Sverdrup1
FAULTTREE
ANALYSIS
P. L. ClemensMay 1993
4th Edition
TOPICS COVERED . . .• Fault Tree Definition
• Developing the Fault Tree
• Structural Significance of the Analysis
• Quantitative Significance of the Analysis
• Diagnostic Aids and Shortcuts
• Finding and Interpreting Cut Sets and Path Sets
• Success–Domain Counterpart Analysis
• Assembling the Fault Tree Analysis Report
• Fault Tree Analysis versus Alternatives
• Fault Tree Shortcomings / Pitfalls / Abuses
2
All fault trees appearing in this training module have been drawn, analyzed, and printedusing FaultrEASE , a computer application available from: Arthur D. Little, Inc. / AcornPark / Cambridge, Massachusetts, 02140-2390 — Phone (617) 864-5770.
FIRST —A BIT OFBACKGROUND . . .
3
• Origins of the technique
• Fault Tree Analysis defined
• Where best to apply the technique
• What the analysis produces
• Symbols and conventions
ORIGINS . . .
• Fault tree analysis was developed in1962 for the U.S. Air Force by BellTelephone Laboratories for use withthe Minuteman system…was lateradopted and extensively applied bythe Boeing Company…is one of manysymbolic logic analytical techniquesfound in the operations researchdiscipline.
4
THE FAULT TREE IS . . .
• …a graphic “model” of the pathways within asystem that can lead to a foreseeable, undesirableloss event. The pathways interconnectcontributory events and conditions, using standardlogic symbols. Numerical probabilities ofoccurrence can be entered and propagated throughthe model to evaluate probability of theforeseeable, undesirable event.
• …only one of many System Safety analytical toolsand techniques.
5
FAULT TREE ANALYSIS IS BESTAPPLIED TO CASES WITH . . .
• Large, perceived threats of loss…i.e., high risk.
• Numerous potential contributors to a mishap.
• Complex or multi-element systems/processes.
• Already-identified undesirable events. (A must!)
• Indiscernible mishap causes (i.e., autopsies).
6
CAVEAT: Large fault trees are resource-hungry and shouldnot be undertaken without reasonable assurance of need.
FAULT TREE ANALYSIS PRODUCES . . .• Graphic display of chains of events/conditions
leading to the loss event.
• Identification of those potential contributors tofailure that are “critical.”
• Improved understanding of systemcharacteristics.
• Qualitative/quantitative insight into probability ofthe loss event selected for analysis.
• Identification of resources committed topreventing failure.
• Guidance for redeploying resources to optimizecontrol of risk.
• Documentation of analytical results.
7
SOME DEFINITIONS . . .• FAULT: An abnormal, undesirable state of a system or a system element* induced (1)
by presence of an improper command or absence of a proper one, or (2) by a failure (seebelow). All failures cause faults; not all faults are caused by failures. A system whichhas been shut down by safety features has not faulted.
• FAILURE: Loss, by a system or system element*, of functional integrity to perform asintended. E.g., relay contacts corrode and will not pass rated current when closed, or therelay coil has burned out and will not close the contacts when commanded — the relayhas failed ; a pressure vessel bursts — the vessel fails. A protective device whichfunctions as intended has not failed — e.g., a blown fuse.
• Primary (or Basic) Failure: The failed element has seen no exposure toenvironmental or service stresses exceeding its ratings to perform. E.g., fatiguefailure of a relay spring within its rated lifetime; leakage of a valve seal within itspressure rating.
• Secondary Failure: Failure induced by exposure of the failed element toenvironmental and/or service stresses exceeding its intended ratings. E.g., thefailed element has been improperly designed, or selected, or installed, or calibratedfor the application; the failed element is overstressed/underqualified for its burden.
8
*System element: a subsystem, assembly, component, piece part, etc.
ASSUMPTIONS AND LIMITATIONS . . .
• Non–repairable system.
• No sabotage.
• Markov…
• Fault rates are constant… λ = = K
• The future is independent of the past — i.e.,future states available to the system dependonly upon its present state and pathways nowavailable to it, not upon how it got where it is.
• Bernoulli…
• Each system element analyzed has two,mutually exclusive states.
9
MTBF1
THE LOGIC SYMBOLS . . .
10
TOP Event…foreseeable, undesirable event, towardwhich all fault tree logic paths flow…or…
Intermediate Event…describing a system stateproduced by antecedent events.
AND
OR
“AND” Gate…produces output if all inputs co-exist. All inputs,collectively, must be (1) necessary and (2) sufficient tocause the output event.
“OR” Gate…produces output if any input exists. Any input,individually, must be (1) necessary and (2) sufficient to causethe output event.
Basic Event…Initiating fault/failure, not developedfurther. (Called “Leaf,” “Initiator,” or “Basic.”)The Basic Event marks the limit of resolutionof the analysis.
EVENTS and GATES are NOT component parts of the system being analyzed. They aresymbols representing the logic of the analysis. They are bi-modal. They function flawlessly.
Most Fault Tree Analysescan be carried out usingonly these four symbols.
STEPS IN FAULT TREE ANALYSIS . . .
11
6. Repeat / continue…
4. Identify second-levelcontributors.
5. Link second-levelcontributors to TOP bylogic gates.
1. Identify undesirable TOPevent.
3. Link contributors to TOPby logic gates.
2. Identify first-levelcontributors.
Basic Event…(“Leaf,”“Initiator,” or “Basic”)
indicates limit of analyticalresolution.
SOME RULES AND CONVENTIONS . . .
12
NOYES
Do usesingle-stem
gate-feed inputs.
Don't let gatesfeed gates.
MORE RULES AND CONVENTIONS . . .
• Be CONSISTENT in naming fault events/conditions…use same name for sameevent/condition, throughout the analysis.(Use index numbering for large trees.)
• Say WHAT failed/faulted and HOW—e.g.,“Switch Sw–418 Contacts Fail Closed”
• Don't expect miracles to “save” thesystem. Lightning will not recharge thebattery…a large bass will not plug thehole in the hull.
13
SOME CONVENTIONS ILLUSTRATED . . .
14
Initiators must be Statistically Independentof one another.
NAME BASICS CONSISTENTLY !
FLAT TIRE
AIRESCAPES
FROMCASING
TIREPRESSURE
DROPS
TIREDEFLATES
?
NO MIRACLES !
MAYBE…• …a gust of wind will come
along and correct theskid.
• …a sudden cloudburstwill extinguish theignition source.
• …there’ll be a poweroutage when theworker’s hand contactsthe high-voltageconductor.
IDENTIFYING TOP EVENTS . . .
• Explore historical records (own & others).
• Look to energy sources.
• Identify potential mission failurecontributors.
• Develop “what–if” scenarios.
• Use “shopping lists.”
