High Performance Teaming. Presenters: Bob Betz Senior Vice President – McCarthy Building Companies, Inc. Dan Fauchier, CMF Senior Lean Coach – The ReAlignment Group. ü. YES. NO. ü. YES. NO. Commonly Asked Questions. Will I be able to get copies of the slides after the event? . - PowerPoint PPT Presentation

TRANSCRIPT

OUR GOAL IS TO BE THE BEST BUILDER IN AMERICA.

High Performance TeamingPresenters:Bob BetzSenior Vice President – McCarthy Building Companies, Inc.

Dan Fauchier, CMFSenior Lean Coach – The ReAlignment Group

Commonly Asked Questions

1. Will I be able to get copies of the slides after the event?

2. Is this web seminar being recorded so I or others can view it after the fact?

NOYESü

NOYESü

Have A Question?

How to submit questions to the Speaker during this Web Cast

Click on your Pop-Down Tool Bar

4

Agenda• Introductions• What is High Performance Teaming?• UCSD Biomedical Research Facility II

– Why and How?• Results • Metrics• Takeaways• Final Assessment• Q&A

WHAT IS HIGH PERFORMANCE TEAMING?

High Performance Teaming

5

6

What is High Performance Teaming?• Moving from vertical silos

• To Horizontal Teams– Executive– Manager– Field

Level 1 Thinking - Personal/Professional

Level 2 Thinking - Business/Organizational

Contracts

Owner Contractor

Designer

Fort Mentality

Level 3 Thinking - Project First Thinking

3rd Level Focus

Always Asking First: “What’s Best

for the Project?”

HPT allows teams to…• Focus on tasks at hand• Forecast risks• Forecast opportunities• Manage systems• Encourage professionalism• Encourage collaboration• Quickly resolve inevitable conflicts

11

What is High Performance Teaming?

• Quickly resolve inevitable conflicts

SimplifySimplifySimplify

Resolve issues at the lowest level

Elevate unresolved issues quickly through a simple 3-tier process

OLD WAY

NEW WAY

12

High Performance TeamingFi

eld

Team

can

not

Reso

lve

13

The 5 Big IdeasCollaborate;

Really Collaborate

Networks ofCommitment

Tightly CoupleLearning w/ Action

OptimizeThe Whole

IncreaseRelatedness

Courtesy LCI

UCSD BIOMEDICAL RESEARCH FACILITY II

High Performance Teaming

14

15

UCSD Biomedical Research Facility II• 200K sf, 5-story Research Laboratory + 7-story Office wing,

LEED Platinum, completed 2013• Owner: UCSD• Builder: McCarthy Building Companies, Inc.• Designer: ZGF Architects• Facilitator: The ReAlignment Group• Procurement: CM/GC; Select Bid - Fee/GC’s

16

UCSD Biomedical Research Facility II• Incorporated techniques and strategies from:

– Integrated Project Delivery– Design-Build– Design Assist

• Promoted a collaborative delivery model− Facilitated a seamless transition from Preconstruction to

Construction• Lean Construction theory

– Informed the processes– New, more collaborative and reliable partnering model– Utilized pull planning for collaborative scheduling

17

Pull Planning the MEPs

QUARTERLY PRE-SESSIONONLINE SURVEYS

High Performance Teaming

18

19

Pre-Session Surveys

20

Pre-Session Surveys

QUARTERLY HPT SESSIONS(FACILITATED)

High Performance Teaming

21

22

Session Agenda• Introductions + What surprised you most in the

last 90 days?• What’s Working? What’s Not Working?

– In vertical silo teams– From survey, plus live discussion – pick top 3 & report

• Identify Risks and Opportunities– In horizontal teams: Executive, Manager, Field

• Top 4 Risks, Mitigation Strategies & Action Items• Trust Assessment• Plus / Delta• Takeaways

23

Start as Whole Group, then break out into Silo Teams

What’s Working? What’s NOT Working?

24

Then flip to Horizontal Teams

• Executive– Across all the Silos– UCSD– McCarthy– ZGF– Major Trades

25

Horizontal Teams: Risks & Opps

• Manager– Across all the Silos– UCSD– McCarthy– ZGF– All Trades– Inspectors

26

Horizontal Teams: Top 4 Risks

• Field Team– Across all the Silos– UCSD– McCarthy Sup’t– ZGF (on site)– All Trades

27

Break out into Issue Groups

28

“Live Notes” become Report

29

Goals Progress

30

Risks & Opportunities

31

Top 4 Risks/Issues & Action Items

32

Plus / Delta

33

Takeaways

RESULTSHigh Performance Teaming

34

35

Results• 6 Quarterly Meetings of 50, then 40, then 30• Individual horizontal team meetings throughout

– Removed one problem individual – mutual agreement• High Performance Teaming benefits all

stakeholders:– Owner’s management team– Facilities personnel– End users– Architect– Contractor– Consultants– Trade subcontractors

METRICSHigh Performance Teaming

36

37

Trust Assessment

8.19

Team Members’ Trust Levels

5/1/11

6/1/11

7/1/11

8/1/11

9/1/11

10/1/

11

11/1/

11

12/1/

11

1/1/12

2/1/12

3/1/12

4/1/12

5/1/12

6/1/12

0

1

2

3

4

5

6

7

8

9

Series1

Steady in the 8’s

5 6 7 8 9 1001020304050

Team Members’ Trust Levels

TAKEAWAYSHigh Performance Teaming

40

41

Takeaways• Finished on time, on budget, Platinum quality• Open communication throughout the entire

project between all levels of the Team• Pull planning was an excellent compliment to the

to HPT process – Facilitated field collaboration• Change resolution uneventful• All issues resolved at the Management/Field Level

of the project• Goal setting by each HPT Group raised the bar on

performance for the project

FINAL ASSESSMENTHigh Performance Teaming

42

43

Final Assessment• Using High Performance Teaming

– Owner realizes quantitative results • Performance enhancements• Delivery of high quality• Meet a fast-track schedule• Collaborative budget control – target value budgeting• Maintain safe jobsite• Foster camaraderie amongst all team members

• Drives all project participants to “Project First” thinking– Streamlining team focus on– What’s ultimately best for the project.

Questions and answers

Have A Question?

How to submit questions to the Speaker during this Web Cast

Click on your Pop-Down Tool Bar

46

Following Today’s Web Cast

Watch your inbox for directions on where to go for downloading today’s presentation and recording.

To contact:Bob Betz

rbetz@mccarthy.comDan Fauchier

dan@projectrealign.com

OUR GOAL IS TO BE THE BEST BUILDER IN AMERICA.

High Performance TeamingPresenters:Bob BetzSenior Vice President – McCarthy Building Companies, Inc.

Dan Fauchier, CMFSenior Lean Coach – The ReAlignment Group

top related