holasek business park...perkins cub foods burger king subway u.s. bank cvs taco bell perkins cub...
Post on 27-Jul-2020
1 Views
Preview:
TRANSCRIPT
HOLASEK BUSINESS PARK8610 GALPIN BLVD, CHANHASSEN, MN 55317
AVAILABLE FOR OCCUPANCY JANUARY 2020
Paisley Park Target
Houlihan’sTotal Wine
Target
McDonald’s
ChanhassenHigh School
Culver’s
McDonald’sKohl’sCaribou
Cub FoodsPerkins
Burger King
Subway
U.S. BankCVS
Taco BellPerkins
Cub FoodsBuffalo
Wild Wings
Jimmy John’s
Life Time Athletic
Chaska Par 30
Minnesota LandscapeArboretum
Bluff Creek Golf Course
Hazeltine National Golf Club
CHANHASSEN
SHAKOPEE
JONATHAN
HAZELTINE
Pioneer Trl
GG61
GG69
GG61 GG101
41
61
101
101
Stoughton Ave
dR nobuduA
McK
nigh
t Rd
Bluff Creek Dr
W 78th St
Pow
ers
Blv
d
Hundertmark Rd
Bav
aria
Rd
S
Village R
d
Cre
st D
r
Parallel S
tCrosstown Blvd
Apgar S
t S
Ravou
x Rd
Kelly Rd
Falls Curv
Alkire Dr
Lyman Blvd
Lyman Blvd
Canyo
n Rd
Wat
ers E
dge
Dr
Creekwood St
Bluff Pass S
Weston Ridge Pkwy
Judi
th D
r
Old
Aud
ubon
Rd
Purple Brick Rd
Lake Hazeltine
Lake Susan
£¤212
BUILDING B 24’ Clear
BUILDING A 28’ Clear
SITE PLAN
HOLASEK BUSINESS
PARK
Paisley Park Target
Houlihan’sTotal Wine
Target
McDonald’s
ChanhassenHigh School
Culver’s
McDonald’sKohl’sCaribou
Cub FoodsPerkins
Burger King
Subway
U.S. BankCVS
Taco BellPerkins
Cub FoodsBuffalo
Wild Wings
Jimmy John’s
Life Time Athletic
Chaska Par 30
Minnesota LandscapeArboretum
Bluff Creek Golf Course
Hazeltine National Golf Club
CHANHASSEN
SHAKOPEE
JONATHAN
HAZELTINE
Pioneer Trl
GG61
GG69
GG61 GG101
41
61
101
101
Stoughton Ave
dR nobuduA
McK
nigh
t Rd
Bluff Creek Dr
W 78th St
Pow
ers
Blv
d
Hundertmark Rd
Bav
aria
Rd
S
Village R
d
Cre
st D
r
Parallel S
tCrosstown Blvd
Apgar S
t S
Ravou
x Rd
Kelly Rd
Falls Curv
Alkire Dr
Lyman Blvd
Lyman Blvd
Canyo
n Rd
Wat
ers E
dge
Dr
Creekwood St
Bluff Pass S
Weston Ridge Pkwy
Judi
th D
r
Old
Aud
ubon
Rd
Purple Brick Rd
Lake Hazeltine
Lake Susan
£¤212
BUILDING A FEATURES
Total Square Feet 255,650 SF (Fully Leased)
Year Built 2019
Clear Height 28’
Lease Rates $5.50 PSF + Amortization
Estimated Tax & CAM
2020 - $1.64 PSF 2021 - $3.05 PSF 2022 - $3.65 PSF
Loading 30 docks, 4 drive-ins
Column Spacing 40’ x 50’ with 50’ speed bay
Building Depth 250’
• Under Construction Now
• 24’ - 28’ ft clear
PROPERTY HIGHLIGHTS
BUILDING B FEATURES
Total Square Feet 140,960 SF
Availability 87,570 SF (Divisible 20,000 SF)
Clear Height 24’
Lease Rates $5.50 PSF + Amortization
Estimated Tax & CAM
2020 - $1.64 PSF 2021 - $3.05 PSF 2022 - $3.65 PSF
Loading Dock and drive-in loading
Column Spacing 48’ x 54’ with 54’ speed bay
Building Depth 198’
BUILDING A PLAN
BUILDING B PLAN
• 20,000-87,570 SF available
• Dock and Drive-In Loading
UPUP UP
UP
UP
UP
DN
DN
UP
--
A5.31
--
A5.32
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
A
B
C
D
E
MA
TCH
LIN
EM
ATC
H L
INE
A5.21
A5.22
A5.23
A5.24
A5.11
A5.12
950' - 0"
43' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 43' - 0"
50' -
0"
40' -
0"
40' -
0"
40' -
0"
40' -
0"
40' -
0"
F
G
17,986 sfMEZZANINE ABOVE
172,599 sfRETAIL TECH
A5.13
A5.14
16.5 17.5 18.6
--
A5.31
--
A5.32
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
A
B
C
D
E
A5.21
A5.22
A5.23
A5.24
A5.11
A5.12
F
G
A5.13
A5.14
16.5 17.5 18.6
A6.41
A6.47
16' - 3"
5' - 6"
18' - 6"
5' - 6"
16' - 6"
5' - 6"
18' - 6"
5' - 6"
----
OPEN TOBELOW
Sheet Title
Project Number Sheet Number
Issued For Date
Location
Project
Client
Project ManagerDate Reg. No.
