factory of the future v2...opex savings increase productivity by 400% 11 mths repayment period of 11...
Post on 07-Aug-2020
5 Views
Preview:
TRANSCRIPT
Vs
Save millions in your factory of the future
Pre-heating Filler Material
Vacuum chamber required
No need for:
Loading / UnloadingOperations
400 hours per unit of production with Ebflow
2000 hours with traditional Submerged Arc Welding
EBFLOWElectron Beam
Welding
Submerged Arc
Welding
Single run/pass welding compared to dozens of runs/passes
All of this made possible with the revolutionary Ebflow. To find out more about local
vacuum electron beam welding
75% less using Ebflow than in standard submerged arc welding process
More than £1.7 million per year OPEX savings
Increase productivity by 400%
11 mthsRepayment period of 11 months£
www.ebflow.com
Less transportation costsEbflow
Submerged arc welding
loca
l vac
uum electron beam welding
The energy consumed in one metre of weld is
top related