idm table form - buildingsmartiug.buildingsmart.org/idms/overview/idm table form 2012 10 09.pdf ·...

Post on 07-May-2018

263 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

IDM Registration form

Auto ID 1 ID used in the IDM

Name of the IDM

Controls Engineering

Owner

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Controls engineering deals with the overall process of planning, designing, installing,

commissioning, operating and maintaining HVAC controls and automation systems for

building projects.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Project Manager E-mail

Does the IDM include?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: nn@aec3.com

10 Disposal

Auto ID 2 ID used in the IDM

Name of the IDM

Cost Modelling

Owner

Description

Cost modelling is a process that attempts to bring design and price together. It has the

objective of controlling costs, not just to measure them. Cost modelling therefore is defined

to be the assessment and control of cost prior to the availability of kn

Project Manager

IDM Status Work in progess

URL http://idm.buildingsmart.no/confluence/display/IDM/Cost+Modelling

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Selvagg

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Project Manager E-mail

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

Comment

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 3 ID used in the IDM

Name of the IDM

Electrical Engineering

Owner

Project Manager

IDM Status Work in progess

URL http://idm.buildingsmart.no/confluence/display/IDM/Electrical+Engineeri

ng

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Electrical engineering deals with the overall process of planning, designing, installing,

commissioning, operating and maintaining electrical power systems for building projects. It

deals with low voltage electrical installations from 12V (AC/DC) to 1000V

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Project Manager E-mail

Does the IDM include?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Statsbygg

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 4 ID used in the IDM

Name of the IDM

Energy Analysis

Owner

Project Manager

IDM Status Work in progess

URL http://idm.buildingsmart.no/confluence/display/IDM/Energy+Analysis

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Energy analysis is concerned with predicting the use and cost of energy use and cost within

buildings. It takes into account as input data:

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Statsbygg

Project Manager E-mail

Does the IDM include?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 5 ID used in the IDM

Name of the IDM

Facilities Management

Owner

Project Manager

IDM Status Work in progess

URL http://idm.buildingsmart.no/confluence/display/IDM/Facilities+Managem

ent

IDM available in English

Description

Facilities Management comprises many processes. For present purposes, this document is

concerned with the maintenance aspect of facilities management and outlines the following

processes:-

Project Manager E-mail

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Statsbygg

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

10 Disposal

Comment

E-mail bS IDM Contact person: steen.sunesen@b

Auto ID 6 ID used in the IDM

Name of the IDM

HVAC Engineering

Owner

Project Manager

IDM Status Work in progess

URL http://idm.buildingsmart.no/confluence/display/IDM/HVAC+Engineering

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

HVAC engineering deals with the overall process of planning, designing, installing,

commissioning, operating and maintaining heating, ventilating and air conditioning (HVAC)

systems for building projects.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Statsbygg

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 7 ID used in the IDM

Name of the IDM

Piping Engineering

Owner

Project Manager

IDM Status Work in progess

URL http://idm.buildingsmart.no/confluence/display/IDM/Piping+Engineering

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

HVAC engineering deals with the overall process of planning, designing, installing,

commissioning, operating and maintaining heating, ventilating and air conditioning (HVAC)

systems for building projects.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Statsbygg

What is the Scope of the IDM?

Project Manager E-mail

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 8 ID used in the IDM

Name of the IDM

Structural Engineering

Owner

Project Manager

IDM Status Work in progess

URL http://idm.buildingsmart.no/confluence/display/IDM/Structural+Engineer

ing

IDM available in English

Please specify the languages the IDM is available in

Description

Structural Engineering deals with the overall process of planning, designing, installing,

commissioning, operating and maintaining structural engineering systems for building

projects.

Project Manager E-mail

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Statsbygg

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 10 ID used in the IDM

Name of the IDM

QTO_MEP Aquarium

Owner

Project Manager

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Statsbygg

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 11 ID used in the IDM GSA-005

Name of the IDM

Concept Design BIM 2010

Owner

Project Manager

Description

Composite MVD that includes all of the following. GSA 001, GSA 002, BSA002, BSA001

Project Manager E-mail

IDM Status Under review

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

US General Services Administration (GSA), Statsbygg, Senate

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Developed as a view

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 12 ID used in the IDM

Name of the IDM

IDM for BuildingProgramming

Owner

Project Manager

IDM Status Work in progess

URL http://tida.no/wiki/public:idm

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Statsbygg, Nosyko

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 13 ID used in the IDM

Name of the IDM

FM_handover

Owner

Project Manager

IDM Status Work in progess

URL http://buildingsmart-tech.org/specifications/ifc-view-definition/fm-

handover-aquarium

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Statsbygg,,,,,,

What is the Scope of the IDM?