15
EXAMPLE TOP EVENTS . . .
16
• Wheels-up landing
• Mid-air collision
• Subway derailment
• Turbine engine FOD
• Rocket failure to ignite
• Dengue fever pandemic
• Sting failure
• Inadvertent nuke launch
• Reactor loss of cooling
• Uncommanded ignition
• Irretrievable loss of primary test data
• Inability to dewater buoyancy tanks
TOP events represent potential high-penalty losses (i.e., high risk). Eitherseverity of the outcome or frequency of occurrence can produce high risk.
“SCOPE” THE TREE TOP . . .
17
TOO BROAD IMPROVED• Computer Outage • Outage of Primary Data
Collection computer, exceeding8 hours, from external causes
• Exposed Conductor • Unprotected body contact withpotential greater than 40 volts
• Foreign Object Ingestion • Foreign object damage byobject weighing more than 5grams and having densitygreater than 3.2 gm/cc
• Jet Fuel Dispensing Leak • Fuel dispensing fire resulting inloss exceeding $2500
“Scoping” reduces effort spent in the analysis by confining it to relevant considerations. To“scope,” describe the level of penalty or the circumstances for which the event becomesintolerable — use modifiers to narrow the event description.
ADDING CONTRIBUTORS TO THE TREE . . .
18
… (3) AND, eachelement must be an
immediatecontributor to the
level above.
(1) EachCONTRIBUTING
ELEMENT…
… (2) must be anINDEPENDENT* FAULTor FAILURE CONDITION(typically described by anoun, an action verb, andspecifying modifiers)… EFFECT
CAUSE
NOTE: As a group under an AND gate, and individually under an OR gate,contributing elements must be both necessary and sufficient to serve asimmediate cause for the output event.
independent ofall others. However, the samefault may appear at other pointson the tree.
*At a givenlevel, undera givengate, eachfault mustbe
EXAMPLES:• Electrical Power
Fails Off
• Low-Temp. Alarm
Fails Off
• Solar q > 0.043BTU/ft2/sec
• Relay K-28Contacts FreezeClosed
• Transducer CaseRuptures
• Proc. Step 42Omitted
•
EXAMPLEFAULT TREEDEVELOPMENT . . .
19
• Constructing the logic
• Spotting / correcting somecommon errors
• Adding quantitative data
OVERSLEEP
AN EXAMPLE FAULT TREE . . .
20
LATE FOR WORK
SEQUENCEINITIATIONFAILURES
TRANSPORTFAILURES
LIFESUPPORTFAILURES
PROCESS &MISC. SYSTEM
MALFUNCTIONS
UNDESIRABLEEVENT
CAUSATIVEMODALITIES*
* Partitioned aspects of system function, subdivided as topurpose, physical arrangement, or sequence of operation.?
SEQUENCE INITIATION FAILURES . . .
21
OVERSLEEP
NO “START”PULSE
BIO-RHYTHM
FAILS
ARTIFICIALWAKEUP FAILS
NATURALAPATHY
?
VERIFYING LOGIC . . .
22
?
OVERSLEEP
NO “START”PULSE
BIO-RHYTHM
FAILS
ARTIFICIALWAKEUP FAILS
NATURALAPATHY
Does this“look” correct?
Should thegate be
OR?
TEST LOGIC IN SUCCESS DOMAIN . . .
23
?
OVERSLEEP
NO “START”PULSE
BIO-RHYTHM
FAILS
ARTIFICIALWAKEUP FAILS
NATURALAPATHY
Redraw — invert allstatements and gates.
?
WAKEUPSUCCEEDS
“START”PULSE
WORKS
BIO-RHYTHMWORKS
ARTIFICIALWAKEUPWORKS
NATURALHIGH
TORQUE
FailureDomain…
SuccessDomain…
If it was wrong here . . . . . . it'll be wrong here, too!
“motivation”“trigger”
ARTIFICIALWAKEUPFAILS . . .
24
ARTIFICIALWAKEUP
FAILS
ALARMCLOCKS
FAIL
MAIN,PLUG-IN
CLOCK FAILS
POWER
OUTAGE
FAULTYINNARDS
ELECTRICAL
FAULT
MECHANICALFAULT
HOUR
HAND
FALLS
OFF
HOUR
HAND
JAMS
WORKS
FORGET TO
SET
BACKUP(WINDUP)
CLOCK FAILS
FAULTY
MECHANISM
FORGET TO
SET
FORGET TO
WIND
NOCTURNAL
DEAFNESS
What does the treetell us about systemvulnerability at this
point?
BACKGROUNDFORNUMERICALMETHODS . . .
25
• Relating PF to R
• The Bathtub Curve
• Exponential Failure Distribution
• Propagation through Gates
• PF Sources
RELIABILITY & FAILURE PROBABILITYRELATIONSHIPS . . .
26
≡ 1
S = Successes
F = Failures
Reliability . . . . . . . . . R =
Failure Probability . . . PF =
R + PF =
λ = Fault Rate =
S(S + F)
(S + F)F
S(S + F) (S + F)
F+
MTBF1
SIGNIFICANCE OF PF . . .
27
BURN IN
INFANT M
ORTALITY
RANDOM FAILURE
BURN OUT
t
λ
λ00
0
T
The Bathtub Curve
Most system elements have constantfault rates ( λ) over long periods of usefullife. During these periods, faults occurat random times.
Fault probability is modeledacceptably well as a function ofexposure interval (T) by theexponential. For exposure intervalsthat are brief (T ≤ 0.2 MTBF), P
F is
approximated within 2% by λT.
ePF = 1 – -λT
PF ≅ λT (within 2%, for λT ≤ 20%)
R = e -λT
1.0
00
0.63
1 MTBF T
Exponentially Modeled Failure
PF = 1 – RT
PF = 1 – (RARB)PF = 1 – [(1 – PA)(1 – PB)]
R & PF THROUGH GATES . . .
28
R + PF ≡ 1
OR Gate AND GateEither of two, independent,element failures produces
system failure.
Both of two, independentelements must fail to produce
system failure.RT = RA + RB – RARBRT = RARB
PF = 1 – RT
PF = 1 – (RA + RB – RARB)PF = 1 – [(1 – PA) + (1 – PB) – (1 – PA)(1 – PB)]
PF = PAPBPF = PA + PB – PAPB
…for PA,B ≤ 0.2PF ≅ PA + PB
with error ≤ 11%
“RareEvent
Approximation”
PF = PAPBPCOmit forapproximation
For 3 Inputs
For 2 Inputs
PF = PA + PB + PC– PAPB – PAPC – PBPC
+ PAPBPC
[Union / ∪] [Intersection / ∩]
Intersection / ∩
PF PROPAGATION THROUGH GATES . . .
