FEA and Deepwater Project Summary (2007 - 2014)

APS/AWE TUI Expansion Conceptual Project for Magnum Subsea System, New Zealand. 2 water injection manifolds and 2 Gas Lift manifolds

conceptual design project.

Riser stalk on lifting with 13 degrees tilt, Riser upending analysis - Horizontal position 0º, 15º position, 30º position, 45º position, 60º position, 75º position and 90º position

1

Apache Van Gogh Project, Gas Injection Manifold Systems For Exxonmobil, Australia

Light Weight Substructure research and development for OPE Company.

2

9th Well Manifold, Tahiti Development Subsea Project For Chevron North America Exploration & Production Company.

)

Figure 5.0b: Isometric View of 9th well manifold Structure (SACS Model)

Kizomba Manifold Development FEED Project For Exxonmobil, Angola, West Africa.

Isometric View of SDU Structure (SACS Model)

3

Isometric View of UTA Structure (SACS Model)

Isometric View of SDU UTA Structure (SACS Model)

Puffin Development Subsea Manifolds Design for AED.

4

Tahiti North (2 slot) Water Injection Pipeline End Manifold (PLEM) Systems For Chevron North America Exploration & Production Company

5

Tahiti South (4 slot) Water Injection Pipeline End Manifold (PLEM) Systems For Chevron North America Exploration & Production Company

Hub GHO 6"-6" capacity check analysis

6

Hub HCS 28"-23" capacity check analysis

Blind Flange 12" capacity check analysis

7

Blind Flange 24" capacity check analysis

Blind Flange 6" capacity check analysis

8

Test Hub 12" capacity check analysis

GHO strength capacity of guide funnel and guide rods

9

Guide funnel and guide rods welding Capacity

Normal operation Inboard support structure with reaction plate strength capacity analysis - 1st End (6" GHO System)

10

Normal operation Inboard support structure with reaction plate strength capacity analysis - 2nd End (6" GHO System)

Normal operation Inboard support structure with reaction plate strength capacity analysis - 1st End (12" GHO System)

11

Normal operation Inboard support structure with reaction plate strength capacity analysis - 2nd End (12" GHO System)

Wellhead protection structures

12

Pig launcher

Lifting Clamp Analysis

13

10’ Pulp Piece + Blind Flange

Xmas Hydrotest Hub + Blind Hub

14

Water Injection Hub Analysis

Lifting analysis

15

Hydrotest pressure - 8’ Pulp Piece + Blind Flange

Stinger – Trunnion Capacity Check

16

Gangway’s Support Capacity Check

Stern padeye Capacity Check

17

18