Project Manager E-mail

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 14 ID used in the IDM

Name of the IDM

Nordic_energy

Owner

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Description

Project Manager E-mail

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Statsbygg, Senate Properties

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 15 ID used in the IDM

Name of the IDM

Georeferencing

Owner

Project Manager

IDM Status Draft

URL http://iug.buildingsmart.com/idms/information-delivery-manuals/idm-

for-geographical-referencing

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

The georeferencing IDM is limited to support the process of georeferencing a site and its

buildings during the design and planning phase in Norway

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

buildingSMART Norway

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 16 ID used in the IDM DK-GOV-Area

Name of the IDM

Area information from project to FM

Owner

The Palace and Properties Agency in Denmark

Project Manager

Stig Brinck

Description

Project Manager E-mail

sbr@niras.dk

IDM Status Draft

URL

IDM available in English

Please specify the languages the IDM is available in

Danish

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Dalux Byg (www.dalux.dk)

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM Public organisation

Who is the Initiator of the IDM?

The Palace and Properties Agency in Denmark

What is the Scope of the IDM?

Handover of space with properties to FM systems using IFC.

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: jan.karlshoej@gra

Auto ID 17 ID used in the IDM

Name of the IDM �IDM between architectural design and free-form structure in Super-tall Buildings

Owner

Project Manager

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Development Team of Open BIM Information Environment Technology for Super-tall

Buildings under Super-tall Buildings Research and Business Development Center

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: glee@yonsei.ac.kr

10 Disposal

Auto ID 18 ID used in the IDM

Name of the IDM

IDM of energy analysis simulation based on free-form shape

Owner

Project Manager

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Development Team of Open BIM Information Environment Technology for Super-tall

Buildings under Super-tall Buildings Research and Business Development Center

What is the Scope of the IDM?

Project Manager E-mail

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: glee@yonsei.ac.kr

10 Disposal

Auto ID 19 ID used in the IDM

Name of the IDM

IDM of architectural evacuation and vertical circulation

Owner

Project Manager

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Description

Project Manager E-mail

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Development Team of Open BIM Information Environment Technology for Super-tall

Buildings under Super-tall Buildings Research and Business Development Center

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: glee@yonsei.ac.kr

10 Disposal

Auto ID 25 ID used in the IDM GSA-002

Name of the IDM

Architectural Design to Circulation/Security Analysis

Owner

Project Manager

IDM Status Approved

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

GSA Public Services

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

001/002?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 26 ID used in the IDM CRC_CI-003

Name of the IDM

Architectural design to landscape design

Owner

Project Manager

Description

Project Manager E-mail

IDM Status Idea

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

CRC for construction innovation

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 27 ID used in the IDM VBL-004

Name of the IDM

Architectural design to quantity take-off - level 1

Owner

Jiri Hietanen

Project Manager

IDM Status Stopped

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

The basic idea behind this view is that architects (and other designers) provide design object

quantities (e.g. gross area of a wall), which can be used as ‘raw material’ for creating

production quantities.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Virtual Building Laboratory @ TUT

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 28 ID used in the IDM GSC-002

Name of the IDM

Architectural design to quantity take-off - level 2

Owner

Project Manager

IDM Status Stopped

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

IAI German Speaking Chapter

What is the Scope of the IDM?

Project Manager E-mail

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 29 ID used in the IDM VBL-006

Name of the IDM

Architectural design to quantity take-off - level 3

Owner

Project Manager

IDM Status Stopped

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Description

Project Manager E-mail

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Virtual Building Laboratory @ TUT

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 30 ID used in the IDM GSA-001

Name of the IDM

Architectural Design to Spatial Program Validation

Owner

Project Manager

IDM Status Proposal

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

US General Services Administration

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 31 ID used in the IDM VBL-002

Name of the IDM

Architectural design to structural design

Owner

Project Manager

Description

Project Manager E-mail

IDM Status Draft

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Virtual Building Laboratory @ TUT

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 32 ID used in the IDM VBL-007

Name of the IDM

Architectural design to thermal simulation

Owner

Project Manager

IDM Status Proposal

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Virtual Building Laboratory @ TUT

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 33 ID used in the IDM BSI-001

Name of the IDM

Architectural Programming to Architectural Design

Owner

Project Manager

IDM Status Draft

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

buildingSMART International

What is the Scope of the IDM?