29
PT = P
1 + P
2 – P
1P
2P
T = P
1P
2
AND Gate…
TOP
P1 P
2
PT = P
1P
2
1 2
OR Gate…
TOP
P1
P2
PT ≅ P
1 + P
2
1 2
1 & 2are
INDEPENDENTevents
Usually negligible…
PT = Π Pe
PT ≅ Σ Pe
Union / ∪
The ip operator (C) is the co-function of pi (∏). It provides an exact solution for propagating probabilities through the OR gate. Its use is rarely justifiable.
“IPPING” GIVES EXACT OR GATE SOLUTIONS . . .
30
PT = Pe = 1 – Π (1 – Pe)
PT = 1 – [(1 – P1) (1 – P2) (1 – P3) (1 – Pn)]…
TOP
P1
P2
1 2 3
P3
PT = P
e
TOP
P1
P2
1 2 3
P3
PT = ?
TOP
1 2 3
PT = Π (1 – P
e)
P1 = (1 – P
1)P
2 = (1 – P
2)
P3 = (1 – P
3)
Failure FailureSuccess
MORE GATES AND SYMBOLS . . .
31
M
INCLUSIVE OR Gate…P
T = P
1 + P
2 – (P
1 x P
2)
Opens when any one or more events occur.
EXCLUSIVE OR Gate…P
T = P
1 + P
2 – 2(P
1 x P
2)
Opens when any one (but only one) event occurs.
MUTUALLY EXCLUSIVE OR Gate…P
T = P
1 + P
2
Opens when any one of two or more eventsoccur. All other events are then precluded.
PT ≅ Σ Pe
For all OR Gate cases, theRare Event Approximation
may be used for small values of Pe.
STILL MORE GATES AND SYMBOLS . . .
32
PRIORITY AND Gate…P
T = P
1 x P
2
Opens when input events occurin predetermined sequence.
INHIBIT Gate…
Opens when (single) inputevent occurs in presenceof enabling condition.
CONDITIONING EVENT…
Applies conditions orrestrictions to other symbols.
UNDEVELOPED EVENT…
An event not further developed.
EXTERNAL EVENT…
An event normally expectedto occur.
SOME FAILURE PROBABILITY SOURCES . . .
• Manufacturer’s Data
• Industry Consensus Standards
• MIL Standards
• Historical Evidence — Same or SimilarSystems
• Simulation / Testing
• Delphi Estimates
• ERDA Log Average Method
33
LOG AVERAGE METHOD* . . .
34
*REFERENCE: Briscoe, Glen J.; “Risk Management Guide;” System Safety Development Center; SSDC-11; DOE 76-45/11; September 1982.
0.1
0.0316+
0.01 0.02 0.03 0.04 0.05 0.07
PL
LowerProbability
Bound10–2
PU
UpperProbability
Bound10–1
Log PL + Log P
U
2
(–2) + (–1)
2Log Average = Antilog = Antilog = 10–1.5 = 0.0316228
If probability is not estimated easily, but upper and lower credible bounds can be judged…
• Estimate upper and lower credible bounds of probability for the phenomenon in question.
• Average the logarithms of the upper and lower bounds.
• The antilogarithm of the average of the logarithms of the upper and lower bounds is lessthan the upper bound and greater than the lower bound by the same factor. Thus, it isgeometrically midway between the limits of estimation.
Note that, for the example shown, the arithmetic average would be…
i.e., 5.5 times the lower bound and 0.55 times the upper bound.
0.01 + 0.12 = 0.055
MORE FAILURE PROBABILITY SOURCES . . .
• WASH–1400 (NUREG–75/014); “Reactor Safety Study — AnAssessment of Accident Risks in US Commercial Nuclear PowerPlants;” 1975
• IEEE Standard 500
• Government–Industry Data Exchange Program (GIDEP)
• Rome Air Development Center Tables
• NUREG/CR–1278; “Handbook of Human Reliability Analysis withEmphasis on Nuclear Power Plant Applications;” 1980
• NUREG–0492; “Fault Tree Handbook;” (Table XI–1); 1986
• …many others, including numerous industry–specific proprietarylistings
35
Semiconductor Diodes 0.10 1.0 10.0
Transistors 0.10 3.0 12.0
Microwave Diodes 3.0 10.0 22.0
MIL-R-11 Resistors 0.0035 0.0048 0.16
MIL-R-22097 Resistors 29.0 41.0 80.0
Rotary Electrical Motors 0.60 5.0 500.0
Connectors 0.01 0.10 10.0
SOURCE: Willie Hammer, “Handbook of System and Product Safety,” Prentice Hall
TYPICAL COMPONENT FAILURE RATES . . .
36
DEVICE FAILURES PER 106 HOURSMINIMUM AVERAGE MAXIMUM
TYPICAL HUMAN OPERATOR FAILURE RATES . . .
37
* Error of Omission/Item Embedded in Procedure 3 x 10-3
* Simple Arithmetic Error with Self-Checking 3 x 10-2
* Inspector Error of Operator Oversight 10-1
* General Rate/High Stress/Dangerous Activity 0.2 - 0.3
** Checkoff Provision Improperly Used 0.1 - 0.9 (0.5 avg.)
** Error of Omission/10-Item Checkoff List 0.0001 - 0.005 (0.001 avg.)
** Carry out Plant Policy/No Check on Operator 0.005 - 0.05 (0.01 avg.)
** Select Wrong Control/Group of Identical,
Labeled, Controls 0.001 - 0.01 (0.003 avg.)
SOURCES: * WASH-1400 (NUREG-75/014); “Reactor Safety Study — An Assessment of Accident
Risks in U.S. Commercial Nuclear Power Plants,” 1975
** NUREG/CR-1278; “Handbook of Human Reliability Analysis with Emphasis on
Nuclear Power Plant Applications,” 1980
ACTIVITY ERROR RATE
SOME FACTORS INFLUENCING HUMAN OPERATORFAILURE PROBABILITY . . .
• Experience
• Stress
• Training
• Individual self discipline / conscientiousness
• Fatigue
• Perception of Error Consequences (…to self / others)
• Use of Guides and Checklists
• Realization of Failure on Prior Attempt
• Character of Task — Complexity/Repetitiveness
38
ARTIFICIALWAKEUPFAILS . . .
