and surface textures offers you unlimited pos-sibilities to individually design the facade and thus the overall appearance of your building.On request Metawall® can be supplied for powder-coating. After cleaning, the powder-coatable panels, which are already primered, can be coated without further pre-treatment. Here, the temperature limit is +200 °C. However, some shades may require an additional pre-treatment with a primer may be necessary. We therefore strongly recommend that you try out the selected paint system and colour shade on sample panels.
Possible powder systems
Powder system
HWF - PES(Highly weather-resistant
polyester resin in accordance with GSB)
PES (Polyester resin in
accordance with GSB)
Painting methodelectrostatic
powder-coatingelectrostatic
powder-coating
Gloss level matt to glossy matt to glossy
ColourMetallic colours
RAL, Sikkens and NCSwith a few exceptions
Metallic coloursRAL, Sikkens and NCSwith a few exceptions
Corrosion-resistancevery good
acc. to AAMA 605.2-92good
acc. to AAMA 605.2-92
Colour fastnessvery good
acc. to GSB Cl.2good
acc. to GSB Cl. 1
Gloss retentionvery good
acc. to GSB Cl. 2good
acc. to GSB Cl. 1
Weather resistancevery good
acc. to ISO 2810good
acc. to ISO 2810
Powder-coating companies Recommendation
Klaus Stahl Industrielackierungen GmbHIm Lettenhorst 2D - 67105 SchifferstadtTel: +49 6235 / 4908 - 0Fax: +496235 / 4908 - 27Internet: www.stahlgmbh.comE-mail: info@stahlgmbh.com
Vogt Lackiertechnik GmbHIndustriestraße 11D - 92339 BeilngriesTel. +49 8461 / 6 06 04 - 0Fax. +49 8461 / 6 06 04 - 66Internet: www.vogt-lackiertechnik.deE-mail: info@vogt-lackiertechnik.de
LOV Limbacher Oberflächenveredlung GmbHSachsenstraße 31D - 09212 Limbach-OberfrohnaTel: +49 3722 / 7764 - 02Fax: +49 3722 / 7764 - 15Internet: www.lov.deE-mail: info@lov.de
The world of colours
BF20e-2012/12Modifications and errors reserved 06
Cleaning and maintenance
The products are delivered with a protective film. This film is applied to provide protection during transport and should be removed at the latest 6 months after delivery. Strong temperature fluctuations and exposure to direct sunlight can reduce the durability of this film. If the protective film peels off some areas of the panel, for example during further processing or fitting, dirt may accumulate at the edges of the film over time, and such dirt rims are difficult or even impossible to remove.
Caution:Markings or labelling applied to the film using, for example, Edding markers or other la-belling devices, may in certain circumstances penetrate the film and damage the coating.
When cleaning the coated surface, the respective paint system and the type of soi-ling must be taken into consideration. under no circumstances may abrasive, orga-nic, solvent-based, highly acidic, alkaline or chlorous cleaning agents be used. After cleaning, the surfaces must be rinsed well with water and dried. See also Leaflet A5 "Reinigung von Aluminium im Bauwesen“ (cleaning of aluminium in construction) from the GDA Gesamtverband der Aluminiumindustrie e.V. and the supplementary list of neutral cleaning agents, published by the Gütegemeinschaft für die Reinigung von Metallfassaden e. V. Nuremberg.
Important note on the protective film
Repairs As a fundamental rule: Repair work may only be carried out by a specialist com-pany. The touch-up paint should first be tried out on an inconspicuous part of the facade.
Please contact the paint manufacturer or paintshop for details of suitable touch-up paints.
Colour samples As a rule, colour samples placed at the disposal of customers are laboratory samples and may differ in their appearance (degree of gloss, shade, etc.) and surface texture from the actual product.
WORLD OF COLOuRS
product information
Product information
product information
L ist of contents
Page
PRODUCT INFORMATION IN GENERAL 03
•innovative materials of Metawell GmbH 03
•sustainability and recycling 03
•Production scheme 04
•Panel structure 04
METAWALL® 05
•Design 05
•Metawall® variant i 06
•Metawall® variant ii 07
•Metawall® A2 08
METAWELL® FACADE PANEL 09
GENERAL NOTES 10
•Delivery and storage 10
•Protectivefilm 10
•errors and omissions excepted 10
•fire protection 11
•Lightning protection 11
product information
BF20e-2017/01Modifications and errors reserved 03
thanks to the brilliantly simple design a very lightweight and extremelybending-resistant aluminium sandwich panel is created. thanks to its properties it is perfectly suitable for the use as a curtain wall facade.
the continuous manufacturing process allows a production of big panels with an planesurface,whichstayflatevenwhenusedinlargeformats.
With few exceptions, various colours can be selected for the visible surfaces e.g. RAL, ncs, Bs and Pantone. customised colours are available on request.
the principle diagrams below show design examples for a suitable use of Metawall®. Project planning support with detailed technical literature can be offered and individual consultations be arranged in order to develop constructive solutions tailored to customer requirements.