Project Manager E-mail

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 34 ID used in the IDM GSC-001

Name of the IDM

Basic HandOver to Facility Management

Owner

Project Manager

IDM Status Draft

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Description

Project Manager E-mail

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

IAI German Speaking Chapter

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 35 ID used in the IDM ICC-001

Name of the IDM

Design to Code Compliance Checking (ICC 2006)

Owner

Project Manager

IDM Status Draft

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

International Code Council

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 36 ID used in the IDM BSA-002

Name of the IDM

Design to Energy Performance Analysis

Owner

Project Manager

Description

Project Manager E-mail

IDM Status Proposal

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

buildingSMART alliance North America

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 37 ID used in the IDM BSA-001

Name of the IDM

Design to Quantity Takeoff

Owner

Project Manager

IDM Status Proposal

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

buildingSMART alliance North America

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 38 ID used in the IDM ISG-001

Name of the IDM

Extended coordination view

Owner

Project Manager

IDM Status Idea

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

IAI Implementers Support Group

What is the Scope of the IDM?

Project Manager E-mail

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 39 ID used in the IDM VBL-003

Name of the IDM

Extensibility

Owner

Project Manager

IDM Status Idea

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Description

Project Manager E-mail

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Virtual Building Laboratory @ TUT

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 40 ID used in the IDM HUT_HVAC-001

Name of the IDM

Indoor climate simulation to HVAC design

Owner

Project Manager

IDM Status Proposal

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

HVAC-laboratory @ Helsinki University of Technology

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 41 ID used in the IDM CRC_CI-002

Name of the IDM

Landscape design to road design

Owner

Project Manager

Description

Project Manager E-mail

IDM Status Idea

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

CRC for construction innovation

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 42 ID used in the IDM PCI-001

Name of the IDM

Precast Concrete Exchanges

Owner

Precast Concrete InsKtute, Chuck Eastman

Project Manager

Chuck Eastman

IDM Status Draft

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

charles.eastman@coa.gatech.edu

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Precast Concrete Institute

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 43 ID used in the IDM CRC_CI-001

Name of the IDM

Road design to landscape design

Owner

CRC for construction innovation, Robin Drogemuller

Project Manager

IDM Status Idea

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

CRC for construction innovation

What is the Scope of the IDM?

Project Manager E-mail

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 44 ID used in the IDM HUT_HVAC-002

Name of the IDM

Space Requirements and Targets to Thermal Simulation

Owner

HVAC-laboratory at Helsinki University of Technology, Mika Vuolle

Project Manager

IDM Status Draft

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Description

Project Manager E-mail

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

HVAC-laboratory @ Helsinki University of Technology

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 45 ID used in the IDM VBL-001

Name of the IDM

Structural design to structural analysis

Owner

Virtual Building Laboratory at Tampere University of Technology, Sakari Lehtinen

Project Manager

IDM Status Proposal

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Virtual Building Laboratory @ TUT

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 46 ID used in the IDM ATC-001

Name of the IDM

Structural Design to Structural Detailing (ATC-75)

Owner

Applied Technology Council, Thomas Liebich

Project Manager

Thomas McLane

Description

Project Manager E-mail

tmclane@atcouncil.org

IDM Status Draft

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Applied Technology Council

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 47 ID used in the IDM IDMoER

Name of the IDM

Information Delivery Manual on Energy Retrofitting

Owner

Technical University of Denmark

Project Manager

Rune Andersen

IDM Status Approved

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

rune.j.a@hotmail.com

Does the IDM include?

Is the IDM supported by software?

Which software product?

ArchiCAD, WinDesign (developed at the Technical University of Denmark

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM Student project

Who is the Initiator of the IDM?

Technical University of Denmark

What is the Scope of the IDM?

IDM for energy retrofitting by the three specific applications; ArchiCAD, WinDesign, and

Visualizer.

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: jan.karlshoej@gra

10 Disposal

Auto ID 49 ID used in the IDM KO_MLTM_001_ARC

Name of the IDM

IDM between architectural design and architectural design activities

Owner

Ministry of Land, Transport, and Maritime Affairs (MLTM), South Korea

Project Manager

Ghang Lee, Yonsei University

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible Private

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM National

Who is the Initiator of the IDM?