39
Faults/Operation……8. x 10-3
Rate, Faults/Year………2/1
Assume 260 Operations/Year
KEY:
ARTIFICIALWAKEUP
FAILS
3.34 x 10 -4
ALARMCLOCKS
FAIL3.34 x 10 -4
MAIN,PLUG-IN
CLOCK FAILS1.82 x 10
-2
POWER
OUTAGE
1. x 10 -2
FAULTYINNARDS
3. x 10 -4
ELECTRICAL
FAULT
3. x 10-4
MECHANICALFAULT
8. x 10 -8
HOUR
HAND
FALLS
OFF
4. x 10 -4
HOUR
HAND
JAMS
WORKS
2. x 10 -4
FORGET TO
SET
8. x 10-3
BACKUP(WINDUP)
CLOCK FAILS1.83 x 10
-2
FAULTY
MECHANISM
4. x 10 -4
FORGET TO
SET
8. x 10 -3
FORGET TO
WIND
1. x 10 -2
NOCTURNAL
DEAFNESS
Negligible
Approx. 0.1/yr
3/12/11/102/1
1/15
1/10
3/1
1/20
HOW MUCH PT IS TOO MUCH . . . ?
40
Consider “bootstrapping” comparisons with known risks…
† Browning, R. L., “The Loss Rate Concept in Safety Engineering”* National Safety Council, “Accident Facts”‡ Kopecek, J. T., “Analytical Methods Applicable to Risk Assessment & Prevention,” Tenth
International System Safety Conference
≈ 10–2 - 10–3 / exp MH†
≈ 10–3 / exp hr†
≈ 10–4 / exp hr†
≈ 10–5 / exp hr†
≈ 10–6 / exp MH†
≈ 10–6 / exp MH†
≈ 10–7 - 10–8 / exp MH†
≈ 10–9 / exp MH*
≈ 10–10 / exp hr‡
≈ 10–14 / exp hr†
• Human Operator Error (Responseto Repetitive Stimulus)
• Internal Combustion Engine Failure(Spark Ignition)
• Pneumatic Instrument Recorder Failure• Distribution Transformer Failure• U.S. Motor Vehicle Fatalities• Death by Disease (U.S. Lifetime Avg.)• U.S. Employment Fatalities• Death by Lightning• Meteorite (>1 lb) Hit on 10 3 x 103 ft area
of U.S.• Earth Destroyed by Extraterrestrial Hit
APPLY SCOPING . . .
41
WHAT power outages are of concern?
NOT ALL OF THEM!
Only those that…
1. are undetected / uncompensated
2. occur during the hours of sleep
3. have sufficient duration to fault thesystem
This probability must reflect these conditions!
1. x 10 -2
POWER
OUTAGE
3/1
SINGLE–POINT FAILURE . . .
• “A Failure of one independentelement of a system which causesan immediate hazard to occurand/or causes the whole system tofail.”
42
Professional Safety — March 1980
SOME “AND” GATE PROPERTIES . . .
43
TOP
1 2
PT = P1 x P2
COST:Assume two identicalelements having P = 0.1.
PT = 0.01Two elements having P = 0.1may cost much less than oneelement having P = 0.01.
FREEDOM FROM SINGLE POINT FAILURE:Redundancy ensures that either 1 or 2 may failwithout inducing TOP.
DON'T
FAILURES AT ANY ANALYSIS LEVEL MUST BE . . .
44
ALARM FAILURE
ALARMCLOCKFAILS
BACKUPCLOCKFAILS
ALARM FAILURE
ALARMCLOCKFAILS
TOASTBURNS
BACKUPCLOCKFAILS
FAULTYINNARDS
ELECT.FAULT GEARING
FAILS
OTHERMECH.FAULT
HANDFALLS/JAMS
WORKS
MECHANICALFAULT
HANDFALLS
OFF
HANDJAMS
WORKS
• INDEPENDENT OF EACH OTHER• TRUE CONTRIBUTORS TO THE LEVEL ABOVE
TRUE CONTRIBUTORS
INDEPENDENT
DO
COMMON CAUSE EVENTS / PHENOMENA . . .
• “A Common Cause is an event or aphenomenon which, if it occurs, willinduce the occurrence of two ormore fault tree elements.”
45
Oversight of Common Causes isa frequently found fault tree flaw!
COMMON CAUSE OVERSIGHT —an example . . .
46
Four, wholly independent alarm systems are provided to detectand annunciate intrusion. No two of them share a commonoperating principle. Redundancy appears to be absolute. TheAND gate to the TOP event seems appropriate. BUT…supposethe four systems share a single source of operating power, andthat source fails, and there are no backup sources?
UNANNUNCIATEDINTRUSION BY
BURGLAR
MICROWAVE ELECTRO-OPTICAL
DETECTOR / ALARM FAILURES
SEISMICFOOTFALL ACOUSTIC
— MICROWAVE— ELECTRO-OPTICAL— SEISMIC FOOTFALL— ACOUSTIC
— BASIC POWER FAILURE— EMERGENCY POWER FAILURE
COMMON CAUSE OVERSIGHT CORRECTION . . .
47
UNANNUNCIATEDINTRUSION BY
BURGLAR
DETECTOR/ALARMFAILURE
DETECTOR/ALARMPOWER FAILURE
Here, power source failure has been recognized as an eventwhich, if it occurs, will induce failure of all four alarm systems.Power failure has been accounted for as a Common Causeevent, leading to the TOP event through an OR gate. OTHERCOMMON CAUSES SHOULD ALSO BE SEARCHED FOR!
EXAMPLE COMMON CAUSEFAULT/FAILURE SOURCES . . .
• Utility Outage
• Electricity
• Cooling Water
• Pneumatic Pressure
• Steam
• …etc…
• Moisture
• Corrosion
• Seismic Disturbance
48
• Dust/Grit
• Temperature
Effects (Freezing/
Overheat)
• Electromagnetic
Disturbance
• Single Operator
Oversight
• …many others…
EXAMPLE COMMON CAUSESUPPRESSION METHODS . . .
• Separation / Isolation / Insulation / Sealing /Shielding of System Elements.
• Using redundant elements having differingoperating principles.
• Separately powering/servicing/maintainingredundant elements.
• Using independent operators/inspectors.
49
MISSING ELEMENTS . . .?
50
Contributingelements must
combine to satisfy allconditions essentialto the TOP event.
The logic criteria ofnecessity and
sufficiency must besatisfied!
UNANNUNCIATEDINTRUSION BY
BURGLAR
ANNUNCIATIONFAILURE
DETECTOR /ALARM SYSTEM
FAILURE
DETECTOR /ALARM POWER
FAILURE
INTRUSIONBY
BURGLAR
BURGLARPRESENT BARRIERS
FAIL
— ACOUS…
— SEISMIC FOO…
— ELECTRO-OPTICAL
— MICROWAVE
— EMERGENCY POW…
— BASIC POWER …
SYSTEMCHALLENGE
EXAMPLE PROBLEM — Sclerotic Scurvy . . .(The Astronaut's Scourge)
51
BACKGROUND:Sclerotic scurvy infects ten percent of all returning astronauts. Incubationperiod is 13 days. For a week thereafter, victims of the disease displaysymptoms which include malaise, lassitude, and a very crabby outlook. Atest can be used during the incubation period to determine whether anastronaut has been infected. Anti-toxin, administered during theincubation period, is 100% effective in preventing the disease whenadministered to an infected astronaut. However, for an uninfectedastronaut, it produces disorientation, confusion, and intensifies allundesirable personality traits for about seven days. The test for infectionproduces a false positive result in two percent of all uninfected astronautsand a false negative result in one percent of all infected astronauts. Bothtreatment of an uninfected astronaut and failure to treat an infectedastronaut constitute malpractice.
