Fiber Glass Systems, L.P. Little Rock Wastewater Industrial
Wastewater Discharge Permit Application
April 8, 2013
-
Little Rock Wastewater Industrial Wastewater Discharge Permit Application Prepared for: Fiber Glass Systems, L.P. 2700 West 65th Street Little Rock, AR 72209
Prepared by: GBMc & Associates 219 Brown Lane Bryant, AR 72022
April 8, 2013
-
April 10, 2013 i
CONTENTS
Little Rock Wastewater Industrial Permit Application Form
APPENDICES Appendix A – Section D.2 Facility Process List Appendix B – Section D.3 Raw Material List Appendix C – Section D.4 Wastewater Generation Sources Appendix D – Section E.1 MSDS on CD Appendix E – Section E.2 Spill Control Plan Appendix F – Section F.1 Wastewater Treatment System Plans and Diagrams
-
rmechlingTypewritten Text
rmechlingTypewritten Text
rmechlingTypewritten TextX
rmechlingTypewritten TextFiber Glass Systems
rmechlingTypewritten TextX
rmechlingTypewritten Text2700 West 65th Street, Little Rock, AR 72209
rmechlingTypewritten Text501-568-4010
rmechlingTypewritten Text501-568-3029
rmechlingTypewritten Text501-258-7273
rmechlingTypewritten TextJerry Givens
rmechlingTypewritten TextPlant Manager
rmechlingTypewritten TextBob Gasper
rmechlingTypewritten TextHealth, Safety & Environmental Specialist
rmechlingTypewritten TextJerry Givens
rmechlingTypewritten TextPlant Manager
rmechlingTypewritten TextX
-
rmechlingTypewritten TextNOV Fiber Glass Systems, PO Box 968, Sand Springs, OK 74065-0968
rmechlingTypewritten TextPhone: 918-246-2284
rmechlingTypewritten Text
rmechlingTypewritten Text
rmechlingTypewritten TextFax: 918-245-7566
rmechlingTypewritten TextContact: Mike Thayer
rmechlingTypewritten TextHossein Arien, President
rmechlingTypewritten Text17115 San Pedro Ave
rmechlingTypewritten TextSan Antonio, TX 78237
rmechlingTypewritten TextPhone: 210-477-7500
rmechlingTypewritten TextFax: 210-477-7560
rmechlingTypewritten Text3089
rmechlingTypewritten TextX
rmechlingTypewritten TextX
rmechlingTypewritten Text
rmechlingTypewritten TextARR00A694
rmechlingTypewritten Text0587-AR-10
rmechlingTypewritten TextX
rmechlingTypewritten TextN/A
-
rmechlingTypewritten Text307-0905.300
rmechlingTypewritten Text307-0910.300
rmechlingTypewritten Text589
rmechlingTypewritten TextX
rmechlingTypewritten TextX
rmechlingTypewritten TextCooling tower evaporation, evaporation from mandrel cooling
rmechlingTypewritten TextX
rmechlingTypewritten TextM-F; 7:30 am - 4:30 pm
rmechlingTypewritten Text6:30 am
rmechlingTypewritten Text3:30 pm
rmechlingTypewritten Text35
rmechlingTypewritten TextProduction/maintenance/cleanup/administrative
rmechlingTypewritten Text
-
rmechlingTypewritten TextX
rmechlingTypewritten TextX
rmechlingTypewritten TextFiberglass reinforced epoxy and vinyl ester resin piping systems (pipe, fittings, and adhesives)
rmechlingTypewritten TextSee Appendix A
rmechlingTypewritten TextSee Appendix B
-
rmechlingTypewritten TextSee Appendix C
rmechlingTypewritten TextX
rmechlingTypewritten TextX
rmechlingTypewritten TextX
rmechlingTypewritten TextSee Appendix D
rmechlingTypewritten TextX
rmechlingTypewritten TextSee Appendix E
-
rmechlingTypewritten TextX
rmechlingTypewritten TextN/A
rmechlingTypewritten TextOil skimming, solids settling, neutralization, and aeration.
rmechlingTypewritten TextSee Appendix F for treatment system plans and diagrams.
rmechlingTypewritten TextX
rmechlingTypewritten TextN/A
rmechlingTypewritten TextX
rmechlingTypewritten TextTwo Pines Landfill - Solids from treatment system - Every 2 years
rmechlingTypewritten TextFCC Environmental - Oil recycling - as needed
rmechlingTypewritten TextFiber Glass Systems maintains a SWPPP, SPCC Plan, and other pollution prevention policies/controls
rmechlingTypewritten Text(i.e, good housekeeping, oil handling procedures, spill clean-up procedures, etc) that controls any
rmechlingTypewritten Textpotential discharge of pollutants.
-
rmechlingTypewritten TextTo be determined
rmechlingTypewritten Text27
rmechlingTypewritten Text*
rmechlingTypewritten Text*estimate based on existing
rmechlingTypewritten Textflow data from NPDES Permit
rmechlingTypewritten TextProsonic FMU 860
-
rmechlingTypewritten TextJerry Givens, Plant Manager
-
Appendix A Section D.2- Facility Process List
-
Appendix B Section D.3 - Raw Materials List
-
Appendix C Section D.4 - Wastewater Generation Sources
-
Appendix D Section E.1 - Material Safety Data Sheets CD
-
Appendix E Section E.2 - Spill Control Plan
-
Appendix F Section F.1 -Wastewater Treatment System Plans
and Diagrams
General Cover-No PicturesTITLE PAGE(1)Little Rock WastewaterIndustrial Wastewater DischargePermit ApplicationApril 8, 2013
ContentsCONTENTS
Little Rock Wastewater Industrial Permit ApplicationAppendix PagesAppendix AAppendix BAppendix CAppendix DAppendix ESection E.2 - Spill Control Plan Appendix F