Drainage Renewal – 19 Brook Rd, Glenbrook

AWP – 2011/12 (completed on June 2012)

Project Cost: $ 114,250

Pipeline: - 525mm – 66.5 lin meters

Pit: - 4

Headwall: - 1

Detention Basin with Grated inlet pit: - 1

Kerb & Gutter: - 57 lin meters

Driveway restoration: - 3

Turf restoration: - 70m2

Pavement restoration: - 40m2