import to israel · 2019. 10. 15. · august 2019 import to israel import to israel ophir benjamin...

Post on 01-Apr-2021

3 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

August 2019

Import to Israel

Import to Israel

Ophir Benjamin Gamliel CEOAddress 1 Bat-Sheva St. POB 6117, LOD 711600 2 IsraelTel 972-8-9186101 Mobile +972543530530 Fax 972-8-9153101

Mail ogamliel@itlglobal.orgWeb import.itlglobal.org

2007‐2016 ITL Leads the import revolution in Israel’s parliament

2017 Private labs

Import Law in Israel

Changes in Import Standards Law

• Opening up of the Import Access to Private

Laboratories

• Designation of

– “Recognized Laboratories” – Testing and COC to SI

– “Approved Laboratories” – COC for Market Access

ITL – The Market Leaders Since 1992

Testing Laboratory ‐ ISO/IEC 17025• 1992 ‐ First safety Lab in Israel  ‐ A2LA ILAC‐MRA• IECEE ‐ First• IECEx – First and Only

Certification Body CB – ISO/IEC 17065• IECEx – First and only• IECEE ‐ First• A2LA – ILAC MRA – First & Only

ITL Mark• ITL Mark

Inspection Body‐ ISO/IEC 17020 • IECEx• OSHA NRTL• 2017 ‐ First ‐ inspection body Natural Gas• Global Partners

ITL Reconitions

NationalNational

Import Overview

1. Introduction2.Country Guideline3.Certification of Conformity (COC)4. Import Permit5. Shipment 6.Conclusions, Q&A

Import service – Electrical products

Guideline - Compliance with Israeli standard

• Any product entering to Israel must comply with Israeli Standard

– Test Reports is sufficient

• Certification Mark is not required for product entry

– Can help faster entry to Israel

– Voluntary but mandatory for listed products

• Location: Asia/Middle East

• Rated voltage:220-240V

• Frequency: 50Hz

• Official language: Hebrew

• Plug standard: SI 32 – IEC 60884

• Standards - SI adapting mainly International Standards, harmonization whenever possible.

Country Information

12/09/2019Slide 10

Main relevant Ministries

NationalNational

Import Procedure

• Recognition = No Testing  • CB Scheme• MOUs based on ILAC or CB Scheme

• Testing ‐ When there is no agreement or a product without Appropriate Test Reports

• Additional Approval – Ministry of Communication, Health, Energy, Transportation

• Recommended to designate an Importer name at this stage.

• Recognition = No Testing  • CB Scheme• MOUs based on ILAC or CB Scheme

• Testing ‐ When there is no agreement or a product without Appropriate Test Reports

• Additional Approval – Ministry of Communication, Health, Energy, Transportation

• Recommended to designate an Importer name at this stage.

Stage 1 ‐ Obtain CoC (certificate of Compliance)  ‐ Safety and EMC

Global Recognitions & Acceptance

MRAs between

countries

MRAs between

countries

MOUs between Labs and

CB

MOUs between Labs and

CB

Partial - ITL Partners (MOUs)

Import Procedure

• Plugs need to be as SI 32 – IEC 60884‐1

• Plug can be purchased locally

• Operation/User manuals and Safety Instructions – Hebrew• Optional at this stage

• Plugs need to be as SI 32 – IEC 60884‐1

• Plug can be purchased locally

• Operation/User manuals and Safety Instructions – Hebrew• Optional at this stage

Stage 1 – Localization

Import Procedure

• Designate a local importer

• Submit request for Import by the local importer

• Designate a local importer

• Submit request for Import by the local importer

Stage 2 – Import Permit Before actual shipping, the following is required

Import Procedure

• Localization –• Voluntary in stage 1 ‐ COC• Required with Shipment for Import Permit – Stage 2

• Operation/User manuals and Safety Instructions ‐ Hebrew

• Labels – On the packaging only not on Product•Manufacture Name – English allowed•Manufacturing Year•Country of Manufacturing – Hebrew•Name of local Importer ‐ Hebrew• Importer Address – Hebrew•Registered trademark – English allowed•Optional – Company #

• Localization –• Voluntary in stage 1 ‐ COC• Required with Shipment for Import Permit – Stage 2

• Operation/User manuals and Safety Instructions ‐ Hebrew

• Labels – On the packaging only not on Product•Manufacture Name – English allowed•Manufacturing Year•Country of Manufacturing – Hebrew•Name of local Importer ‐ Hebrew• Importer Address – Hebrew•Registered trademark – English allowed•Optional – Company #

Stage 2 – Import Permit

Import Procedure

• Upon arrival, Each shipment is being verified

• The designated laboratory picks up randomly one Sample from the Shipment for evaluation at the lab.

