hamelin pool stromatolites conservation and management · 2018-06-12 · hamelin science engagement...

Post on 10-Aug-2020

15 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Hamelin Pool Stromatolites Conservation and Management

Adapting to ecosystem change in the Shark Bay World Heritage Site – June 6, 2018

Erica P. Suosaari

Conserving our heritage by learning, protecting and inspiring

Long-termmonitoring

Long-termmonitoring• Discrete measurements

• pH • Alkalinity • TDS • Trace elements • Stable Isotopes • Saturation state modeling • Rare Earth elements • 87Sr / 86Sr

Long-termmonitoring• Microbial Mat monitoring

• High-resolution drone imagery transects

• Microscopy • Molecular • Geochemistry

Reid et al. 2017

Long-termmonitoring

GapsinKnowledge• What are the short and long-term patterns of temperature, salinity and

water level in Hamelin Pool? • Can the ground water source be determined? • What additional information is needed to understand the hydrology of the

area? • Does water chemistry influence carbonate precipitation leading to

syndepositional lithification in Hamelin Pool microbial mats? • What is the totality of the microbes, genomes and environmental

interactions of the stromatolite ecosystem in Hamelin Pool? • Can we delineate gene activities within these communities and link them

to mineral products and stromatolite formation?

GapsinKnowledge•  Is carbonate precipitation in microbial mats seasonal/episodic, and can it

be linked to observed environmental parameters or microbial activity? • Which microbial communities are responsible for making unique and

distinctive cements? • Are there changes in the benthic cover of habitat forming organisms

such as macroalgae and seagrass? •  If there are temporal changes, what is the rate of change and what are

the drivers? • What environmental parameters are changing within Hamelin Pool and

at what rate? • How are/will changing parameters affect the stromatolites, seagrasses

and faunal assemblage in Hamelin Pool?

GapsinKnowledge&Threats

GapsinKnowledge&Threats

Climate Change Related Threats - Ocean Acidification

Pmel.noaa.gov

SCALE @ A3 

PROJECT NO.

REVISION 

DATE

DRAWING NO.

DRAWING

DRAWN

1.  THIS DRAWING IS COPYRIGHT PROTECTED AND REMAINS THE PROPERTY OF OPENHOUSE DESIGN (ABN 74 148 215 070) ANDSHALL NOT BE USED FOR ANY OTHER PURPOSE THAN ORIGINALLY INTENDED.

2.  READ FIGURED DIMENSIONS IN PREFERENCE TO SCALE ALL DIMENSIONS IN mm U.O.N.3.  BUILDER TO CHECK AND CONFIRM ALL MEASUREMENTS, LEVELS & DETAILS PRIOR TO THE COMMENCEMENT OF ANY WORK 

OR FINANCIAL COMMITMENT.  BUILDER TO CHECK AND CONFIRM MEASUREMENTS OF EXISTING BUILDING.4.  THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL BUILDING DESIGN DRAWINGS, ARCHITECTURAL NATSPEC 

SPECIFICATION, ALL CONSULTANTS DRAWINGS AND SPECIFICATIONS & MANUFACTURERS SPECIFICATION.    5.  ALL WORKMANSHIP AND MATERIALS TO BE IN ACCORDANCE WITH THE MOST CURRENT BUILDING REGULATIONS, S.A.A. 

CODES AND AUSTRALIA STANDARDS.6.  CONCEPTS SHOWN ARE SUBJECT TO RELEVANT AUTHORITY APPROVALS.7.  FURNITURE, FIXTURE & LANDSCAPING FOR ILLUSTRATIVE PURPOSES ONLY.8.  3D IMAGES FOR ILLUSTRATIVE PURPOSES ONLY.

DRAWN FOR:

CLIENT:

PROJECT:

ADDRESS:

A

23‐Oct‐17 4:54:20 PM

8‐0029

SK313D VIEW

SKETCH DESIGN

WH

ECO STRUCTURES AUSTRALIA

BUSH HERITAGE AUSTRALIA

HAMELIN SCIENCE ENGAGEMENT CENTRE

HAMELIN STATION SHARK BAY ROAD HAMELINPOOL WA 6532

REVISION SCHEDULEREV. DATE DESCRIPTIONA 23.10.17 LAYOUT REVISED

LAKE LOOKING TO ALFRESCO

OUTDOOR INTERACTIVE SPACE

SCALE @ A3 

PROJECT NO.

REVISION 

DATE

DRAWING NO.

DRAWING

DRAWN

1.  THIS DRAWING IS COPYRIGHT PROTECTED AND REMAINS THE PROPERTY OF OPENHOUSE DESIGN (ABN 74 148 215 070) ANDSHALL NOT BE USED FOR ANY OTHER PURPOSE THAN ORIGINALLY INTENDED.