Important: Differences in the legal stipulations in individual countries may mean thatinindividualcases,theapplicabilityneedstobetestedandverified.IntheFederalRepublicofGermany,theserequirementsaredefinedinDIN18516"Au-ßenwandbekleidungen, hinterlüftet.“ the applicable regional building laws and technicalspecificationsmustalsobeobserved! thanks to the company's many years of experience, all products of Metawell GmbH meet the highest quality requirements and are subject to continuous quality control and further technical development.
Note:„Metawall®“ replaces the previous product „Metawell®“ facade element BK.
Innovative materials of Metawell GmbH
in reference to sustainability Metawall® commentds itself by:
• long life and low maintenance• weather and corrosion resistance• low weight• already high proportion of recycled aluminium (no quality loss)• full recycability without previous material separation
TheseproductfeaturesareconfirmedbytheEnvironmentalProductDeclarationaccording to Din en iso 14025 type iii and en 15804.
Sustainability and recycling
PRoDUct infoRMAtion in GeneRAL
product information
BF20e-2017/01Modifications and errors reserved 04
Panel height Hsurface (primer)thickness of the lower cover sheet t2thickness of the corrugation material twthickness of the upper cover sheet t1surface (coil-coating)ProtectivefilmMaterial
Production scheme
PRoDUct infoRMAtion in GeneRAL
sfthe panel designation shows the panel structure:
Panel structure
Panel formats Width: 1500 mm, 1250 mm and 1000 mm (other lengths on request) Length: up to max. 6000 mm (other lengths on request)
product information
Vertical section, bolting system
Ventilation gap
BF20e-2017/01Modifications and errors reserved 05
Metawall® is made from the 10 mm Metawell® panel.
it is manufactured on the premises of Metawell GmbH according to customer specifications.
Rectangular or square openings and cut-outs can be made in the same way as the edges of Metawall® element.
At points where this is not possible, the cut edges remain open. it is recommended that these details should be designed with shadow gaps right from the planning phase.
Important: Metawall® is manufactured with a ventilation gap on the reverse side. it must be ensured that any water which might penetrate (including any condensation) can drain off at all times, and for this reason, the substructure must not close off this gap.
Asafundamentalrule,becauseoftheedgedesign,thesizeofthefinishedMetawall® should not be subsequently changed.
Design
MetAWALL®
product information
BF20e-2017/01Modifications and errors reserved 06
Designation: Metawall® Variant i: sf cc 10-03-05 hlthickness: 10 mm ± 0.2 mm Weight: 5.7 kg/m2 Coefficientoflinearexpansionα: 24*10-6 K-1 (see example) temperature resistance: - 40 to +100 ° c
example of the linear expansion (for panel formats)from -20°c to +80°c =100 Kelvin temperature differenceLinear expansion due to heat: 0.024 x 100 x 1 m: 2.4 mm per 1 metre length
orientation of the corrugation
compressive strength n/mm2
in accordance with Din 53291Bending resistance nmm2/mmin accordance with Din 53293
longitudinaltransverse
≥ 3≥ 3.5
2.26 e +61.96 e +6
Technical data on the cover sheets variant I
thickness Alloy tensile strength Yield strength
Visible sideUnderside
1.0 mm0.5 mm
en AW-5754 H42en AW-5182 H48
≥ 220 n/mm2
≥ 330 n/mm2
≥ 140 n/mm2
≥ 300 n/mm2
Attachment with brackets: 1470 x 6000 mm (other lengths on request)sikatack®-Panel-system: 1470 x 4300 mm (other lengths on request)
MetAWALL®
Metawall® variant I
37.1 kg 26.2 kg 18.4 kg 5.7 kg
steel 4.7 mm thick
fibre cement11.4 mm thick
Aluminium6.8 mm thick
Metawall® 10 mm thick
Structural characteristics
Max. element formats
Fire classification Attachmentwithbrackets:DINEN13501:B-s2,d0(fireretardent)sikatack®-Panel-System: DINEN13501:C-s2,d0(fireretardent)
Comparison of the weight of various mate-rials with equal bending resistance
product information
BF20e-2017/01Modifications and errors reserved 07
Designation: Metawall®
Variant ii: sf cc 08-03-05 hlthickness: 10 mm ± 0.2 mm Weight: 5.2 kg/m2 Coefficientoflinearexpansionα: 24*10-6 K-1 (see example) temperature resistance: - 40 to +100 ° c
example of the linear expansion (for panel formats)from -20°c to +80°c =100 Kelvin temperature differenceLinear expansion due to heat:0.024 x 100 x 1 m: 2.4 mm per 1 metre length
MetAWALL®
Metawall® variant II
Structural characteristics
Max. element formats
Fire classification
Attachment with brackets: 1470 x 6000 mm (other lengths on request)sikatack®-Panel-system: 1470 x 4300 mm (other lengths on request)
Attachmentwithbrackets:DINEN13501:B-s2,d0(fireretardent)sikatack®-Panel-System: DINEN13501:C-s2,d0(fireretardent)