What is the Scope of the IDM?

Project Manager E-mail

glee@yonsei.ac.kr

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: glee@yonsei.ac.kr

10 Disposal

Auto ID 50 ID used in the IDM KO_MLTM_002_COS

Name of the IDM

IDM between architectural design and cost-estimation activities

Owner

Ministry of Land, Transport, and Maritime Affairs (MLTM), South Korea

Project Manager

Ghang Lee, Yonsei University

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Description

Project Manager E-mail

glee@yonsei.ac.kr

Accessible Private

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM National

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: glee@yonsei.ac.kr

10 Disposal

Auto ID 51 ID used in the IDM KO_MLTM_003_SCH

Name of the IDM

IDM between architectural design and scheduling activities

Owner

Ministry of Land, Transport, and Maritime Affairs (MLTM), South Korea

Project Manager

Ghang Lee, Yonsei University

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible Private

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

glee@yonsei.ac.kr

Does the IDM include?

Please indicate the range of the IDM National

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: glee@yonsei.ac.kr

10 Disposal

Auto ID 52 ID used in the IDM KO_MLTM_004_MEP

Name of the IDM

IDM between architectural design and MEP design activities

Owner

Ministry of Land, Transport, and Maritime Affairs (MLTM), South Korea

Project Manager

Ghang Lee, Yonsei University

Description

Project Manager E-mail

glee@yonsei.ac.kr

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible Private

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM National

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: glee@yonsei.ac.kr

Auto ID 53 ID used in the IDM KO_MLTM_005_STR

Name of the IDM

IDM between architectural design and structural engineering activities

Owner

Ministry of Land, Transport, and Maritime Affairs (MLTM), South Korea

Project Manager

Ghang Lee, Yonsei University

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible Private

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

glee@yonsei.ac.kr

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM National

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: glee@yonsei.ac.kr

10 Disposal

Auto ID 60 ID used in the IDM

Name of the IDM

CIS/2 interface

Owner

AISC

Project Manager

Chuck Eastman

IDM Status

URL ?????

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

????

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

????

Is the IDM supported by software?

Which software product?

????

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM Private organisation

Who is the Initiator of the IDM?

AISC????

What is the Scope of the IDM?

????

Project Manager E-mail

charles.eastman@coa.gatech.edu

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 61 ID used in the IDM COBIE

Name of the IDM

North American Construction Operations Building Information Exchange Information

Exchange (COBIE) standard

Owner

Project Manager

Bill East

IDM Status Approved

URL http://idm.buildingsmart.no/confluence/display/IDM/COBIE+Project

IDM available in English

Please specify the languages the IDM is available in

Description

Requirement for COBIE were facility Operations, Maintenance, and Asset Management

personnel in conjunction with construction contractors.

Project Manager E-mail

Bill.W.East@usace.army.mil

Accessible Public

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM Cluster

Who is the Initiator of the IDM?

National Aeronautics and Space Administration and White House Office of Science and

Technology Policy.

What is the Scope of the IDM?

COBIE contains information information describing the operations, maintenance, and assets

in capital facilities. The authoritative sources for this information include designers, builders,

installers, and manufacturers.

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 62 ID used in the IDM GSA-003

Name of the IDM

Architectural Design to Building Energy Analysis

Owner

US General Services Administration

Project Manager

Richard See

IDM Status Draft

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible Public

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Architectural building information model can be used as basis for energy simulation. Only

the relevant subset of the architectural model is exchanged.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Architectural Design to Building Energy Analysis

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

richsee@digitalalchemypro.com

Does the IDM include?

Please indicate the range of the IDM Public organisation

Who is the Initiator of the IDM?

US Government Services Administration

What is the Scope of the IDM?

Site context, Building energy budget, Thermal Zones and information about target

conditions, Space information for energy analysis ,Building elements thermal performance,

Photovoltaic arrays

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 63 ID used in the IDM GSA-006

Name of the IDM

Early Concept Design to Analysis

Owner

US General Services Administration

Project Manager

Peggy Ho

Description

????

Project Manager E-mail

peggy.ho@gsa.gov

IDM Status Idea

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM Public organisation

Who is the Initiator of the IDM?