• The sample will be verified against the originally tested product for authenticity 

• Upon arrival, Each shipment is being verified

• The designated laboratory picks up randomly one Sample from the Shipment for evaluation at the lab.

• The sample will be verified against the originally tested product for authenticity 

Stage 3 – Shipment verification 

Import Procedure

• Compliance approval

• The designated laboratory recommend a release from Custom electronically.

• Halleluiah = Custom Release 

• Compliance approval

• The designated laboratory recommend a release from Custom electronically.

• Halleluiah = Custom Release 

Stage 4 – Custom Release

ITL Mark

• True certification mark for easy market access

• Save cost on shipping/s

• Factory Inspections using CIG format with partners under

MOU

Why Choose ITL?

• Fast time to market

• Widest support of Israel Ministries

• Professional service and 27 years of hands on experience

– Import department is 100% supported by the experienced team in the safetyand EMC labs

• Proactive client support during approval process

– To avoid complications and delay in shipments.

ITL Partnership

Market Access You can trust

Expertise Experience Quality Delivery

The Market Leaders

ITL

Thank You!

Ophir Benjamin Gamliel CEOAddress 1 Bat-Sheva St. POB 6117, LOD 711600 2 IsraelTel 972-8-9186101 Mobile +972543530530 Fax 972-8-9153101

Mail ogamliel@itlglobal.orgWeb import.itlglobal.org

14.5 cm x 12.2 cm

Energy Rating Label Introduction

12/09/2019 Slide 24

On September 18th, 2008, the government decided to promote energy efficiency measures in order to reduce electricity consumption. As part of this decision, the government had set a guiding objective ‐ to reduce electricity consumption by 20% until the year 2020.

The purpose of this paper is to assess the extent of energy efficiency that can be attained in all sectors; and as a consequence – the energy efficiency programs that should be actualized until the year 2020.

Any regulated product can not be imported or put into market without satisfying the efficiency energy requirements in Israel.

Energy Rating Label 

label for air conditioner

label for refrigerator

TÜV SÜD

Regulated Products

12/09/2019 Slide 25

Description…Description…Description…

product energy source regulations Israel standard International Standard

air conditioner  ENERGY EFFICIENCY, ENERGY MARKINGS AND ENERGY RATINGS OF AIR CONDITIONERS) 5765‐2004 SI 994‐1

IEC 60335‐2‐40ISO 5151‐1994ISO 13253‐1995

TV set The Energy Sources Regulations (Maximum Electric Output for a Television Receiver), 5771‐2011 SI 62087  IEC 62087

standby mode Maximum Electric Output in Standby Mode for Domestic and Office Electric Appliances), 5771‐2011 SI 62301  IEC 62301

Washing Machines SI 900‐2.7 EN 60456

Dish Washers SI 900‐2.5 IEC 60704‐3EN 50242

Dryers SI 900‐2.1 EN 61121

Electric Ovens SI 900‐2.6 EN 50304

Refrigerators

Energy Resources Regulations(Energy Efficiency and Energy Information of Cooling Appliances)

5744 ‐ 2004 SI 721 ISO 15502 tropical environment.

Lamps Minimal Energetic Efficiency for Indoor Light Bulb) 5771‐2011* SI 60432 IEC 60432

Energy Rating Label Application Requirements

12/09/2019 Slide 26

Items Requirements

1. Acceptance of test report Reports issued by an approved laboratory

2.     Local Representative Required, for permit to release

3.     License holder local importer

4.     Factory inspection requirement Not required

top related