PPP PROJECTS for 2011 Rollout
Solicited
• NAIA Expressway (Phase II)
• MRT/LRT Expansion Program: Privatization of MRT 3 Operation &Maintenance
• MRT/LRT Expansion Program: Privatization of LRT 1 Operation & Maintenance
• LRT Line 2 East Extension Project
• DaangHari – SLEX Link Road Project
• MRT/LRT Expansion Program:LRT 1 South Extension Project
• CALA Expressway - Manila side section (27.5 km)
• New Bohol Airport Development
• Puerto Princesa Airport Development
• New Legaspi (Daraga) Airport Development
• Privatization of Laguindingan Airport Operation and Maintenance
Unsolicited
• NLEX-SLEX Connector
Project Title
NAIA Expressway (Phase II)
Description
The project will link Skyway and Manila-Cavite Coastal Expressway. It will provide vital access to NAIA Terminals 1, 2, & 3. Economic zones in Cavite Province will benefit through easier and faster transportation of products to NAIA as well as to Manila Port through this link and the NLEx-SLEx Link Expressway. L = 5.19 km No. of Lanes = 4 lanes
Mode PPP Implementation Schedule October 2011 –September 2014
Project Cost PhP 10,590 Million (US$235.33 Million)
Sponsoring Agency DPWH
Project Status
• Publication of Invitation to Bid - May 2011 • Detailed Design and Construction Schedule – October 2011 to September 2014
Contact Information
Name : Sec. Singson / Asec. Cabral / Dir. Firmalino / Asst. Dir. Garsuta
Designation : Secretary / Asec. for Planning / PMO BOT Director / PMO BOT Asst. Director
Agency : DPWH
Telephone no. : (63 2) 304-3300 / 304-3319 / 304-3762 / 304-3069
Fax No : (63 2) 304-3020 / 304-3033 / 304-3824 / 304-3069
Email Address : singson.rogelio@dpwh.gov.ph / cabral.ma_catalina@dpwh.gov.ph /
firmalino.bienvenida@dpwh.gov.ph / garsuta.rebecca@dpwh.gov.ph
NAIA Expressway,
Phase 2
2
Project Title DAANG HARI – SLEX LINK ROAD PROJECT
Description
The Project is a new 3.68 kilometer, 4-lane paved toll road that will pass through the New Bilibid Prison reservation that will connect Bacoor, Cavite to the South Luzon Expressway near the Susana Heights area. The proposed new linkage will complement the Cavite-Laguna-east-west highway and will address the requirement for additional access between Metro Manila and Cavite where rapid urbanization and consequent worsening of traffic situation is being experienced. Project components:
• 2 overpasses • 4 local roads • 1 undercrossing • 1 rotunda • drainage structures
Mode PPP Implementation Schedule 3rdQ 2011 – 1stQ 2013
Project Cost PhP1,600 Million US$35.5 Million
Sponsoring Agency DTI /NDC/PNCC
Project Status
• Advertisement/Publication: April 2011
Contact Information
Name : Sec. Gregory Domingo/ Ma. Lourdes F. Rebueno/ Atty Luis F. Sison Designation : Secretary, DTI/General Manager, NDC/President and CEO, PNCC Agency : DTI/NDC/PNCC Telephone no. : (63 2) 899-7450/(63 2) 840-3936/(63 2) 584-6933 Fax No. : (63 2) 840 4862 Email Address : Secretary@dti.gov.ph/mlfr@ndc.gov.ph/lfsison1943@yahoo.com
DAANG HARI
Project Title
Description
The project aims to integrate MRT Line 3 operation and maintenance to a private sector service provider during the interim period of 3-4 years. After this O&M period, the LRT Line 1 South Extension Project contractor is expected to assume overall responsibility for the integrated LRT Line 1 and MRT Line 3 systems.
Mode PPP
Project Cost PhP 6,300 Million (US$140 Million)
Project Status
• Due diligence review, contract packaging, consultant for MRT 3
• Publication of Invitation to Bid - March
Contact Information
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary for Policy, Agency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : benny.reinoso@gmail.com
MRT/LRT Expansion Program: Privatization of MRT 3 Operation and Maintenance
MRT/LRT LINES
The project aims to integrate MRT Line 3 operation and maintenance to a private sector service provider
4 years. After this O&M period, the LRT Line 1 South Extension Project contractor is expected to assume overall responsibility for the integrated LRT Line 1 and MRT
Implementation Schedule 2011-2014
Sponsoring Agency DOTC/LRTA
Due diligence review, contract packaging, preparation of bid documents of projects for PPP to be undertakenby Systra,
March 2011
RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications
benny.reinoso@gmail.com
2014
DOTC/LRTA
preparation of bid documents of projects for PPP to be undertakenby Systra,
Project Title
Description
The project aims to integrate LRT Line 1 operation and maintenance to a private sector service provider during the interim period of 3-4 years. After this O&M period, the LRT Line 1 South Extension Project contractor is expected to assume overall responsibility for the integrated LRT Line 1 and MRT Line 3 systems.