US General Services Administration

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 64 ID used in the IDM GSA-004

Name of the IDM

Architectural Design to Quantity Takeoff for Cost Estimating

Owner

US General Services Administration

Project Manager

Richard See

IDM Status Draft

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible Public

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

This view defines the subset of the data created in architectural design software, which is

useful for quantity take-off purposes.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

http://www.blis-project.org/IAI-MVD/

Project Manager E-mail

richsee@digitalalchemypro.com

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM Public organisation

Who is the Initiator of the IDM?

US General Services Administration

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 65 ID used in the IDM NOW-001

Name of the IDM

Nordic Energy Analysis

Owner

Statsbygg and Senate Properties

Project Manager

Jiri Hietanen

IDM Status Approved

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible Public

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

NOW-001 is a subset of the Concept Design BIM

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM Public organisation

Who is the Initiator of the IDM?

What is the Scope of the IDM?

Project Manager E-mail

jiri.hietanen@datacubist.com

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 66 ID used in the IDM UF-DCP-001

Name of the IDM

Masonry Structural Design to Structural Analysis

Owner

Univ of Florida - College of Design, Construction & Planning

Project Manager

Nawari O. Nawari

IDM Status Idea

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Description

?????

Project Manager E-mail

nnawari@ufl.edu

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 67 ID used in the IDM UF-DCP-002

Name of the IDM

Wood Structural Design to Structural Analysis

Owner

Univ of Florida - College of Design, Construction & Planning

Project Manager

Nawari O. Nawari

IDM Status Idea

URL http://www.blis-project.org/IAI-

MVD/reporting/listMVDs_4.php?SRT=Name&MVD=

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

nnawari@ufl.edu

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 68 ID used in the IDM

Name of the IDM

Building (Preventative) Maintenance Scheduling

Owner

buildingSMART Alliance

Project Manager

John Messner

Description

A process in which the functionality of the building structure (walls, floors, roof, etc) and

equipment serving the building (mechanical, electrical, plumbing, etc) are maintained over

the operational life of a facility.

Project Manager E-mail

jmessner@engr.psu.edu

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM Cluster

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Part of the "BIM Project Execution Planning Guide"

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 69 ID used in the IDM

Name of the IDM

Building Systems Analysis

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

A process that measures how a building's performance compares to the specified design.

This includes an analysis of the mechanical system operational characteristics including the

energy use of a building.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

jmessner@engr.psu.edu

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 70 ID used in the IDM

Name of the IDM

Asset Management

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

A process in which an organized management system will efficiently aid in the maintenance

and operation of a facility and its assets.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

Project Manager E-mail

jmessner@engr.psu.edu

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 71 ID used in the IDM

Name of the IDM

Space Management and Tracking

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Description

A process in which BIM is utilized to effectively allocate, manage, and track assigned

workspaces and related resources.

Project Manager E-mail

jmessner@engr.psu.edu

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 72 ID used in the IDM

Name of the IDM

Disaster Planning

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

A process in which emergency responders would have access to critical building information

in the form of a model and information system.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

jmessner@engr.psu.edu

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 73 ID used in the IDM

Name of the IDM

Record Modeling

Owner

buildingSMART

Project Manager

John Messner

Description

A process used to depict an accurate representation of the physical conditions,

environment, and assets of a facility. The record model should, as a minimum, contain

information relating to the main architectural and MEP elements.

Project Manager E-mail

jmessner@engr.psu.edu

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Part of the "BIM Project Execution Planning Guide"

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 74 ID used in the IDM

Name of the IDM

Site Utilization Planning

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

A process in which a 4D model is used to graphically represent both permanent and

temporary facilities on site, with the construction activity schedule.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

jmessner@engr.psu.edu

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 75 ID used in the IDM

Name of the IDM

Construction System Design (Virtual Mockup)

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

A process in which 3D System Design Software is used to design and analyze the

construction of a complex building system (e.g. form work, glazing, tie-backs, etc.) in order

to increase planning.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

Project Manager E-mail

jmessner@engr.psu.edu

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 76 ID used in the IDM

Name of the IDM

Digital Fabrication

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Description

A process that utilizes machine technology to prefabricate objects directly from a 3D Model.

The 3D Model is spooled into appropriate sections and inputted into fabrication equipment

for production of system assemblies.

Project Manager E-mail

jmessner@engr.psu.edu

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 77 ID used in the IDM

Name of the IDM

3D Control and Planning (Digital Layout)

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

A process that utilizes a model to layout the building assemblies and produce lift drawings.