PROBLEM:Using the test for infection and the anti-toxin, if the test indicates need forit, what is the probability that a returning astronaut will be a victim of mal-practice?
SCLEROTIC SCURVY MALPRACTICE . . .
52
1% of infected cases test falsely negative,receive no treatment, succumb to disease
MALPRACTICE
FAIL TO TREATINFECTION(DISEASE)
INFECTEDASTRONAUT
FALSENEGATIVE
TEST
TREATNEEDLESSLY
(SIDE EFFECTS)
HEALTHYASTRONAUT
FALSEPOSITIVE
TEST
0.10.01 0.02
0.001
0.019
0.018
0.9
2% of uninfected cases test falsely positive,receive treatment, succumb to side effects
10% of returnees are infected — 90% are not infected
What is the greatestcontributor to this
probability?
Should the test beused?
CUTSETS — AIDS TO . . .
53
• System Diagnosis
• Reducing Vulnerability
• Linking to Success Domain
CUT SETS . . .
• A CUT SET…is any group of faulttree initiators which, if all occur, willcause the TOP event to occur.
• A MINIMAL CUT SET…is a leastgroup of fault tree initiators which, ifall occur, will cause the TOP eventto occur.
54
FINDING CUT SETS . . .
55
1. Ignore all tree elements except the initiators (“leaves / basics”).2. Starting immediately below the TOP event, assign a unique letter to
each gate, and assign a unique number to each initiator.3. Proceeding stepwise from the TOP event downward, construct a matrix
using the letters and numbers. The letter representing the TOP eventgate becomes the initial matrix entry. As the construction progresses:
• Replace the letter for each AND gate by the letter(s)/number(s)for all gates/initiators which are its inputs. Display thesehorizontally, in matrix rows.
• Replace the letter for each OR gate by the letter(s)/number(s) forall gates/initiators which are its inputs. Display these vertically, inmatrix columns. Each newly formed OR gate replacement rowmust also contain all other entries found in the original parent row.
4. A final matrix results, displaying only numbers representing initiators.Each row of this matrix is a Boolean Indicated Cut Set. By inspection,eliminate any row that contains all elements found in a lesser row. Alsoeliminate redundant elements within rows and rows that duplicate otherrows. The rows that remain are Minimal Cut Sets.
The method for obtaining Cut Sets used here is based on the MOCUS computer algorithm,attributed to J. B. Fussell.
A CUT SET EXAMPLE . . .
56
PROCEDURE:
• Assign letters togates. (TOP gateis “A.”) Do notrepeat letters.
• Assign numbersto basic initiators.If a basic appearsmore than once,represent it by thesame number ateach appearance.
• Construct a matrix, starting with the TOP “A” gate…
TOP
C
DB
A
1
2 3
42
A CUT SET EXAMPLE (cont) . . .
57
2 2 31 2
1 42 4 3
1 22 3
1 4
A B D
C D
1 D
2 D 3
1 D
2 D 31 4
1 2
TOP event gateis A, the
initial matrixentry.
A is an ANDgate. B & D,its inputs, re-place it hori-
zontally.
B is an ORgate. 1 & C,its inputs, re-place it verti-cally. Each
requires a newrow.
C is an ANDgate. 2 & 3,its inputs,replace it
horizontally.
D (top row), isan OR gate.2 & 4, its in-
puts, replaceit vertically.
Each requires anew row.
D (2nd row), isan OR gate.Replace as
before.
These Boolean-IndicatedCut Sets…
…reduce tothese Minimal
Cut Sets.
Minimal Cut Setrows are least
groups ofinitiators which
will induce TOP.
BooleanEquivalentFault Tree
AN “EQUIVALENT” FAULT TREE . . .
58
TOP
1 22 31 4
An Equivalent FaultTree can be constructedfrom Minimal CutSets. For example,these Minimal CutSets…
…represent this Fault Tree……and this Fault Tree is a Logic Equivalent of theoriginal, for which the Minimal Cut Sets were derived.
1 2 341 2
EQUIVALENT TREES AREN'T ALWAYS SIMPLER . . .
59
This Fault Tree…
…has this Logic Equivalent.
TOP
1
23 45 6
1
23 45 6
1
2
3 45 61
2
3 45 6
TOP4 Gates
6 Initiators
1 2 3 4 5 6
1 / 3 / 5
1 / 3 / 6
1 / 4 / 5
1 / 4 / 6
2 / 3 / 5
2 / 3 / 6
2 / 4 / 5
2 / 4 / 6
MINIMAL CUT SETS
9 Gates24 Initiators
ANOTHER CUT SET EXAMPLE . . .
60
Compare this caseto the first Cut Setexample — notedifferences. TOPgate here is OR. Inthe first example,TOP gate was AND.
• Proceed as with first example…
TOP
1
2
3
3
4
6
G
F
E
D
CB
A
5
4 1
ANOTHER CUT SET EXAMPLE (cont) . . .
61
1 2
F 6
1 E
1 2
3 5 G 6
1 E
1 2
3 5 4 6
1 3
1 4
3 5 1 6
3 4 5 6
1 2
1 31 4
A B
C
1 D
F 6
1 2
3 5 G 6
1 3
1 4
Note that there are fourMinimal Cut Sets.
Co-existence of all of theinitiators in any one of them
will precipitate the TOP event.
An Equivalent Fault Tree can again be constructed…
Construct matrix — make step-by-step substitutions…
Boolean-Indicated Cut Sets
Minimal Cut Sets
ANOTHER “EQUIVALENT” FAULT TREE . . .
62
1 21 31 43 4 5 6
These Minimal Cut Sets…represent this Fault Tree— a Logic Equivalent ofthe original tree.
TOP
1 2 1 3 1 4 3 4 5 6
FROM TREE TO RELIABILITYBLOCK DIAGRAM . . .
63
TOP
1
2
3
3
4
6
G
F
E
D
CB
A
5
4 1
TOP
Blocks represent functions of system elements.Paths through them represent success.
The tree models a system fault, in failure domain.Let that fault be System Fails to Function asIntended . Its opposite, System Succeeds toFunction as Intended , can be represented by aReliability Block Diagram in which success flowsthrough system element functions from left toright. Any path through the block diagram, notinterrupted by a fault of an element, results insystem success.
2
1
3
3
4
5
6
1
4
“Barring” terms denotes consid-eration of their success properties.