Mode PPP
Project Cost PhP7,700 Million (US$171.11 Million)
Project Status
• Due diligence review, contract packaging, preparation of bid documents of projects for PPP to be undertakenby Systra, consultant for MRT 3
• Publication of Invitation to Bid - March
Contact Information
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : benny.reinoso@gmail.com
MRT/LRT Expansion Program: Privatization of LRT 1 Operation and Maintenance
MRT/LRT LINES
The project aims to integrate LRT Line 1 operation and maintenance to a private sector service provider
4 years. After this O&M LRT Line 1 South Extension Project
contractor is expected to assume overall responsibility for the integrated LRT Line 1 and MRT
Implementation Schedule 2011-2014
Sponsoring Agency DOTC/LRTA
Due diligence review, contract packaging, preparation of bid documents of projects for PPP to be undertakenby Systra,
March 2011
RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications
benny.reinoso@gmail.com
2014
DOTC/LRTA
Due diligence review, contract packaging, preparation of bid documents of projects for PPP to be undertakenby Systra,
Project Title
Description
The project involves the expansion, operation and maintenance of existing LRT Line 2. Expansion covers the construction of a 4 kilometer eastern extension of LRT Line 2 from Santolan in Pasig City to Masinag Junction in Antipolo, Rizal with additional 2 passenger stations to be located at Sta. Lucia Mall and at Masinag.
Mode PPP
Project Cost PhP 11,300 Million (US$251.11 Million)
Project Status
• Pre-FS on Manila LRT Line 2 Extension Project by • FS thru JICA technical assistance to reconfigure the project into PPP commence
extension options, scope of work and project costs• Publication of Invitation to Bid - November 2011
Contact Information
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : benny.reinoso@gmail.com
LRT Line 2 East Extension Project
LINE 2 EAST EXTENSION ALIGNMENT
The project involves the expansion, operation and Expansion
covers the construction of a 4 kilometer eastern extension of LRT Line 2 from Santolan in Pasig City to Masinag Junction in Antipolo, Rizal with additional 2 passenger stations to be located at Sta. Lucia Mall
Implementation Schedule 2011-2014
Sponsoring Agency DOTC/LRTA
FS on Manila LRT Line 2 Extension Project by Japan External Trade Organization (JETRO) completed in March 2010JICA technical assistance to reconfigure the project into PPP commenced in January 2011. FS will validate
extension options, scope of work and project costs November 2011
S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications
so@gmail.com
LINE 2 EAST EXTENSION ALIGNMENT
2014
DOTC/LRTA
completed in March 2010 in January 2011. FS will validate
Project Title
Description
The project involves the extension of the existing 15kilometer LRT Line 1 system southward to Bacoor, Cavite by additional 11.7 kilometers which includes 8 passenger stations with provision for 2 additional future passenger stations, a satellite depot for light maintenance to be located at the southern end of the proposed line, and intermodal facilities installed at high-demand stations, including the provision of additional rolling stocks to meet the current demand and additional load requirements once the MRT Line 3 and LRT Line 1 are integrated.