orientation of the corrugation
compressive strength n/mm2
in accordance with Din 53291Bending resistance nmm2/mmin accordance with Din 53293
longitudinaltransverse
≥ 3≥ 3.2
2.13 e +61.85 e +6
Technical data on the cover sheets variant II
thickness Alloy tensile strength Yield strength
Visible sideUnderside
0.8 mm0.5 mm
en AW-5754 H42en AW-5182 H48
≥ 220 n/mm2
≥ 330 n/mm2
≥ 140 n/mm2
≥ 300 n/mm2
product information
BF20e-2017/01Modifications and errors reserved 08
Designation: Metawall® A2 Variant: sf cc 10-03-10 hlthickness: 15 mm ± 0.2 mm Weight: 6.8 kg/m2 Coefficientoflinearexpansionα: 24*10-6 K-1 (see example) temperature resistance: - 40 to +100 ° c
example of the linear expansion: panel formatsfrom -20°c to +80°c =100 Kelvin temperature differenceLinear expansion due to heat:0.024 x 100 x 1 m: 2.4 mm per 1 metre length
1460 x 6000 mm (other formats on request)
MetAWALL®
Metawall® A2
Max. element formats
Fire classification Din en 13501: A2 - s1, d0 (non combustible)
Metawall® A2 horizontal section
product information
BF20e-2017/01Modifications and errors reserved 09
MetAWeLL® fAcADe PAneL
1500 x 6000 mm (other formats on request)Panel formats
Metawell® facade panel
DINEN13501:B-s2,d0(fireretardent)Fire classification
Variant I
Technical data of the panel
Variant: i and ii Coefficientoflinearexpansionα: 24*10-6 K-1 (see example) temperature resistance: - 40 to +100 ° c
example of linear expansion: panel formatsfrom -20°c to +80°c =100 Kelvin temperature differenceLinear expansion due to heat:0.024 x 100 x 1 m: 2.4 mm per 1 metre length
thickness Alloy tensile strength Yield strength
Visible sideUnderside
1.0/0.8 mm0.5 mm
en AW-5754 H42en AW-5182 H48
≥ 220 n/mm2
≥ 330 n/mm2
≥ 140 n/mm2
≥ 300 n/mm2
Metawell® Alu SF cc 10-03-05 hl / H10
Metawell® Alu SF cc 08-03-05 hl / H10
thickness: 10 mm ± 0.2 mm Weight: 5.7 kg/m2
Variant IIthickness: 10 mm ± 0.2 mm Weight: 5.2 kg/m2
Technical data on the cover sheets
orientation of the corrugation
compressive strength n/mm2
in accordance with Din 53291Bending resistance nmm2/mmin accordance with Din 53293
longitudinaltransverse
≥ 3≥ 3.5
2.26 e +61.96 e +6
orientation of the corrugation
compressive strength n/mm2
in accordance with Din 53291Bending resistance nmm2/mmin accordance with Din 53293
longitudinaltransverse
≥ 3≥ 3.2
2.13 e +61.85 e +6
product information
BF20e-2017/01Modifications and errors reserved 10
GeneRAL notes
Deliveries are made in closed chipboard or non-wood cases. Depending on the order the single coli may have a gross weight of more than 3000 kg. Any visible dama-ge of the packing has to be recorded immediately and stated in the receipt of the delivery for the carrier.
the products must be stored in a location protected against rain and snow in order to prevent water penetrating into the core. condensation as a result of strong fluctuationsintemperaturemustbeavoided,asitcausesstainsorcorrosion–wherenecessary, the facade panels must be dried.
to avoid denting the panels when they are stacked, only suitable materials may be inserted as intermediate layers (no polystyrene). the individual panels must be remo-ved from the stack without sliding them out.
the maximum permissible stacking height for the panels is 1500 mm.
We recommend the use of suitable gloves for handling in order to avoid soiling the panels and injuries.
Delivery and storage
Errors and omissions excepted
All illustrations and information given in this technical description represent the tech-nical state-of-the-art, our own experience and the results of testing. the information provided is without contractual obligation and does not represent any warranty of properties.
Reproduction of this description or parts of it is only permissible if authorised by Metawell GmbH.
Warrantyandliabilityexclusivelyasdefinedintherelevantversionofourgeneraldelivery conditions; this also applies to information provided orally in personal consultations.
Weacceptnoliabilityforerrors,omissionsorsubsequentmodifications.
Thepanelsaredeliveredwithaprotectivefilm.Thisfilmisappliedtoprovideprotec-tion during transport and should be removed at the latest 6 months after delivery. Protectivefilmwhichhasbeenexposedtoweatheringforalongtimeisextremelyhardtoremove.Forthisreason,thefilmshouldberemovedfromthepanelsassoonaspossibleafterassembly.Iftheprotectivefilmpeelsoffsomeareasofthepanel,forexampleduringfurtherprocessingorfitting,dirtmayaccumulateattheedgesofthefilmovertime,andsuchdirtrimsaredifficultorevenimpossibletoremove.
Caution:Markingsorlabellingappliedtothefilmusing,forexample,Eddingmarkersorotherlabellingdevices,mayincertaincircumstancespenetratethefilmandaffectthecoating.