(n)
CUT SETS AND RELIABILITY BLOCKS . . .
64
TOP
1
2
3
3
4
6
G
F
E
D
CB
A
5
4 11 21 31 43 4 5 6Minimal Cut Sets
Each Cut Set (horizontal rows in thematrix) interrupts all left-to-right pathsthrough the Reliability Block Diagram.
Note that 3/5/1/6 is aCut Set, but not aMinimal Cut Set. (Itcontains 1/3, a trueMinimal Cut Set.)
6
2
1
3
3
4
5
1
4
CUT SETUSES . . .
65
• Evaluating PT
• Finding Vulnerability to Common Causes
• Analyzing Common Cause Probability
• Evaluating Structural Cut Set “Importance”
• Evaluating Quantitative Cut Set “Importance”
• Evaluating Item “Importance”
CUT SET USES / Evaluating PT . . .
66
PT ≅ Σ P
k =
P1 x P
2 +
P1 x P
3 +
P1 x P
4 +
P3 x P
4 x P
5 x P
6
1 21 31 43 4 5 6
Minimal Cut SetsTOP
1
2
3
3
4
6
G
F
E
D
CB
A
5
4 1
PT
Cut Set Probability (P k ), the product of probabilitiesfor events within the Cut Set, is the probability thatthe Cut Set being considered will induce TOP.
Pk
= Π Pe
= P1
x P2 x P
3 x . . . P
n
1 2
3 5 4 6
1 3
1 4
3 5 1 6
Note that propagating probabilitiesthrough an “unpruned” tree, i.e.,using Boolean-indicated Cut Setsrather than Minimal Cut Sets,would produce a falsely high P T.
CUT SET USES / Common Cause Vulnerability . . .
67
3m 4
m
Uniquely subscript Initiators, using letter indicators of Common Cause susceptibility, e.g. …
llll = location(code where)
m = moistureh = human operatorq = heatf = coldv = vibration…etc.
Some Initiators may be vulnerable to several Common Causes and receive several corresponding subscript designators. Some may have no Common Cause vulnerability — receive no subscripts.
TOP
1v
2h
6m
G
F
E
D
CB
A
5m
PT
1v
3m
4m
All Initiators in this Cut Set are vulnerable to moisture. Mois ture is a Common Cause and can induce TOP.ADVICE: Moisture proof one or more items.
1v
2h
1v
3m
1v
4m
3m
4m
5m
6m
Minimal Cut Sets
Thesemust be
OR
ANALYZING COMMON CAUSE PROBABILITY . . .
68
TOP
PT
Common-CauseInduced Fault
SystemFault
Moisture VibrationHuman
OperatorHeat
…othersAnalyzeas usual…
Introduce each Common Causeidentified as a “Cut Set Killer”at its individual probability levelof both (1) occurring, and (2)inducing all terms within theaffected Cut Set.
CUT SET STRUCTURAL “IMPORTANCE” . . .
69
TOP
1
2
3
3
4
6
G
F
E
D
CB
A
5
4 1
1 21 31 43 4 5 6
Minimal Cut Sets
PT
All other things being equal…
• a LONG Cut Set signalslow vulnerability
• a SHORT Cut Set signalshigher vulnerability
• presence of NUMEROUSCut Sets signals highvulnerability
…and a singlet Cut Set signals a Potential Single-Point Failure.
Analyzing Structural Importance enables qualitative ranking of contributions to System Failure.
CUT SET QUANTITATIVE “IMPORTANCE” . . .
70
1 21 31 43 4 5 6
Minimal Cut Sets
TOP
1
2
3
3
4
6
G
F
E
D
CB
A
5
4 1
PT
The quantitative Importance of a Cut Set(I
k) is the numerical probability that,
given that TOP has occured, that Cut Sethas induced it.
…where Pk = Π P
e= P
3 x P
4 x P
5 x P
6
PT
Ik =
Pk
To reduce system vulnerability most effectively, attack Cut Sets having greater Importance.Generally, short Cut Sets have greater Importance, long Cut Sets have lesser Importance.
Analyzing Quantitative Importance enables numerical ranking of contributions to System Failure.
ITEM “IMPORTANCE” . . .
71
Ie ≅ Σ I
ke
Ne
1 21 31 43 4 5 6
Minimal Cut Sets
The quantitative Importance of an Item (Ie) is the
numerical probability that, given that TOP hasoccured, that Item has contributed to it.
Ne = Number of Minimal CutSets containing Item e
Ike = Importance of the MinimalCut Sets containing Item e
Example…Importance of Item 1…
I1 ≅
PT
(P1 x P
2 ) + (P
1 x P
3) + (P
1 x P
4)
72
PATHSETS — AIDS TO . . .
• Further Diagnostic Measures
• Linking to Success Domain
• Trade / Cost Studies
PATH SETS . . .
• A PATH SET…is a group of fault tree initiatorswhich, if none of them occurs, will guarantee thatthe TOP event cannot occur.
• TO FIND PATH SETS*…change all AND gates toOR gates, and all OR gates to AND. Then proceedusing matrix construction as for cut sets. Pathsets will be the result.
73
* This Cut Set-to-Path Set conversion takes advantage of de Morgan's dualitytheorem. Path Sets are complements of Cut Sets.
A PATH SETEXAMPLE . . .
74
1 21 31 43 4 5 6
1 31 41 51 62 3 4
ThisFaultTreehas…
…these MinimalCut Sets
…and these PathSets.
Path Sets areleast groups of
initiators which, ifthey cannot
occur, guaranteeagainst TOP
occurring.
TOP
1
2
3
3
4
6
G
F
E
D
CB
A
5
4 1
“Barring” terms denotes consid-eration of their success properties.
(n)
PATH SETS AND RELIABILITY BLOCKS . . .
75
TOP
1
2
3
3
4
6
G
F
E
D
CB
A
5
4 1
1 31 41 51 62 3 4
Path Sets
Each Path Set(horizontal rowsin the matrix)represents aleft-to-right paththrough theReliability BlockDiagram.
6
2
1
3
3
4
5
1
4
PATH SETS AND TRADE STUDIES . . .
76
1 31 41 51 62 3 4
Path Sets Sprinkle countermeasure resourcesamongst the Path Sets. Compute theprobability decrement for each newlyadjusted Path Set option. Pick thecountermeasure ensemble(s) givingthe most favorable ∆P
P/∆$. (Selection
results can be verified by computing∆P
T/∆$ for competing candidates.)
