i-43 north-south freeway corridor study brown deer road … · 2015. 1. 7. · brown deer road...

Post on 17-Feb-2021

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

  • I-43 North-South Freeway Corridor StudyProject ID: 1229-04-01 | Silver Spring Dr to WIS 60 | Milwaukee and Ozaukee Counties

    PORTWASHINGTONR

    OAD

    BR

    OW

    ND

    EE

    RR

    OA

    D

    IH43NB

    IH43

    NB

    DE

    AN

    RO

    AD

    PHEASANTLANE

    IH43SB

    HE

    AT

    HE

    RL

    AN

    E

    BR

    OW

    ND

    EE

    RR

    OA

    D

    PO

    RT

    WASHIN

    GTO

    NR

    OAD

    IH43

    SB

    PORTWASHINGTONR

    OAD

    BR

    OW

    ND

    EE

    RR

    OA

    D

    Brown Deer Road Interchange

    Diamond

    INTERCHANGE

    BROWN DEER RD INTERCHANGE

    MEQUON RD

    HIG

    HL

    AN

    DR

    D

    INTERCHANGE

    COUNTY C

    INTERCHANGE

    WIS 60

    04.01.14

    INTERCHANGE

    SILVER SPRING DR

    INTERCHANGE

    GOOD HOPE RD

    INTERCHANGE

    COUNTY LINE RD

    APRIL 30, 2014 & MAY 1, 2014PUBLIC HEARING DRAFT

    INDIAN HILL ELEMENTARY SCHOOL

    NEW WORLD MONTESSORI SCHOOL

    MAPLE DALE MIDDLE SCHOOL

    PARCEL LINE

    ENVIRONMENTAL CORRIDOR

    HISTORIC PROPERTY

    SCHOOL

    CEMETERY

    SCALE IN FEET

    0 50 100 200

    N

    / EXISTING BRIDGE

    PROPOSED BRIDGE

    FEASIBLE AND REASONABLE NOISE BARRIER

    100-YEAR FLOODPLAIN

    POTENTIAL RIGHT-OF-WAY

    WETLANDS / ADID WETLANDS

    POTENTIAL RELOCATION

    Residential Commercial

    (4(f) RESOURCE)

    PUBLIC RECREATION

    (SECTION 106 & 4(f) RESOURCE)

    HISTORIC BOUNDARY

    POND

    STORMWATER

    POTENTIAL

    POND

    STORMWATER

    POTENTIAL

    POND

    STORMWATER

    POTENTIAL

    POND

    STORMWATER

    POTENTIAL

    County Line Road Interchange

    Required with No Access at

    Intersection Configuration

top related