Protective film
product information
Topreventfirespreadingoverseveralfloorsofabuilding,Germanbuildinglawspecifiesandthetechnicalbuildingspecificationsprescribetheinstallationoffirebarriers (e.g. made from sheet steel) in buildings of certain classes.
scuncheons of openings in the outside walls (doors, windows) may form an integral partoffirebarriers.
BF20e-2017/01Modifications and errors reserved 11
Lightning protection to prevent personal injury and damage to property the relevant national build- ing regulations, the building operator or the property insurer may require a risk assessment, which in Germany is carried out in accordance with VDe 0185-305-2: 2006-10.
since october 2006 the standards Din en 62305 (VDe0185-305) Part 1 to Part 4 have been applied as the basis for general lightning protection in Germany.
internet addresses for information on lightning protection:
www.blitzschutz.dewww.vdb.blitzschutz.com
Fire protection
fire barrier
Metawall® fulfilstherequirementsinaccordancewiththeclassificationofbuildingproductsandbuildingtypesaccordingtotheirfirebehaviourtoDINEN13501: •Attachmentwithbrackets:B-s2,d0(fireretardent) •SikaTack®-Panel-System:C-s2,d0(fireretardent)
Metawall® A2 fulfilstherequirementsinaccordancewiththeclassificationofbuil-dingproductsandbuildingtypesaccordingtotheirfirebehaviourtoDINEN13501: •A2-s1,d0(noncombustible)
GeneRAL notes
fixing methods
Fixing methods
fixing methods
BF20e-2017/01Modifications and errors reserved 02
F IXING METHODS METawall® varIaNT I + I I
The attachment of Metawall® can be realised with all appropriate substructure sys-tems.
To avoid dilatation noise caused by the normal relative movement of the elements as a result of wind and temperature changes, it may be necessary to use suitable acoustic insulation in the specific substructure systems selected. If facade cladding with open joints is prescribed, particular attention should be paid to the fact that rain and moisture can penetrate the joints.
The method by which the Metawall® is attached to the selected substructure must be defined according to the statical requirements.
The number of brackets depends on the bracket type, format and the wind load.
The brackets are attached to the reverse side of our facade elements with rivets. PolyGrip rivets 4.8 x 10 alu/Nirosta, art. No.: 6720145 manufactured by Gesipa must be used.
If the material thickness of the bracket is < 4.0 mm, a suitable washer must be inser-ted between the bracket and the rivet.
40
Bolt sytem
Attachment according to statical requirements
~10
mm
fixing methods
BF20e-2017/01Modifications and errors reserved 03
F IXING METHODS METawall® varIaNT I + I I
Technical data on the rivets
rivet PolyGrip rivet
Size / Material 4.8 x 10 alu/Nirosta
Clamping range 0.5 – 6.5 mm
Thickness of bracketsmin. 4.0 mmmax. 5 mm
Drill 4.9 mm
Manufacturer Gesipa
art. No. 6720145
Characteristics of the riveted connectionBolt system
Permissible rivet traction 147 N / rivet
Permissible rivet shearing force
240 N / rivet
Distance rivet axis - panel edge
≥ 26 mm
Distance rivet axis - rivet axis
≥ 40 mm
Bolt system Drilling: we recommend that you use a sleeve which prevents the drill penetrating too far, to ensure that the drill does not dent or break through to the visible side of the panel.
Rivet setting process: • The rivet is to be applied straight, at 90°• Ensure that the rivet head lies flat against the panel• On insertion, the rivet protrudes slightly. During the setting process, light pressure must be applied to press it in
A sample panel is available on request to allow you to familiarise yourself with the correct drilling and setting procedure in advance.
See the processing instructions for recommended rivet setting tools.
If the material thickness of the bracket is < 4.0 mm, a suitable washer must be insertedbetween the bracket and the rivet.
fixing methods
BF20e-2017/01Modifications and errors reserved 04
The attachment of Metawall® can be realised with all appropriate substructure sys-tems.
To avoid dilatation noise caused by the normal relative movement of the elements as a result of wind and temperature changes, it may be necessary to use suitable acoustic insulation in the specific substructure systems selected. If facade cladding with open joints is prescribed, particular attention should be paid to the fact that rain and moisture can penetrate the joints.
The method by which the Metawall® is attached to the selected substructure must be defined according to the statical requirements.
The number of brackets depends on the bracket type, format and the wind load.
The brackets are attached to the reverse side of our facade elements with rivets. PolyGrip rivets 4.8 x 10 alu/Nirosta, art. No.: 6720145 manufactured by Gesipa must be used.
If the material thickness of the bracket is < 4.0 mm, a suitable washer must be inser-ted between the bracket and the rivet.
Rail system
Attachment according to statical requirements
outlying brackets with 3 rivets
Edge distance: min. 75 mm to first rivetmax. 400 mm to middle of bracket
F IXING METHODS METawall® varIaNT I + I I
~10
mm
fixing methods
BF20e-2017/01Modifications and errors reserved 05
F IXING METHODS METawall® varIaNT I + I I
Technical data on the rivets
rivet PolyGrip rivet
Size / Material 4.8 x 10 alu/Nirosta
Clamping range 0.5 – 6.5 mm
Thickness of bracketsmin. 4.0 mmmax. 5 mm
Drill 4.9 mm
Manufacturer Gesipa
art. No. 1433892
Characteristic values of the riveted connection according ETA 13/0253 Appendix 14
rivet traction 230 N / rivet
rivet shearing force 375 N / rivet
Rail system Drilling: we recommend that you use a sleeve which prevents the drill penetrating too far, to ensure that the drill does not dent or break through to the visible side of the panel.