PP ≅ Σ P
e
Path Set probability (PP)
is the probability thatthe system will suffer afault at one or more
∆PP
∆$
∆$a
∆$b
∆$c
∆$d
∆$e
∆PPa
∆PPb
∆PPc
∆PPd
∆PPe
points along the operational routemodeled by the path. To minimizefailure probability, minimize Path Setprobability.
a -
b -
c -
d -
e -
6
2
1
3
3
4
5
1
4
REDUCING VULNERABILITY — A SUMMARY . . .• Inspect tree — find/operate on major PT contributors…
- Add intervenors / redundancy (lengthen cut sets).- Derate components (increase robustness / reduce Pe).- Fortify maintenance / parts replacement (increase MTBF).
• Examine / alter system architecture — increase path set/cut set ratio.
• Evaluate Cut Set Importance. Rank items using Ik.Identify items amenable to improvement.
• Evaluate Item Importance. Rank items using Ie.Identify items amenable to improvement.
• Evaluate Path Set Probability.Reduce PP at most favorable ∆∆∆∆P/∆∆∆∆$.
77
Ie ≅≅≅≅ ΣΣΣΣ Ike
Ne
Ik = PT
Pk
PP ≅≅≅≅ ΣΣΣΣ Pe
For all new countermeasures, THINK… • COST • EFFECTIVENESS • FEASIBILITY (incl. schedule)AND
Does the new countermeasure … • Introduce new HAZARDS? • Cripple the System?
SOME DIAGNOSTIC ANDANALYTICAL GIMMICKS . . .
• A Conceptual Probabilistic Model
• Sensitivity Testing
• Finding a PT Upper Limit
• Limit of Resolution — Shutting off Tree Growth
• State–of–Component Method
• When to Use Another Technique — FMECA
78
SOME DIAGNOSTIC GIMMICKS . . .
79
TOP
PT
1 2 3 4 5
6 7 8 9
10 11 12 13 14 15
16 17 18 19 20 21
22 23 24 25 26 27 28 29
30 31 32 33 34
using a “generic”all-purpose fault tree…
THINK “ROULETTE WHEELS” . . .
80
TOP
PT
1 2 3 4 5
6 9
10 11 12 13 14 15
16 17 18 19 20 21
22 23 24 25 26 27 28 29
30 31 32 33 34
A convenient, thought-toolmodel of probabilistic treemodeling…
7 Imagine a roulette wheel representing each initiator.The “peg count” ratio for each wheel is determinedby probability for that initiator. Spin all initiatorwheels once for each system exposure interval.Wheels “winning” in gate-opening combinationsprovide a path to the TOP.
P22
= 3 x 10-3
1000 peg spaces997 white
3 red
USE SENSITIVITY TESTS . . .
81
Gaging the “nastiness”ofuntrustworthy initiators…TOP
PT
1 2 3 4 5
6 7 8 9
10 11 12 13 14 15
16 17 18 19 20 21
22 23 24 25 26 27 28 29
30 31 32 33 34
Embedded within the tree, there's a bothersome initiatorwith an uncertain P
e. Perform a crude sensitivity test to
obtain quick relief from worry… or , to justify the urgencyof need for more exact input data:
1.) Compute PT for a nominal value of P
e. Then,
recompute PT for a new P
e′ = P
e+ ∆P
e.
If this sensitivity exceeds ≈ 0.1 in a large tree, work to finda value for P
e having less uncertainty… or …
2.) Compute PT for a value of P
e at its upper credible limit.
Is the corresponding PT acceptable? If not, get a better P
e.
P10 = ?…now, compute the “Sensitivity” of P
e =
∆Pe
∆PT
FIND A MAX PT LIMIT QUICKLY . . .
82
TOP
PT
1 2 3 4 5
6 7 8 9
10 11 12 13 14 15
16 17 18 19 20 21
22 23 24 25 26 27 28 29
30 31 32 33 34
The “parts-count” approachgives a sometimes-usefulearly estimate of P
T …
PT cannot exceed an upper bound given by:
PT(max)
= ΣPe = P
1 + P
2 + P
3 + P
n…
?
HOW FAR DOWN SHOULD A FAULT TREE GROW . . . ?
83
TOP
PT
1 2 3 4 5
6 7 8 9
10 11 12 13 14 15
16 17 18 19 20 21
?
Where do you stop the analysis? The analysis is a Risk Managemententerprise. The TOP statement gives severity . The tree analysis providesprobability . ANALYZE NO FURTHER DOWN THAN IS NECESSARY TOENTER PROBABILITY DATA WITH CONFIDENCE. Is risk acceptable? If YES,stop. If NO, use the tree to guide risk reduction. SOME EXCEPTIONS…1.) An event within the tree has alarmingly high probability. Dig deeper
beneath it to find the source(s) of the high probability.2.) Mishap autopsies must sometimes analyze down to the cotter-pin level to
produce a “credible cause” list.
Severity Probability
Initiators / leaves / basics define theLIMIT OF RESOLUTION
of the analysis.
STATE–OF–COMPONENT METHOD . . .
84
RELAY K-28CONTACTS FAIL
CLOSED
BASICFAILURE/
RELAYK-28
RELAYK-28
COMMANDFAULT
RELAYK-28 SECONDARY
FAULT
WHEN: Analysis has proceded to thedevice level — i.e., valves, pumps,switches, relays, etc.
HOW: Show device fault/failure in the mode
needed for upward propagation. Install an OR gate. Place these 3 events beneath the OR.
This represents internal“self” failures under normalenvironmental and servicestresses — e.g., coilburnout, spring failure,contacts drop off…
Analyze further to find thesource of the fault condition,induced by presence/absence of externalcommand “signals.” (Omitfor most passive devices —e.g., piping.)
This represents faults fromenvironmental and servicestresses for which thedevice is not qualified —e.g., component struck byforeign object, wrongcomponent selection/installation. (Omit, ifnegligible.)
EXECUTIVE SUMMARY (Abstract of complete report)SCOPE of the analysis…
Brief system descriptionTOP Description/Severity BoundingAnalysis Boundaries
Physical Boundaries Interfaces TreatedOperational Boundaries Resolution LimitOperational Phases Exposure IntervalHuman Operator In/Out Others…
THE ANALYSIS…Discussion of Method (Cite Refs.)Software UsedPresentation/Discussion of the TreeSource(s) of Probability Data (If quantified)Common Cause Search (If done)Sensitivity Test(s) (If conducted)Cut Sets (Structural and/or Quantitative Importance, if analyzed)Path Sets (If analyzed)Trade Studies (If done)
FINDINGS…TOP Probability (Give Confidence Limits)Comments on System Vulnerability
Chief ContributorsCandidate Reduction Approaches (If appropriate)
CONCLUSIONS AND RECOMMENDATIONS …Risk Comparisons (“Bootstrapping” data, if appropriate)Is further analysis needed? …by what method(s)?
THE FAULT TREE ANALYSIS REPORT . . .
85
Say what is analyzedand
what is not analyzed.
T I T L E
COMP ANYA uthorDateetc.
