gw-100 carousel glasswasher quick setup instructions
Post on 18-Apr-2022
3 Views
Preview:
TRANSCRIPT
PRIMEDETERGENTCONCENTRATION
PRIMESANITIZERCONCENTRATION
PRIMERINSECONCENTRATION
FLUSHOFFON
11-2017
GW-100 CarouselGlasswasher Quick Setup Instructions
1STEP
Connect the drain hose to the FLOOR DRAIN. If floor drain is not available connect to the wall. Floor drain must have a (1 inch) air gap between the drain hose and the floor drain.
Adjust heater thermostat to 140F.
Connect water lines (hot 140F/160F) and (cold 75F) to water solenoid valves.
Flip power "on-off/flush" switch to "ON" position.Wash tank will automatically fill.
Connect L1 and L2 leads to the power block and ground wire to ground lug.
4STEP PRIME
RINSECONCENTRATION
FLUSHOFFON
Level dishmachine by adjusting leveling legs. Dishmachine must be level front and back to ensure proper performance.
GROUNDL2 (N)L1
HOT WATERINLET 2
COLD WATERINLET 2
2STEP
5STEP
6STEP
140
3STEP
FLOOR DRAIN
1"AIR GAP
WALLDRAIN
WARNING: Electrical and plumbing connections need to be made by a licensed service person and comply with all Federal, State and Local Health, Electrical, Plumbing and Safety codes.
HEATER THERMOSTAT
POWER BLOCK1
POWER SWITCH5
6THERMOMETER
DRAIN CONNECTION3
LEVELING LEGS4
6
PN: 1013039
PRIMEDETERGENTCONCENTRATION
PRIMESANITIZERCONCENTRATION
PRIMERINSECONCENTRATION
FLUSHOFF
ON
PRIMEDETERGENTCONCENTRATION
PRIMESANITIZERCONCENTRATION
PRIMERINSECONCENTRATION
FLUSHOFFON
11-2017
10STEP
Start conveyor by flipping rocker switch to "ON" position.
Insert tube stiffener with chemical tubing into corresponding chemical dispensers.
8STEP
BLUE RED WHITE
Push each of the chemical prime buttons and hold until the chemical feed tubes are full.
PRIMEDETERGENTCONCENTRATION
PRIMESANITIZERCONCENTRATION
PRIMERINSECONCENTRATION
9STEP
WARNING: Electrical and plumbing connections need to be made by a licensed service person and comply with all Federal, State and Local Health, Electrical, Plumbing and Safety codes.
GW-100 CarouselGlasswasher Quick Setup Instructions
AUTO FILL TIMER7OVERFLOW DRAIN TUBE
PRIMER PUSH BUTTONS9
ROCKER SWITCH 10
CHEMICAL STORAGE AREA
8TUBESTIFFENER
CHEMICALTUBING 8
Adjust auto-fill timer to 10 seconds to set water level.
7STEP
6 5 4
10
1
932
8
7
INPUT
INIT.
MAX MIN
LOAD
321
72
The Spirit of Excellence
an Ali Group Company
an Ali Group Company
PN: 10130.39
top related