Rivet setting process: • The rivet is to be applied straight, at 90°• Ensure that the rivet head lies flat against the panel• On insertion, the rivet protrudes slightly. During the setting process, light pressure must be applied to press it in
A sample panel is available on request to allow you to familiarise yourself with the correct drilling and setting procedure in advance.
See the processing instructions for recommended rivet setting tools.
If the material thickness of the bracket is < 4.0 mm, a suitable washer must be insertedbetween the bracket and the rivet.
Edge distance: min. 75 mm to first rivet
max. 400 mm to middle of bracket
Edge distance: min. 75 mm to first rivet
Distance rivet axis - panel edge
min. 75 mm
Distance rivet axis - rivet axis
75 mm
fixing methods
BF20e-2017/01Modifications and errors reserved 06
Glueing with SikaTack®-Panel-System
The rules for fixing Metawall® with SikaTack®-Panel-System can be found in the Na-tional Technical Approval Z-10.8-408. The fire rating for Metawall® with SikaTack®-Panel-System is C-s2, d0 (flame resistant). The maximum size of the facade elements is 1470 x 4300 mm. Pretreatment (bevelling and primer) of Metawall® is not necessary since the adhesive coating on the rear side takes over the function of the primer.
The arrangement and design of the substructure must be done according to statics.
Metawall® variant I: out of panel type alu sf cc 10-03-05 hl / H10 Metawall® variant II: out of panel type alu sf cc 08-03-05 hl / H10
Tables of static predesign - Metawall® with SikaTack®-Panel-System
Metawall® variant II and support direction crosswise to corrugation
wind load [kN/m²]
0,3 0,5 0,7 0,9 1,1 1,3 1,5 1,7 1,9 2,1 2,3 2,7 3,0
maximum span [m]
1,7 1,4 1,3 1,2 1,1 1,0 1,0 0,9 0,9 0,9 0,8 0,7 0,6
Metawall® variant I and support direction crosswise to corrugation
wind load [kN/m²]
0,3 0,5 0,7 0,9 1,1 1,3 1,5 1,7 1,9 2,1 2,3 2,7 3,0
maximum span [m]
1,7 1,4 1,3 1,2 1,1 1,1 1,0 0,9 0,9 0,9 0,8 0,7 0,6
Metawall® variant II and support direction parallel to corrugation
wind load [kN/m²]
0,3 0,5 0,7 0,9 1,1 1,3 1,5 1,7 1,9 2,1 2,3 2,7 3,0
maximum span [m]
1,5 1,4 1,3 1,2 1,1 1,1 1,0 0,9 0,9 0,9 0,8 0,7 0,6
Metawall® variant I and support direction parallel to corrugation
wind load [kN/m²]
0,3 0,5 0,7 0,9 1,1 1,3 1,5 1,7 1,9 2,1 2,3 2,7 3,0
maximum span [m]
1,5 1,5 1,4 1,2 1,2 1,1 1,0 1,0 1,0 1,0 0,8 0,7 0,6
support direction crosswise to corrugation
support direction parallel to corrugation
The tables shown replace no static!
1 - direction of corrugation2 - substructure
1 - direction of corrugation2 - substructure
F IXING METHODS METawall® varIaNT I + I I
fixing methods
BF20e-2017/01Modifications and errors reserved 07
l IST OF MaNUFaCTUrErS
Attachment with brackets GESIPA Blindniettechnik GmbHNordenstraße 13 - 39D-64546 Möhrfelden-walldorf
PolyGrip rivet4.8 x 10 alu/Nirostaart. No.: 6720145
Glueing Walter Hallschmid GmbH & Co. KGlehmhäuserstr. 2094424 arnstorf
SikaTack®-Panel-System
Substructure systems BWM Dübel+Montagetechnik GmbHErnst-Mey-Str. 1D - 70771 leinfelden-Echterdingen
DWS Pohl GmbH (Systea)Margarete-Steiff-Str. 6D - 24558 Henstedt-Ulzburg
GIP GmbHan der Katharinenkirche 2D - 38100 Braunschweig
NFT-SL Fassadentechnik GmbHweinbergstr. 2D - 76889 Kapellen - Drusweiler
Phone: +49 - 711 / 90313 - 0Fax: +49 - 711 / 90313 - 20Internet: www.bwm.deE-mail: info@bwm.de
Phone: +49 - 4193 / 99 11Fax: +49 - 4193 / 99 11 - 49Internet: www.pohlnet.comE-mail: systea@pohlnet.com
Phone: +49 531 7021-1244Fax: +49 531 7021-1245Internet: www.gip-fassade.comEmail: info@gip-fassade.com
Phone: +49 - 6343 / 7003 - 0Fax: +49 - 6343 / 7003 - 20Internet: www.nft-sl.deE-mail: info@nft-sl.de
Phone: +49 - 8723 / 9612 - 0Fax: +49 - 8723 / 9612 - 70Internet: www.hallschmid.euE-Mail: info@hallschmid.eu
Phone: +49 - 6105 / 962 - 0Fax: +49 - 6105 / 962 - 287Internet: www.gesipa.comE-mail: info@gesipa.com
Note The processing guidelines issued by the manufacturers must be observed for the accessories used.
