fis and oracle exadata · fis and oracle exadata fis maximum availability architecture 09/20/2016...

Post on 10-Jun-2020

33 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

FIS and Oracle ExadataFIS Maximum Availability Architecture

09/20/2016Manish Upadhyay ,Lead Oracle Machine Administrator

About Me• 4+ years with FIS • 8 years at hedge funds• 20+ years working with

Oracle technologies and databases

• Team lead of database appliance

• Oracle Certified Professional

• Supporting over 500 databases across a variety of platforms and applications

About FIS• Fortune 500 company

• World's largest global provider dedicated to banking and payments technologies

• 20,000 clients in over 130 countries

• Powering billions of transactions annually that move over $9 trillion around the globe

• 55,000 Employees / HQ Jacksonville, FL

Challenge• Long time and business

delay to stand up remote site to become active on failover- Start database- Re-map storage

volumes- Application reconnect

• Unreliable HA

• Delayed recovery with tape archive

• Reliance on backup team and concern over backup reliability

• SUN M5000 Server

• IBM XIV Storage

• SUN M5000 Server

• IBM XIV Storage

Primary Site

ACTIVE

Failover Site

PASSIVE

Symantec VCS Cluster

Migration –Oracle GoldenGate• “GoldenGate is your

friend”

• Powerful database replication technology

• Hardware independent; cross platforms Oracle or non-Oracle

• Database agnostic

Success with Exadata

Primary Site

ACTIVE

Remote Site

ACTIVE

Exadata & MAA at FIS for most recent project

• No unplanned downtime

• Active Data Guard

• Ability to redirect application tier quickly

• Database protection

• DR to remote site to become active on failover in real-time

Exadata 1 Exadata 2 Exadata 1 Exadata 2

ZFS Appliance-backup ZFS Appliance-backup

Active Data Guard

top related