I hereby certified that this plan,specification or report was prepared byme or under my direct supervision andthat I am a duly Licensed Architectunder the laws of the State ofMinnesota
Edward A. Farr
©COPYRIGHT 2019
C:\U
sers
\NSL
\Doc
umen
ts\1
8067
HBP
BLD
G A
_NSL
.rvt
2/22
/201
9 5:
37:3
5 PM
A2.018.067
BUILDING A OVERALLFLOOR PLAN
Holasek Business Park
8610 Galpin Blvd.Chanhassan, MN
EDEN TRACECORPORATION
November2, 2018
16362
DLA
SCALE: 1" = 30'-0"A2.01 BUILDING A OVERALL FLOOR PLAN
0' 30 60
N
SCALE: 1" = 30'-0"A2.02 BUILDING A OVERALL CLERESTORY PLAN
0' 30 60
N
PROGRESS 02/22/2019
FULLY LEASED
9x18
N
N
N
N
N
N
N
N
9x18
NNNNNNNNNNNNNNN
9x18
N
N
N
9x18
NNNNNNNNNNNNNNN
9x18
N
9x18
NNNNNNNNNN
9x18
NNNNNNNNNNNNNNN
9x18
NNNN
9x18
NNNNNN
9x18
N
N
N
N
N
N
N
N
N
N
N
N
9x18
N
N
N
N
N
N
N 9x18
N
N
N
N
N
N
N
9x18
NNN
1 2 3 4 5 6 7 8 9 10 11 12 13 1454' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0"
15
A
B
C
D
E
48' -
0"
48' -
0"
48' -
0"
54' -
0"
36' - 0" 72' - 0"
18' -
0"
140,960 SF
EQ
EQ
756' - 0"
18' - 0" 31' - 3 3/4" 22' - 8 1/4"
10' -
0"
10' - 0"
23.0
0°
23.00°
198'
- 0"
A5.42
A5.41
A5.44
A5.43
A5.45
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A
B
C
D
E
A5.45
A5.41
A5.43
A5.44
A5.42--
A5.51
A5.52
--
A5.53
A5.54
A5.62
A5.61
A5.63
Sheet Title
Project Number Sheet Number
Issued For Date
Location
Project
Client
Project ManagerDate Reg. No.
I hereby certified that this plan,specification or report was prepared byme or under my direct supervision andthat I am a duly Licensed Architectunder the laws of the State ofMinnesota
Edward A. Farr
©COPYRIGHT 2019
C:\U
sers
\NSL
\Doc
umen
ts\1
8067
HBP
BLD
G A
_NSL
.rvt
2/25
/201
9 9:
03:5
0 AM
A3.018.067
BUILDING B OVERALLFLOOR PLAN
Holasek Business Park
8610 Galpin Blvd.Chanhassan, MN
EDEN TRACECORPORATION
November2, 2018
16362
DLA
PROGRESS 02/22/2019
SCALE: 1" = 30'-0"A3.02 BUILDING B OVERALL FLOOR PLAN
0' 15' 30' 60'
N
SCALE: 1" = 30'-0"A3.01 BUILDING B OVERALL CLERESTORY PLAN
87,570 SF
• Many Area Amenities
• Available January 2020
LEASED
©2019 Cushman & Wakefield NO WARRANTY OR REPRESENTATION, EXPRESS OR IMPLIED, IS MADE TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION CONTAINED HEREIN, AND SAME IS SUBMITTED SUBJECT TO ERRORS, OMISSIONS, CHANGE OF PRICE, RENTAL OR OTHER CONDITIONS, WITHDRAWAL WITHOUT NOTICE, AND TO ANY SPECIAL LISTING CONDITIONS IMPOSED BY THE PROPERTY OWNER(S). AS APPLICABLE, WE MAKE NO REPRESENTATION AS TO THE CONDITION OF THE PROPERTY (OR PROPERTIES) IN QUESTION.
CONTACT US FOR LEASING OPPORTUNITIES
Kris SmeltzerExecutive Director+1 952 837 8575 kris.smeltzer@cushwake.com
Hudson BrothenDirector+1 952 893 8261 hudson.brothen@cushwake.com
Jason MeyerExecutive Director+1 952 820 8735 jason.j.meyer@cushwake.com
CONSTRUCTION PHOTOS AUGUST 2019
top related