processing instructions
Processing instructions
processing instructions
BF20e-2017/01Modifications and errors reserved 02
SAWING
G:\Bereiche\Fassade\Archiv\Fassadenordner 2007\In Design\Verarbeitungshinweise\Bilder\IMG_1100_1.jpg
Saws Metawell® panels can be processed using circular saws, jigsaws and bandsaws with conventional saw blades. However, straight-set saw blades should not be used, as the teeth catch between cover sheet and corrugation and lead to an untidy cut. For use of circular saws, flat/trapezoid toothing with a negative tooth position and hard metal blades have proved effective.
A slide table for format circular saws or the use of vertical saws are advantageous when processing large-format panels. For optimum results, the use of limit stops is recommended. Stack cutting is possible for more economical processing. However, special care must be taken to ensure that the panels are fixed firmly in position and that shavings are extracted.
Circular and vertical saws can be used to cut grooves in the panels, allowing later edging of the panel without the use of an additional bending machine. Here, howe-ver, in addition to the use of an appropriate prismatic mill cutter, the panel needs to be pressed down via a pressure roll to ensure a defined milling depth.
Preliminary trials with suitable samples are recommended.
Vertical saw (panel saw)
Negative flat-trapezoid toothLeitz circular saw blade WK 462-2-37
Tool parameters for Metawell®
Saw type Circular saw Band saw CNC saw blade
Saw blade 80 teeth / D = 250 mm 14 teeth / 1“ D = 160 mm
Manufacturer / Article
Leitz / WK 462-2-37 - Leitz / WK 462-2-37
Feed 10 m/min 20 m/min 10 m/min
Speed 3500 - 6500 rpm - 12,000 rpm
Suppliers for tools Gebr. Leitz GmbH & Co. KGLeitzstraße 2D - 73447 Oberkochenwww.leitz.org
Jigsaw blades fine, for wood or aluminium, e.g.: • Bosch T123x Progressor, tooth pitch 1.2 - 2.6 mm • Bosch T118A Metal, tooth pitch 1.1 - 1.5 mm
processing instructions
BF20e-2017/01Modifications and errors reserved 03
MILL ING AND DRILL ING
Milling and drilling Metawell® panels can be processed using hand-held processing tools and machine tools. Wood processing tools preferably with protections against metal shavings are ideal, as processing Metawell® has more in common with woodworking than with metal processing. This applies in particular to large-area processing, the clamping methods used, feed speed and the fact that coolants and lubricants are not used.
Perform appropriate tests or consult the manufacturer before using hand-held processing tools.
Examples of appropriate tools for the processing of Metawell® aluminium panels and the most important tool parameters can be found on the next page.
Router
Contour milling (router)
Tool parameters for Metawell®
ToolRouter 8 mm
(contour milling)
Router 4 mm (internal corners, blind holes and
bores)
Type
VHM contour milling cutter 8 x 30 x 80 mm
solid carbide contour milling cutter, single-edged, right-hand helix,
right-hand cutting, TiAlN-coating
VHM contour milling cutter 4 x 15 x 40 mm
solid carbide contour milling cutter, single-edged, right-hand helix,
right-hand cutting, TiAlN-coating
Speed18,000 min-1
to 30,000 min-1
8,000 min-1 to
30,000 min-1
Feed5 m/min
to 10 m/min
0.5 m/min to
10 m/min
SupplierREXIM GmbH Glaitstraße 29
D-75433 Maulbronn-Schmie
REXIM GmbH Glaitstraße 29
D-75433 Maulbronn-Schmie
The tool parameters listed below are based on long-term experience. However, due to the large number of tools and processing machines on the market, preliminary tests should be performed with the machines and tools you have in mind. Observe any limitations imposed by the machine and tool manufacturer's specifications.
Tool parameters
processing instructions
BF20e-2017/01Modifications and errors reserved 04
Double angle cutter
Milled groove for edging (prismatic mill cutter)
Tool parameters for Metawell®
ToolCNC V-groove cutter (0.5 mm edge radius)
CNC V-groove cutter (2.5 mm edge radius)
CNC V-groove cutter (approx. 4 mm edge
radius)
Type
V-groove cutter with changing blades
Article No.: 168018121
V-groove cutter with changing blades
Article No.: 166026662
V-groove cutter with changing blades
Article No.: 166022293
Speedmax.