Mode PPP
Project Cost PhP70,000 Million (US$1,555.55 Million)
Project Status
• Due diligence review, contract packaging, preparation of bid documents of projects for PPP Systra
December 2010 • Publication of Invitation to Bid - July 2011
Contact Information
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : benny.reinoso@gmail.com
MRT/LRT Expansion Program: LRT 1 South Extension Project
MRT/LRT LINES
The project involves the extension of the existing 15-kilometer LRT Line 1 system southward to Bacoor,
kilometers which includes 8 passenger stations with provision for 2 additional future passenger stations, a satellite depot for light maintenance to be located at the southern end of the proposed line, and intermodal facilities installed at
ations, including the provision of additional rolling stocks to meet the current demand and additional load requirements once the MRT Line
Implementation Schedule 2011-2015
Sponsoring Agency DOTC/LRTA
Due diligence review, contract packaging, preparation of bid documents of projects for PPP Systra commenced in
July 2011
RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications
benny.reinoso@gmail.com
2015
DOTC/LRTA
commenced in
Project Title CALA Expressway - Manila side section (27.5 km)
Description
The project will provide vital access between various economic zones in Cavite Province and NAIA, Manila Port and Batangas Port, and contribute to the economic development and decongestion of traffic along Cavite roads, particularly Aguinaldo Highway. This is the extension of the ongoing Manila-Cavite Coastal Expressway Extension and ends at Silang, Cavite Province. It is an at-grade expressway. L = 27.5 km No. of Lanes = 6 lanes
Mode PPP Implementation Schedule May 2012 - June 2016
Project Cost PhP10,500 Million
(US$233.33 Million) Sponsoring Agency DPWH
Project Status
• Publication of Invitation to Bid: December 2011 • Detailed Design and Construction Schedule – May 2012 – December 2015
Contact Information
Name : Sec. Singson / Asec. Cabral / Dir. Firmalino / Asst. Dir. Garsuta
Designation : Secretary / Asec. for Planning / PMO BOT Director / PMO BOT Asst. Director
Agency : DPWH
Telephone no. : (63 2) 304-3300 / 304-3319 / 304-3762 / 304-3069
Fax No : (63 2) 304-3020 / 304-3033 / 304-3824 / 304-3069
Email Address : singson.rogelio@dpwh.gov.ph / cabral.ma_catalina@dpwh.gov.ph /
firmalino.bienvenida@dpwh.gov.ph / garsuta.rebecca@dpwh.gov.ph
CALA Expressway –
Manila side Section
Project Title
Description
The project involves the construction of a new airport of international standards with 2,500m X 45m runway to replace the existing Tagbilaran Airport.
Mode PPP
Project Cost PhP7,600 Million (US$168.89 Million)
Project Status
• Updating of FS to reconfigure the project into PPP and validate project scope, costs and structure• Preparation of PPP structure and bid documents
Agency (JICA) • Publication of Invitation to Bid: August 2011
Contact Information
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : benny.reinoso@gmail.com
New Bohol Airport Development
The project involves the construction of a new airport standards with 2,500m X 45m runway
Implementation Schedule 2012-2014
Sponsoring Agency DOTC/MIAA/CAAP
the project into PPP and validate project scope, costs and structure bid documents through technical assistance from Japan International Cooperation
: August 2011
RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications
benny.reinoso@gmail.com
New Bohol
Airport
2014
DOTC/MIAA/CAAP
Japan International Cooperation
Project Title
Description
The Project involves the rehabilitation/ improvement of the existing Puerto Princesa Airport to meet the standards of the International Civil Aviation Organization (ICAO).through the construction of new landside facilities in the north western side of the existing runway such as passenger terminal building, control tower, administration & operation building, cargo terminal building, rescue & fire fighting building and other support facilities, the construction of new apron and connecting taxiways, upgrading of the existing 2.6 km runway and its strip, and the provisof new navigational and traffic control equipment.
Mode PPP
Project Cost PhP4,400 Million (US$97.78 Million)
Project Status
• Updating of FS to reconfigure the project into PPP and • Preparation of PPP structure and bid documents • Publication of Invitation to Bid: August 2011
Contact Information
Name : RUBEN S. REINOSO, Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : benny.reinoso@gmail.com
Puerto Princesa Airport Development
PROJECT LOCATION
The Project involves the rehabilitation/ improvement existing Puerto Princesa Airport to meet the
standards of the International Civil Aviation Organization (ICAO).through the construction of new landside facilities in the north western side of the existing runway such as passenger terminal building,
tower, administration & operation building, cargo terminal building, rescue & fire fighting building and other support facilities, the construction of new apron and connecting taxiways, upgrading of the existing 2.6 km runway and its strip, and the provision of new navigational and traffic control equipment.
Implementation Schedule 2012-2014
Sponsoring Agency DOTC/CAAP
Updating of FS to reconfigure the project into PPP and validate project scope, costs and structure bid documents through technical assistance from Singapore Government
August 2011
RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications
benny.reinoso@gmail.com
Puerto Princesa Airport
2014
DOTC/CAAP
from Singapore Government
Project Title
Description
The project involves the preparation of the detailed engineering design, and construction of airport facilities. It also includes land acquisition of about 180 hectares. Project components are the following: Landside - Passenger Terminal, Cargo Building, Control Tower, Administration Building, Vehicle Parking Area 9VPA), and other site development; Airside - Runway Strip/Runway, Taxiway, Apron, Air Traffic/navigation Equipment.
