System Operation Logging at Great River Energy
Facts
• G&T cooperative
• 2,800 MW of generation
• 4600 miles of transmission
• > 100 substations
• 182,000 assets tracked in Maximo
Service Territory
Great River Energy
Transmission
• Operator logging
• Clearances
• Events & outages
• Overtime call-outs
Generation
• Operator logging
• Generation outages / derates / tests
• Shift-change checklists
Process Areas
Where We Were…
• Disconnected logging
• No ties to Maximo
• Unfinished functionality
• Expensive solution
• Use Maximo (HSE) and EAM
• Prototype functionality / agile approach
• Cloned applications
• Cognos reports
Decision & Approach
Solution should support use of a single screen for logging and all related functions
Guiding Principle
Transmission Event Logging
Line Outages
Substation Outages
Relay Operations
Indented Log Entries / RTN
Call-outs
General Log Entries
Logging Clearances
Generation Logging
Generation Shift Checklists
Transmission REPORT
• Clearances application• Generation application• Events • Outages• Supporting screens
–Log units & sites–Circuits–Shift checklists
Other screens
• Work with Interloc to streamline scripts – may result in Java classes
• Formalized testing
• Go-live by end of year
Next Steps
• Having an incomplete current state solution is a challenge
• Disconnect between leadership vision and “in-the-trenches” reality
• Uncertainty of regulatory changes
• Giving users what they (think they) want
Lessons Learned
Questions
?