10,000 min-1
max. 10,000 min-1
max. 6,200 min-1
Feed 6 m/min 6 m/min 5 m/min
Supplier
Gebr. Leitz GmbH & Co. Leitzstraße 2
D - 73447 Oberkochen
Gebr. Leitz GmbH & Co. Leitzstraße 2
D - 73447 Oberkochen
Gebr. Leitz GmbH & Co. Leitzstraße 2
D - 73447 Oberkochen
Tool parameters for Metawell®
ToolT-slot cutter
(lateral milling of the corrugation)T-slot cutter
(lateral milling of the corrugation)
TypeGroove cutter 22.5 x 4
(milling depth max. 8 mm per operation)
Groove cutter 45 x 8.2 (must be ground down to the
required width)
Speed 10,000 min-1 10,000 min-1
Feed 5 m/min 5 m/min
SupplierHoffmann GmbH
Haberlandstraße 55 D - 81241 München
Gebr. Leitz GmbH & Co. Leitzstraße 2
D - 73447 Oberkochen
T-slot cutter
Milling of the corrugation (T-slot cutter)
Note: The cutter must be selected in accordance with the radii to be created and the existing (paint) surface of the panel. Consult the manufacturer for further informati-on.
\\x2400\metawell\Bereiche\Fassade\Archiv\Fassadenordner 2007\In Design\Verarbeitungshinweise\Bilder\Fräsarten.eps
MILLING AND DRILL ING
processing instructions
BF20e-2017/01Modifications and errors reserved 05
EDGE DESIGN
Edge design The Metawell® panels can be realised with other edge designs.
However, when selecting an edge finish, certain aspects need to be considered:
• visual requirements, design, desired coating
• ancillary structural conditions, flush alignment, connection to further components
• ambient parameters, temperature, pressure, effect of media
• load in installed state, mechanical and thermal load, type of component
• requirements with regard to impermeability
• production costs and quantities, one-off production, series production
The combination of Metawell® panels with other materials and components in out-door use must be examined very carefully. There is a risk of contact corrosion as a result of varying material properties and the influence of weathering. To avoid deformation or constraint, the varying thermal expansion of the materials must also be allowed for.
Metawall®
Edge profile
L profile
Milling for edging
closed outside corner
closed inside corner
Corner of Metawall® - view of the reverse side
Note It must be ensured that media, e.g. water (including condensation), which penetrate into the panel can always drain off unobstructed!
Ventilation gap
Metawell GmbH
Metawell GmbH
METAWELL GMBH
The company Metawell GmbH - metal sandwich technology, based in the Bavarian town of Neuburg an der Donau, produces the aluminium sandwich panels Metawell®, Meta-wall®, Metawell® Aluflex and MetaCore® and distributes them worldwide directly or via partners. Thanks to numerous investments in machinery a comprehensive pre-processing of the sandwich panels is possible, so that in addition to semi-finished panelscustomized elements can be offered.
The product Metawell®, Metawall®, Metawell® Aluflex and MetaCore® are manufactured in a continuous process using hot-melt adhesives. One or two thin metal sheets are bon-ded to a thin sheet of corrugated metal. Thanks to the patented production process, the panels can also be supplied in extra-long formats.The special design makes Metawell® a very lightweight yet extremely rigid sandwich element which allows significant weight-savings, particularly in large-area applications. Formability and coating options make the product even more versatile.Thus planning engineers and designers in all branches have on hand a construction element which has convincing dynamic and visual characteristics, numerous official approvals and can be completely recycled.These are the reasons why the materials have been used worldwide for many years in the transport sector (rail vehicles, commercial vehicles and shipbuilding), in mecha-nical engineering, for radiant ceilings, in facade construction and in interior fitting.
The philosophy The company‘s goal is to provide with a high quality product technically and eco-nomically convincing solutions for all areas in which function and optics are to be implemented at a low weight - and that in a sustainable manner, too.How does Metawell GmbH contribute to sustainability? The raw material of the products is recycled aluminum. The service life of aluminum is very high, which leads to low life cycle costs. Also, due to the lightweight cons-truction the CO² emissions and the consumption in transport, where Metawell® is installed, are lower. Metawell® can be recycled to 100% without material separati-on. In addition, the waste heat of the production is used to heat the administration building, which is indeed a thoughtful and considerate usage of resources.Aware of the responsibility to national and international customers the emphasis is on reliability and fairness, and above all on personal commitment to the needs of the contact persons. The ultimate goal of all the efforts is the satisfaction of the customer. To achieve these established quality policy each employee at the Metawell GmbH contributes with its performance.On the one hand, the quality of the products are guaranteed by continuously review-ing the suitability of the suppliers. And on the other, this aim is achieved by constant monitoring of the production processes.The company is certified according to DIN EN ISO 9001 and 14001. In addition, theproducts for the construction industry have an Environmental Product Declaration according to DIN EN ISO 14025 type III and EN 15804.
Metawell GmbH
Contact of the company Metawell GmbH - metal sandwich technology
Schleifmuehlweg 31
D- 86633 Neuburg Donau
Phone: +49 8431 / 6715-725
Fax: +49 8431 / 6715-792
Internet: www.metawell.de
E-Mail: info@metawell.com
ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 14025
Metawall®
Metawell GmbH
Written in cooperation with:
Issuer and Program Holder:
Metawell GmbH – Metawall®
Environmental Product Declaration ISO 14025
An Environmental Product Declaration (EPD) in ac-cordance with ISO 14025 and EN 15804 was written for Metawell GmbH and its product Metawall® cur-tain wall facade. The objective was to investigate and identify the po-tential environmental impact of the curtain wall facade. For those purposes a Life Cycle Assess-ment (LCA) in accordance with ISO 14040 was conducted.