Mode PPP
Project Cost PhP3,200 Million (US$71.11 Million)
Project Status
• Updating of FS to reconfigure the project into PPP and • Preparation of PPP structure and bid documents • Publication of Invitation to Bid: August 2011
Contact Information
Name : RUBEN S. REINOSO,Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : benny.reinoso@gmail.com
New Legaspi (Daraga) Airport Development
PROJECT LOCATION
The project involves the preparation of the detailed engineering design, and construction of airport
includes land acquisition of about 180 hectares. Project components are the following:
Passenger Terminal, Cargo Building, Control Tower, Administration Building, Vehicle Parking Area 9VPA), and other site development;
unway, Taxiway, Apron, Air
Implementation Schedule 2012-2014
Sponsoring Agency DOTC/CAAP
Updating of FS to reconfigure the project into PPP and validate project scope, costs and structure. bid documents through technical assistance from Singapore Government
August 2011
RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications
benny.reinoso@gmail.com
2014
DOTC/CAAP
from Singapore Government
Project Title Privatization of Laguindingan Airport Operation and Maintenance
Description
The project involves the privatization of the operation and maintenance of the Laguindingan Airport to reduce government expenditure and increase current and future service levels of the airport. The operation and maintenance through concession covers the newly constructed airport on a 393hectare property complete with facilities of international standards. The airport canaccommodate 1.2 million passenger per year based on its Master Plan.
Mode PPP
Project Cost PhP 1,500 million (US$33.33 Million)
Project Status
• Preparation of business case and tender documents for the privatization of the airport operation assistance from United Stated trade and Development Agency (
• Publication of Invitation to Bid: June 2011 Contact Information Name : RUBEN S. REINOSO, JR.Designation : Undersecretary for Policy, Planning and Project ManagementAgency : Department of Transportation and CommunicationsTelephone no. : (632) 723-1580 Fax No. : (632) 727-7948 Email Address : benny.reinoso@gmail.com
Privatization of Laguindingan Airport Operation and Maintenance
The project involves the privatization of the operation and maintenance of the Laguindingan Airport to
expenditure and increase current
through concession covers the newly constructed airport on a 393-hectare property complete with facilities of international standards. The airport can accommodate 1.2 million passenger per year based
Implementation Schedule 2011-2013
Sponsoring Agency DOTC/CAAP
Preparation of business case and tender documents for the privatization of the airport operation through technical assistance from United Stated trade and Development Agency (USTDA) assistance
: June 2011
RUBEN S. REINOSO, JR. Undersecretary for Policy, Planning and Project Management Department of Transportation and Communications
benny.reinoso@gmail.com
Laguindingan Airport
Privatization of Laguindingan Airport Operation and Maintenance
2013
DOTC/CAAP
through technical
12
Unsolicited
Project Title NLEX-SLEX CONNECTOR
Description
The project involves the construction of 13.4 km.
4-lane elevated expressway over the Philippine
National Railway (PNR) right of way which starts
at Caloocan City and ends at Makati City.
The project aims to close the gap and complete
the north-south Luzon industrial beltway transport
axis by connecting NLEx and SLEx. The project
will contribute to decongest Metro Manila traffic,
particularly EDSA and provide a 24-hour access
to Manila ports by providing faster, safer and
comfortable means of transport facility. It starts at
Caloocan City and ends at Makati City. It is an
elevated expressway over PNR right-of-way
Mode PPP Implementation Schedule Jan. 2012 – Dec. 2013
Project Cost PhP21,000 Million (US$ 477 Million)
Sponsoring Agency DPWH
Project Status
• Advertisement/Publication: Advertisement/Publication: June 2011
Contact Information
Name : Sec. Singson / Asec. Cabral / Dir. Firmalino / Asst. Dir. Garsuta
Designation : Secretary / Asec. for Planning / PMO BOT Director / PMO BOT Asst. Director
Agency : DPWH
Telephone no. : (63 2) 304-3300 / 304-3319 / 304-3762 / 304-3069
Fax No : (63 2) 304-3020 / 304-3033 / 304-3824 / 304-3069
Email Address : singson.rogelio@dpwh.gov.ph / cabral.ma_catalina@dpwh.gov.ph /
firmalino.bienvenida@dpwh.gov.ph / garsuta.rebecca@dpwh.gov.ph
top related