Grid activities in the Czech Republic
Jiří Kosina, Miloš Lokajíček, Jan Švec
Institute of Physics of the Academy
of Sciences of the Czech Republic
http://www.fzu.cz/
HEP Experiments in the Czech Republic (1)
● D0, STAR, ATLAS and ALICE (main experiments only) computing activities:– detector simulations, reconstruction– data analysis in running projects - main participants are
● Institutions – Institute of Physics AS CR, Institute of Nuclear Physics
AS CR – Charles University in Prague – Czech Technical University in Prague
● Facilities – EDG test-bed now being converted to LCG
Institutions involved in the Grid activities
● CESNET (http://www.cesnet.cz/)● Charles University in Prague (http://www.cuni.cz/)
● Czech Technical University in Prague (http://www.cvut.cz/)
● Institute of Physics AS CR (http://www.fzu.cz/)
CESNET(1)
CESNET z.s.p.o.
● association of legal entities created by Czech universities and Academy of Sciences of the CR
● Czech scientific network provider
– shareholder of the Dante
– member of TERENA
– Internet2 international partner
● Computing and networking strategic research projects
– Optical networks and their development
– IPv6 implementation in the CESNET2 network
– Multimedia transfers
– MetaCenter
– Voice services in the CESNET2 network
– QoS in high-speed networks
CESNET(2)
● International projects– GEANT – DataGrid -> EGEE– SCAMPI – 6NET
● Other projects– Infrastructure and technology for on-line education ,
Distributed contact center , Smart NetFlow analyser , Storage over IP , Presentation , RT system in CESNET, Securing CESNET2 local networks , Time synchronization and NTP servers, Platforms for video transmission and production, MEDIMED
CESNET(3)
● 1.2Gbps connection to GEANT (over HW 10 Gbps)● 1+1Gbps connection to NIX (Peering with Czech
ISPs)● 800Mbps connection to USA (Telia)● 2.5 Gbps CzechLight connection (now used for
other tests)– Reserved optical connection 1 Gbps
Institute of Physics <-> CERN – Connected to our linux router, switching to “backup” line
through Internet managed by BGP protocol– Possibility to connect to StarLight in the future
CESNET(4)
● European DataGrid project – WP1 workload management – WP7 network monitoring– Certification authority established for EDG
● issuing certificates to Czech academic subjects
Institute of Physics AS CR - FZU
● D0 experiment participation● ATLAS – main contribution to the hadronic
calorimeter TILECAL and Inner Detector (pixel sensors production and test of strip and pixel detectors), power supplies design and production
● Computing – Mass simulation for D0, reconstruction, data
analysis– ATLAS – participation to Data Challenges,
Atlas-LCG
Institute of Physics AS CR – FZU (2)
● Computing projects– EDG from 1 Jan 2001
● WP6 – testbed● CESNET network support important● Plan to continue in EGEE
– LCG – GDB (LHC Computing Grid – Grid Deployment Board)
● LCG deployed in October 2003 – CERN press release
Institute of Physics AS CR – FZU (3)
● Dedicated server farm for HEP and Grid computing – 34x dual 1.13Ghz PIII,
1TB disk array, currently experimenting with new 10 TB disk array
Institute of Physics AS CR – FZU (4)
● Current status– Construction of the new computing room in the institute
● Designed for 150 kW electric power● UPS, cooling, engine-generator● Construction finished by end 2003 with 50% capacity● Full capacity next year
● Application for triple capacity upgrade of the current farm (30 double Xeon units, 20 TB disk space) for the 2004. Hope in positive result.
Job Management●PBS Pro 5.2●LCG1 -> OpenPBS (will merge soon with PBS Pro)●queues
– shortq – normalq– longq
– d0
– atlas
– alice
– hightest
golias:~$ qsub -q atlas run.sh
D0 MC simulations● SAM station
Sequential Access to data via Metadata
● UPS, UPD management of software products on local systems (UPS) downloading products from product distribution servers (UPD)
● D0-RunII software rel. p14.02.00, p14.05.01
EDG, LCG
● We have installed LCG1 software and currently running LCG1-1_1_1 version of the software.
● LCG – middleware software to provide environment for distributed computing for LHC
● Member of WP6 work package – farm is running EDG 1.4 software, for testbed purposes
LCG (1)
● LCG – LHC (Large Hadron Collider) Computing Grid
● The accelerator will start operation in 2007● 12-14 PetaBytes of data will be generated
every year (20 milion Cds). It is assumed that analyzing this will require approximately 70.000 CPUs
LCG(2)
● Based on EDG software – project funded by EU, finishing by the end of this year
● GRID infrastructure allows every member to submit his job (along with JDL file) to the GRID, and after the computing is finished (no matter where), get the output
● In JDL you can specify requirements specific for task (SW versions, # CPUs, etc)
● Distributed storage of data.
LCG(3)
● Installation of LCG software is done through LCFGng toolkit – useful to manage wide variety of configurations for different hosts
● Joining sites are provided with pregenerated skeleton of configuration files in order to simplify installation procedure (it's necessary to modify them)
● Installation is done simply by enabling PXE boot and rebooting the nodes
10TB disk array and Linux
● We have 10 TB disk array. Problem with Linux 2.4 – only 2TB block devices supported
● Patch for LBD exists for 2.4 kernel, but it collides with another patch needed for LVM.
10TB disk array and Linux
● Kernel 2.6 (not yet stable) supports both LBD and device mapper (needed for LVM). After some hacking of NFS code (our patches are incorporated in 2.6.0-test9 kernel) we have successfully created 6 TB partition (XFS, ext2)
Institutions involved – contacts
● Jan Svec <svecj@fzu.cz> - network and system management, D0 experiment (grid)
● Jiri Kosina <kosina@fzu.cz> - installation of grid software at FZU, ALICE experiment, network and system management
● Jiri Chudoba <Jiri.Chudoba@cern.ch> - ATLAS experiment
● <pcclust@cesnet.cz> - CESNET's PC clusters
Summary – Grid infrastructure
● Basic Grid infrastructure has been established during last year and further expansion due to research or commercial needs in future shouldn't be problematic
● CESNET provides good international network connectivity, plan tests of CzechLight optical network
● Preparing for Data Challenges of LHC experiments in 2004