Show Tree as Figure.Include Data Sources,Cut Sets, Path Sets,
etc. as Tables.
CHARACTERISTIC FTA FMECASELECTION PREFERRED
FTA vs FMECA SELECTION CRITERIA* . . .
86
*Adapted from “Fault Tree Analysis Application Guide,” Reliability Analysis Center, Rome Air Development Center.
Safety of public/operating/maintenance personnel ✓
Small number/clearly defined TOP events ✓
Indistinctly defined TOP events ✓
Full-Mission completion critically important ✓
Many, potentially successful missions possible ✓
“All possible” failure modes are of concern ✓
High potential for “human error” contributions ✓
High potential for “software error” contributions ✓
Numerical “risk evaluation” needed ✓
Very complex system architecture/many functional paths ✓
Linear system architecture with little human/software influence ✓
System irrepairable after mission starts ✓
FAULT TREE CONSTRAINTS ANDSHORTCOMINGS . . .• Undesirable events must be foreseen and are only
analyzed singly.
• All significant contributors to fault/failure must beanticipated.
• Each fault/failure initiator must be constrained totwo conditional modes when modeled in the tree.
• Initiators at a given analysis level beneath acommon gate must be independent of each other.
• Events/conditions at any analysis level must betrue, immediate contributors to next–level events/conditions.
• Each initiator's failure rate must be a predictableconstant.
87
COMMON FAULT TREE ABUSES . . .
• Over–analysis — “Fault Kudzu”
• Unjustified confidence in numerical results… 6.0232 x 10–5 …±±±± ?
• Credence in preposterously low probabilities…1.66 x 10–24/hour
• Unpreparedness to deal with results (particularly quantitative)…Is 4.3 x 10–7/hour acceptable for a catastrophe?
• Overlooking common causes…Will a roof leak or a shaking floor wipe you out?
• Misapplication…Would Event Tree Analysis (or another technique) serve better?
• Scoping changes in mid–tree
88
FAULT TREE PAYOFFS . . .
• Gaging/quantifying system failure probability.
• Assessing system Common Cause vulnerability.
• Optimizing resource deployment to controlvulnerability.
• Guiding system reconfiguration to reducevulnerability.
• Identifying Man Paths to disaster.
• Identifying potential single point failures.
• Supporting trade studies with differential analyses.
89
FAULT TREE ANALYSIS is a Risk Assessmententerprise. Risk Severity is defined by the TOP event.Risk Probability is the result of the tree analysis.
CLOSING CAVEATS . . .
• Be wary of the ILLUSION of SAFETY! Low probabilitydoes not mean that a mishap won't happen!
• THERE IS NO ABSOLUTE SAFETY! An enterprise issafe only to the degree that its risks are tolerable!
• Apply broad confidence limits to probabilitiesrepresenting human performance!
• A large number of systems having low probabilities offailure means that A MISHAP WILL HAPPEN . . .somewhere among them!
90
P1 + P
2 + P
3 + P
4 + - - - - - P
n ≈ 1
more . . .
CAVEATS (conc.) . . .
Don't drive the numbers into the ground!
91
Do you REALLY have enough data to justify QUANTITATIVE ANALYSIS?
For 95% Confidence…
We must have NO FAILURES in… to give PF ≅ … and R ≅ …
1000 tests 3 x 10–3 0.997
300 tests 10–2 0.99
100 tests 3 x 10–2 0.97
30 tests 10–1 0.9
10 tests 3 x 10–1 0.7
ASSUMPTIONS:
• Stochastic System Behavoir
• Constant System Properties
• Constant Service Stresses
• Constant EnvironmentalStresses
ANALYZE ONLY TO TURN RESULTS INTODECISIONS . . .
92
“Perform an analysis only to reach adecision. Do not perform an analysis if thatdecision can be reached without it. It is noteffective to do so. It is a waste ofresources.”
Dr. V. L. GroseGeorge Washington University
TOP
P1 P2
P3 >> P1 ≈ P2
P3 << P1 ≈ P2
P2 >> P1
P2 << P1P1 P2
TOP
P3P2P1
TOP
P3P2P1
TOP
P1 P2
TOP
TOP
P1 P2
≈
≈
≈
≈
TOP
P1
TOP
P1
*Adapted from “Probabilistic Risk Assessment;” Ernest J. Henley and Hiromitsu Kumamoto; IEEE Press; 1991
Very high probability eventin presence of one or more
low probability events:
IGNORE HIGH PROBABILITY EVENT .
Very low probability eventin presence of one or more
high probability events:
IGNORE LOW PROBABILITY EVENT .
AN
D G
ate
OR
Gate
USEFUL NUMERICALSIMPLIFICATIONS…
9382.a
EXPONENTIAL NOTATION…
94
103 = 1000. 10–3 = = 0.00111000
Negative exponentindicates reciprocal.
105 = 100000. 10–5 = = 0.000011100000
Exponent showsdecimal location.
CONVENTION
6.28 x 10–3 = 6.28 x = = 0.006286.28
1000
1
1000
6.28 x 103 = 6.28 x 1000 = 6280
EXAMPLES
MULTIPLICATION(multiply coefficients, and add exponents)
DIVISION(divide coefficients, and subtract exponents)
(2.3 x 105) x (4.5 x 10–2) = 10.35 x 103 = 1.035 x 104
(2.3 x 10–5) x (4.5 x 102) = 10.35 x 10–3 = 1.035 x 10–2
(2.3 x 10–5) x (4.5 x 10–2) = 10.35 x 10–7 = 1.035 x 10–6
RULE EXAMPLES
RULE
(2.3 x 105) x (4.5 x 102) = 10.35 x 107 = 1.035 x 108
10.35 x 107
(4.5 x 102)= (2.3 x 105) 10.35 x 10–3
(4.5 x 102)= (2.3 x 10–5)
EXAMPLES
EXAMPLESRULERAISING TO POWERS/EXTRACTING ROOTS(multiply/divide exponents)
(2 x 102)3 = 8 x 106 (9 x 108)¤ = 3 x 104
USEFUL MATHEMATICAL OPERATORS…
95
A = ∑ ae = a1 + a2 + a3 + ane = 1
e = n
• • • •
A = ∏ ae = a1 x a2 x a3 x an• • • •
e = n
e = 1
A = ae = 1 – [(1–a1)x(1–a2)x (1–a3)x (1–an)]
∏
• • • •e = 1
e = n
SIMPLE SUM
SIMPLE PRODUCT
COFUNCTION SUM
96
REDUCING SYSTEM VULNERABILITY…
• Fortify maintenance
• Derate components
• Alter architecture…
• Relocate existing components
• Add redundancy
• Loosen coupling / make system “forgiving”
• Suppress common causes
• Reduce stresses
• Service stresses
• Environmental stresses