Lift drawings are 2D/3D component drawings used by foremen during on site construction.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

jmessner@engr.psu.edu

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 78 ID used in the IDM

Name of the IDM

3D Coordination

Owner

buildingSMART

Project Manager

John Messner

Description

A process in which Clash Detection software is used during the coordination process to

determine field conflicts by comparing 3D models of building systems. The goal of clash

detection is to eliminate the major system conflicts prior to installation.

Project Manager E-mail

jmessner@engr.psu.edu

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Part of the "BIM Project Execution Planning Guide"

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 79 ID used in the IDM

Name of the IDM

Design Authoring

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

A process in which 3D software is used to develop a Building Information Model based on

criteria that is important to the translation of the building’s design.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

jmessner@engr.psu.edu

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 80 ID used in the IDM

Name of the IDM

Engineering Analysis (Structural, Lighting, Energy, Mechanical, Other)

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

A process in which intelligent modeling software uses the BIM model to determine the most

effective engineering method based on design specifications.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

Project Manager E-mail

jmessner@engr.psu.edu

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 81 ID used in the IDM

Name of the IDM

Sustainability (LEED) Evaluation

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Description

A process in which a project is evaluated based on LEED or other sustainable criteria. This

can refer to materials, performance, or a process.

Project Manager E-mail

jmessner@engr.psu.edu

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 82 ID used in the IDM

Name of the IDM

Code Validation

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

A process in which code validation software is utilized to check the model parameters

against project specific codes. Code validation is currently in its infant stage of development

within the U.S. and is not in widespread use.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

jmessner@engr.psu.edu

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 83 ID used in the IDM

Name of the IDM

Design Reviews

Owner

buildingSMART

Project Manager

John Messner

Description

A process in which a 3D model is used to showcase the design to the stakeholders, evaluate

meeting the program, and set criteria such as layout, sightlines, lighting, security,

ergonomics, acoustics, textures and colors, etc.

Project Manager E-mail

jmessner@engr.psu.edu

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Part of the "BIM Project Execution Planning Guide"

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 84 ID used in the IDM

Name of the IDM

Programming

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

A process in which a spatial program is used to efficiently and accurately assess design

performance in regard to spatial requirements.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

jmessner@engr.psu.edu

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 85 ID used in the IDM

Name of the IDM

Site Analysis

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

A process in which BIM/GIS tools are used to evaluate properties in a given area to

determine the most optimal site location for a future project.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

Project Manager E-mail

jmessner@engr.psu.edu

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 86 ID used in the IDM

Name of the IDM

Phase Planning (4D Modeling)

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Description

A process in which a 4D model (3D models with the added dimension of time) is utilized to

effectively plan the phased occupancy in a renovation, retrofit, addition, or to show the

construction sequence and space requirements on a building site.

Project Manager E-mail

jmessner@engr.psu.edu

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 87 ID used in the IDM

Name of the IDM

Cost Estimation

Owner

buildingSMART

Project Manager

John Messner

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

A process in which a BIM model can be used to generate an accurate quantity take-off and

cost estimate early in the design process and provide cost effects of additions and

modifications with potential to save time and money and avoid budget overruns.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

jmessner@engr.psu.edu

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Part of the "BIM Project Execution Planning Guide"

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 88 ID used in the IDM

Name of the IDM

Existing Conditions Modeling

Owner

buildingSMART

Project Manager

John Messner

Description

A process in which a project team develops a 3D model of the existing conditions for a site,

facilities on a site, or a specific area within a facility. This model can be developed in

multiple ways depending on what is desired and what is most efficient.

Project Manager E-mail

jmessner@engr.psu.edu

IDM Status

URL http://bim.psu.edu/Project/default.aspx

IDM available in English

Please specify the languages the IDM is available in

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Part of the "BIM Project Execution Planning Guide"

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 89 ID used in the IDM

Name of the IDM

Criteria Checking Update to AR-5 IFC Early Design

Owner

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 90 ID used in the IDM

Name of the IDM

Program Checking- development of tabular data- pre-IDM

Owner

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

Project Manager E-mail

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 91 ID used in the IDM SPARKie

Name of the IDM

Electrical System

Owner

Project Manager

Bill East, Nick Nisbet

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Description

Project Manager E-mail

nn@aec3.com; bill.east@us.army.mil

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 92 ID used in the IDM WUSie