2.  READ FIGURED DIMENSIONS IN PREFERENCE TO SCALE ALL DIMENSIONS IN mm U.O.N.3.  BUILDER TO CHECK AND CONFIRM ALL MEASUREMENTS, LEVELS & DETAILS PRIOR TO THE COMMENCEMENT OF ANY WORK 

OR FINANCIAL COMMITMENT.  BUILDER TO CHECK AND CONFIRM MEASUREMENTS OF EXISTING BUILDING.4.  THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL BUILDING DESIGN DRAWINGS, ARCHITECTURAL NATSPEC 

SPECIFICATION, ALL CONSULTANTS DRAWINGS AND SPECIFICATIONS & MANUFACTURERS SPECIFICATION.    5.  ALL WORKMANSHIP AND MATERIALS TO BE IN ACCORDANCE WITH THE MOST CURRENT BUILDING REGULATIONS, S.A.A. 

CODES AND AUSTRALIA STANDARDS.6.  CONCEPTS SHOWN ARE SUBJECT TO RELEVANT AUTHORITY APPROVALS.7.  FURNITURE, FIXTURE & LANDSCAPING FOR ILLUSTRATIVE PURPOSES ONLY.8.  3D IMAGES FOR ILLUSTRATIVE PURPOSES ONLY.

DRAWN FOR:

CLIENT:

PROJECT:

ADDRESS:

DESIGN APPROVALWE AUTHORISE OPENHOUSE TO PROGRESS WITH WORKING DRAWINGS.

OWNER.............................................

SIGNATURE.......................................

DATE.................................................

B

23‐Oct‐17 4:54:57 PM

8‐0029

SK20ELEVATIONS

SKETCH DESIGN

WH

ECO STRUCTURES AUSTRLIA

BUSH HERITAGE AUSTRALIA

HAMELIN SCIENCE ENGAGEMENT CENTRE

HAMELIN STATION SHARK BAY ROAD HAMELINPOOL WA 6532

0

SCALE 1: AT ORIGINAL SIZE

2500 5000 7500 mm

250

SK10 1 : 2502 ELEVATION 2

SK10 1 : 2501 ELEVATION 1

SK10 1 : 2504 ELEVATION 4

SK10 1 : 2503 ELEVATION 3

REVISION SCHEDULEREV. DATE DESCRIPTIONA 22.05.17 FOR REVIEWB 23.10.17 LAYOUT REVISED

SCALE @ A3 

PROJECT NO.

REVISION 

DATE

DRAWING NO.

DRAWING

DRAWN

1.  THIS DRAWING IS COPYRIGHT PROTECTED AND REMAINS THE PROPERTY OF OPENHOUSE DESIGN (ABN 74 148 215 070) ANDSHALL NOT BE USED FOR ANY OTHER PURPOSE THAN ORIGINALLY INTENDED.

2.  READ FIGURED DIMENSIONS IN PREFERENCE TO SCALE ALL DIMENSIONS IN mm U.O.N.3.  BUILDER TO CHECK AND CONFIRM ALL MEASUREMENTS, LEVELS & DETAILS PRIOR TO THE COMMENCEMENT OF ANY WORK 

OR FINANCIAL COMMITMENT.  BUILDER TO CHECK AND CONFIRM MEASUREMENTS OF EXISTING BUILDING.4.  THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL BUILDING DESIGN DRAWINGS, ARCHITECTURAL NATSPEC 

SPECIFICATION, ALL CONSULTANTS DRAWINGS AND SPECIFICATIONS & MANUFACTURERS SPECIFICATION.    5.  ALL WORKMANSHIP AND MATERIALS TO BE IN ACCORDANCE WITH THE MOST CURRENT BUILDING REGULATIONS, S.A.A. 

CODES AND AUSTRALIA STANDARDS.6.  CONCEPTS SHOWN ARE SUBJECT TO RELEVANT AUTHORITY APPROVALS.7.  FURNITURE, FIXTURE & LANDSCAPING FOR ILLUSTRATIVE PURPOSES ONLY.8.  3D IMAGES FOR ILLUSTRATIVE PURPOSES ONLY.

DRAWN FOR:

CLIENT:

PROJECT:

ADDRESS:

DESIGN APPROVALWE AUTHORISE OPENHOUSE TO PROGRESS WITH WORKING DRAWINGS.

OWNER.............................................

SIGNATURE.......................................

DATE.................................................

B

23‐Oct‐17 4:54:57 PM

8‐0029

SK20ELEVATIONS

SKETCH DESIGN

WH

ECO STRUCTURES AUSTRLIA

BUSH HERITAGE AUSTRALIA

HAMELIN SCIENCE ENGAGEMENT CENTRE

HAMELIN STATION SHARK BAY ROAD HAMELINPOOL WA 6532

0

SCALE 1: AT ORIGINAL SIZE

2500 5000 7500 mm

250

SK10 1 : 2502 ELEVATION 2

SK10 1 : 2501 ELEVATION 1

SK10 1 : 2504 ELEVATION 4

SK10 1 : 2503 ELEVATION 3

REVISION SCHEDULEREV. DATE DESCRIPTIONA 22.05.17 FOR REVIEWB 23.10.17 LAYOUT REVISED

World class research into our natural & cultural

heritage

Objec;ves•  Tryingtofillgapsinknowledgethroughresearchandmonitoring

•  Establishinglong-termmonitoring– allowsdetec:onofissuesandchanges– comparisonstootherareas

•  Collectedinforma:oncanfeedintofutureplanning

“Thewholeisgreaterthanthesumofitsparts.”

-Aristotle

top related