The LCA is a method to appraise product-related environmental aspects and the product-specific en-vironmental impact from raw material extraction (cradle), through production and usage to recy-cling/disposal (grave). An EPD allows participation in tenders within sus-tainable building certification systems and serves as a communications tool to publicize the environmen-tal performance of products.
LCA: Metawall® Summary of Results
Global Warming Potential
During its life cycle the Metawall® curtain wall fa-cade causes greenhouse gas emissions of 19.94 kg/m² CO2 equivalents. Environmental pollu-tion arising from raw material extraction is significant for the CO2 footprint of the Metawall®. The curtain wall facade received credits for the high recycling potential at the end of its use. Additional credits accrued from the recycling processes of pro-duction scrap.
Primary Energy Requirements
The energy consumed for the manufacture, use and recycling of the Metawall® curtain wall facade totaled 334 megajoules (MJ) per square meter. The largest consumer is raw material extraction related to energy expenditures for aluminum production. Credits resulted for energy savings realized in secondary aluminum production.
Pre-Consumer Recycling Percentage
The total weight of production waste, which repre-sents the pre-consumer recycling percentage, was 0.319 kg/m² or 6% of material usage. Of the total, 94% went to material recycling and 6% to energy recovery.
Post-Consumer Recycling Percentage
At the end of the Metawall® curtain wall facade life cycle, 88% of the product goes to material recycling and 12% to energy recovery. Packaging waste is taken into account in the post-consumer recycling potential.
25,85
1,38
-7,28
19,94
-10-505
1015202530
Production Use Recycling Cradle tograve
Global Warming Potential GWP 100 years [kg CO2-Eqv.]
464
3
-132
334
-200-100
0100200300400500
Production Use Recycling Cradle tograve
Cumulative primary energy demand (CED) from reg. and non-reg. resources
(lower calorific value) [MJ]
6%
94%
Pre-Consumer Recycling [%]
Energy recovery (thermal recycling) Material recycling
12%
88%
Post-Consumer Recycling [%]
Energy recovery (thermal recycling) Material recycling
ENVIRONMENTAL PRODUCT DECLARATION in accordance with ISO 14025
Metawall® A2
Metawell GmbH
Written in cooperation with:
Issuer and Program Holder:
Metawell GmbH – Metawall® A2
Environmental Product Declaration ISO 14025
An Environmental Product Declaration (EPD) in ac-cordance with ISO 14025 and EN 15804 was written for Metawell GmbH and its product Metawall® A2 curtain wall facade. The objective was to investigate and identify the po-tential environmental impact of the curtain wall facade. For those purposes a Life Cycle Assess-ment (LCA) in accordance with ISO 14040 was conducted.
The LCA is a method to appraise product-related environmental aspects and the product-specific en-vironmental impact from raw material extraction (cradle), through production and usage to recy-cling/disposal (grave). An EPD allows participation in tenders within sus-tainable building certification systems and serves as a communications tool to publicize the environmen-tal performance of products.
LCA: Metawall® A2 Summary of Results
Global Warming Potential
During its life cycle the Metawall® A2 curtain wall fa-cade causes greenhouse gas emissions of 22.49 kg/m² CO2 equivalents. Environmental pollu-tion arising from raw material extraction is significant for the CO2 footprint of the Metawall® A2. The curtain wall facade received credits for the high recycling potential at the end of its use. Additional credits accrued from the recycling processes of pro-duction scrap.
Primary Energy Requirements
The energy consumed for the manufacture, use and recycling of the Metawall® A2 curtain wall facade totaled 377 megajoules (MJ) per square meter. The largest consumer is raw material extraction related to energy expenditures for aluminum production. Credits resulted for energy savings realized in secondary aluminum production.
Pre-Consumer Recycling Percentage
The total weight of production waste, which repre-sents the pre-consumer recycling percentage, was 0.451 kg/m² or 6% of material usage. Of the total, 91% went to material recycling and 9% to energy recovery.
Post-Consumer Recycling Percentage
At the end of the Metawall® A2 curtain wall facade life cycle, 86% of the product goes to material recy-cling and 14% to energy recovery. Packaging waste is taken into account in the post-consumer recycling potential.
30,57
2,02
-10,10
22,49
-15-10
-505
101520253035
Production Use Recycling Cradle tograve
Global Warming Potential GWP 100 years [kg CO2-Eqv.]
556
4
-183
377
-400
-200
0
200
400
600
Production Use Recycling Cradle tograve
Cumulative primary energy demand (CED) from reg. and non-reg. resources
(lower calorific value) [MJ]
9%
91%
Pre-Consumer Recycling [%]
Energy recovery (thermal recycling) Material recycling
14%
86%
Post-Consumer Recycling [%]
Energy recovery (thermal recycling) Material recycling
top related