Name of the IDM

Water Use System information exchange

Owner

Project Manager

Bill East, Nick Nisbeth

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

bill.east@us.army.mil; nn@aec3.com

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 93 ID used in the IDM

Name of the IDM

HVAC Information Exchange

Owner

ASHRAE

Project Manager

Description

Project Manager E-mail

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

Auto ID 94 ID used in the IDM

Name of the IDM

BAMie- Building Automation - Control Systems

Owner

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 95 ID used in the IDM

Name of the IDM

Resource Utilization

Owner

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

Project Manager E-mail

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 96 ID used in the IDM

Name of the IDM

Move Management

Owner

USCG/AEC Infosystems

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Description

Project Manager E-mail

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 97 ID used in the IDM

Name of the IDM

AHUS_Electrical

Owner

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: nn@aec3.com

10 Disposal

Auto ID 98 ID used in the IDM

Name of the IDM

BSA_Concept_Design_Phase_Energy_Analysis

Owner

Project Manager

Description

Project Manager E-mail

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: nn@aec3.com

Auto ID 99 ID used in the IDM

Name of the IDM

BSA_Prepare_Adjust_BIM_for_Energy_Analysis

Owner

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: nn@aec3.com

10 Disposal

Auto ID 100 ID used in the IDM

Name of the IDM

energy_assessment

Owner

US Army CE – ERDC

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

Project Manager E-mail

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: nn@aec3.com

10 Disposal

Auto ID 101 ID used in the IDM

Name of the IDM

equipment_layout

Owner

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Description

Project Manager E-mail

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: nn@aec3.com

10 Disposal

Auto ID 102 ID used in the IDM

Name of the IDM

excavation

Owner

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: nn@aec3.com

10 Disposal

Auto ID 103 ID used in the IDM

Name of the IDM

Regulating_US_Building_Construction

Owner

Project Manager

Description

Project Manager E-mail

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: nn@aec3.com

Auto ID 104 ID used in the IDM

Name of the IDM

service_life_planning

Owner

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: nn@aec3.com

10 Disposal

Auto ID 105 ID used in the IDM SPie

Name of the IDM

Specifiers Properties information exchange

Owner

Project Manager

IDM Status Work in progess

URL http://www.buildingsmartalliance.org/projects/activeprojects/32

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

Project Manager E-mail

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 106 ID used in the IDM

Name of the IDM

Wall Assemblies information exchange

Owner

Project Manager

IDM Status Work in progess

URL http://www.buildingsmartalliance.org/projects/activeprojects/110

IDM available in English

Please specify the languages the IDM is available in

Description

Project Manager E-mail

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 107 ID used in the IDM Qtie

Name of the IDM

Quantity Take-Off information exchange

Owner

Project Manager

IDM Status Work in progess

URL http://www.buildingsmartalliance.org/projects/activeprojects/57

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: d.davis@aecinfos

10 Disposal

Auto ID 108 ID used in the IDM CAPEX

Name of the IDM

Capital expenditure

Owner

UK Government

Project Manager

Description

The process and data requirements throughout the design/construction cycle

Project Manager E-mail

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: nn@aec3.com

Auto ID 109 ID used in the IDM OPEX

Name of the IDM

Operational expenditure

Owner

UK Government

Project Manager

IDM Status

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

The process and data requirements throughout the use life cycle

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

Does the IDM include?

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

What is the Scope of the IDM?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: nn@aec3.com

10 Disposal

Auto ID 110 ID used in the IDM

Name of the IDM

Information exchanges between operators, designers and surveyors

Owner

Region Bourgogne, France

Project Manager

Bernard FERRIES

IDM Status Work in progess

URL http://lra.toulouse.archi.fr/club-des-usages/file.php/27/IDM_scope.pdf

IDM available in English

Please specify the languages the IDM is available in

French

Accessible By request

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Operator needs information about new and existing buildings for maintenance and

exploitation purpose. This info. is provided by designers and surveyors. Other exchanges

also occur between operator and designer each time a building is significant modified.

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

ACtive3D, Revit

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Région Bourgogne, France.

What is the Scope of the IDM?

IDM covers up to 4 different exchange requirements. See URL for map.

Project Manager E-mail

ferries@laurenti.com

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: ferries@laurenti.c

10 Disposal

Auto ID 111 ID used in the IDM SRS

Name of the IDM

System Requirements Specification

Owner

Ministery of Transport - The Netherlands

Project Manager

Henk Schaap

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Description

This IDM is used on the interface between a client and a consulting firm; it is also used on

the interface between a client and a contractor as a standard to make the requirement

specification available.

Project Manager E-mail

h.schaap@gobar.nl

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Smarteam/FS

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Ministery of Transport in The Netherlands

What is the Scope of the IDM?

Requirements specification in Civil Engineering

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: h.schaap@gobar.

10 Disposal

Auto ID 112 ID used in the IDM

Name of the IDM

Building Programming

Owner

Statsbygg

Project Manager

Frode Mohus

IDM Status Draft

URL

hVp://iug.buildingsmart.com/idms/informaKon-delivery-manuals/idm-

IDM available in English

Please specify the languages the IDM is available in

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

Building programming is the process of collecting all requirements the building must fulfill

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Project Manager E-mail

fm@statsbygg.no

Does the IDM include?

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Justin Wong

What is the Scope of the IDM?

To effectively transfer curtain wall in a meaningful way for energy analysis

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: steen.sunesen@b

10 Disposal

Auto ID 113 ID used in the IDM

Name of the IDM

FM_handover

Owner

Project Manager

Description

ER of Facility Manager to Designer at the end of the construction process (BIM of the

building as built).

Project Manager E-mail

ferries@laurenti.com

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

France

Accessible

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM Public organisation

Who is the Initiator of the IDM?

Regional User Group

What is the Scope of the IDM?

Handover of information about space and equipements to FM systems using IFC.

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Does the IDM include?

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

10 Disposal

Comment

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person:

Auto ID 114 ID used in the IDM HESMOS

Name of the IDM

Design to Energy simulation and Energy related Operation Costs

Owner

Hesmos Consortium

Project Manager

Peter Katranuschkov

IDM Status Draft

URL www.hesmos.eu

IDM available in English

Please specify the languages the IDM is available in

Accessible Private

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

The specification of exchange requirements between different involved parties to enable

economical decision making (energy & cost related) in all phases of a building's life-cycle

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Project Manager E-mail

Peter.Katranuschkov@tu-dresden.de

Does the IDM include?

Is the IDM supported by software?

Which software product?

(under development) Nemetschek Allplan, Olaf Granlund Roomex, nD Navigator, Energy

solver (NANDRAD, THERAKLES)

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM Private organisation

Who is the Initiator of the IDM?

Hesmos Consortium

What is the Scope of the IDM?

It extended and adapted for the spe.objecKves of-life cycle modelling,-the def.of a

gen.mulK-model framework based on,but not limited to,a single std. BIM,and-the

derivation of inf.and processing requirements for the comp.of an intg.vir.energy lab.

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person: tl@aec3.de

10 Disposal

Auto ID 115 ID used in the IDM IDM_12

Name of the IDM

Digital interdisciplinary coordination between consulting parties.

Owner

buildingSMART

Project Manager

Jan Karlshøj

IDM Status Work in progess

URL

IDM available in English

Please specify the languages the IDM is available in

Accessible Public

Is the IDM following ISO 29481? Is the IDM following bSI IDM guideline?

Description

The design phase: Preliminary design and Detailed design

Interaction Maps Process Maps Exchange requirements

Functional parts Business rules Validation test

Is the IDM supported by a MVD?

Name of the MVD if any

Is the IDM supported by software?

Which software product?

Does there exist a software certification procedure to the IDM?

Name of the software certification system

Please indicate the range of the IDM

Who is the Initiator of the IDM?

Digital Convergence in Denmark (CO, Grontmij|CarlBro, MT Højgaard, NCC, Pihl, Rambøll)

What is the Scope of the IDM?

Project Manager E-mail

jan.karlshoej@gravicon.dk

Does the IDM include?

0 Portfolio requirements 1 Concepts of needs

2 Outline feasibility 3 Substantive feasibility

4 Outline conceptual design 5 Full conceptual design

6 Coordinated design (and procurement) 7 Production information

8 Construction 9 Operation and maintenance

Comment

In which of the processes from ISO 22263 can the IDM be used?

In which roles will the IDM be used?

Design architect Engineering companies

Contractors Clients

Operators Facility Manager

Manufacturer Quantity surveyor

E-mail bS IDM Contact person:

10 Disposal

top related